Glencore releases third quarter 2019 production report

Published: Oct 28, 2019 14:20

SMM news: recently, Glencore Group released a production report. Copper production from its own sources was 1015800 tons, a decrease of 47300 tons (4 per cent) over the same period last year, mainly reflecting that: (i) Mutanda had reoptimized its 100000 tons / year plan (from 200000 tons), which had an impact on the current period of 67000 tons. Ii closed the Mopani smelter for large-scale renovation (21,600 tons of metal); (iii) sold / consumed two South American assets (20200 tonnes) during the benchmark period, partially offset by an increase in Katanga (66500 tonnes).

The production of self-produced cobalt was 34400 tons, an increase of 5900 tons (21 per cent) over the same period last year, mainly reflecting the increase in Katanga province.

Zinc production from its own sources was 809200 tons, an increase of 23100 tons (3 per cent) over the same period last year, mainly reflecting the contribution of the Lady Loretta mine (Mount Issa) and the increase in production on the MacArthur River, which was partly offset by the decline in Antamina production. It is expected that there will be a temporary transition to the lower zinc-bearing area of the mine, while the output of the Kazzinc mine will be reduced, mainly related to the surface stability of the Tishinsky mine.

Production of own nickel was 89400 tons, slightly lower than the same period last year (2 per cent), mainly due to the challenging first half of 2019 production period for Konibo (Koniambo).

Attributable production of ferrochromium was 1030000 tons, a decrease of 115000 tons (10 per cent) from the same period last year, mainly related to the additional maintenance days carried out in the third quarter of 2019.

Coal production was 104 million tons, an increase of 7.3 million tons (8 per cent) over the same period last year, mainly reflecting the full-year impact of the acquisition of HVO and Hail Creek in 2018, as well as the increase in production by Prodeco following the increase in mine development in 2018, this cost was partly offset by a decline in Cerrej ó n production due to dust constraints.

Oil production under entitlements was 3.6 million barrels, an increase of 300000 barrels (8 per cent) over the same period last year, reflecting Chad's association with ongoing drilling activities and the first increase in oil in the Bolongo bloc in Cameroon, partly offset by the natural decline in the equator.

"Click to sign up for a thousand people event in China's non-ferrous metals industry.

Share the China Nonferrous Metals Industry Annual meeting registration link to the circle of friends or WeChat group of more than 100 people, and send screenshots to the WeChat account below to get the right to view "SMM Metal Breakfast" for one year (the original price is 300 yuan / year).

Scan QR code plus WeChat

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
11 hours ago
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
Read More
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
At 9:58 on September 12, the core smelting furnace of the pyrometallurgy system at Yingkou Jianfa Shenghai Nonferrous Metals & Chemicals Co., Ltd.'s multi-metal recovery project was successfully ignited, officially entering the furnace drying stage and marking a key step toward full-line commissioning and production. Public information shows that the Yingkou Jianfa Shenghai polymetallic complex gold-silver ore comprehensive recovery technology upgrade, relocation, and expansion project uses copper concentrates as its main raw material, with an overall planned capacity of 600,000 mt/year of copper cathode to be built in two phases, with capacity of 300,000 mt/year in each phase. Phase I is designed to produce 300,000 mt/year of copper cathode and 1.18 million mt/year of sulphuric acid, along with supporting systems for smelting, converting, anode refining, electrolysis, slag beneficiation, and precious metal recovery. After this ignition, the project will carry out standardized furnace drying and hot-state integrated trial runs across the entire system to verify equipment, instruments, interlocks, and automatic control systems. The project has not yet formally started raw material feeding and production; after furnace drying and system commissioning are completed, it will further advance the commissioning of Phase I's 300,000 mt/year copper cathode capacity. If the project is successfully brought into production, it is expected to increase copper smelting capacity in North China and further boost domestic demand for copper concentrate raw materials.
11 hours ago
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Sep 12, 2026 01:13
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Read More
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Alchemy Resources announced on September 11 that reverse-circulation drilling has commenced across its Yellow Mountain and Overflow projects in New South Wales, Australia, with up to 15 holes planned during the latest exploration campaign.​ At the 80%-owned Yellow Mountain project, drilling will test extensions to previously identified copper-gold and polymetallic mineralisation, as well as two previously undrilled geophysical targets.​ Previous drilling at Yellow Mountain returned an intersection of 113 metres grading 1.17% copper equivalent, comprising 0.33% copper, 0.37 g/t gold, 24.3 g/t silver, 0.86% lead and 1.23% zinc. The latest drilling campaign is designed to test whether the known mineralised system extends into newly identified target areas.​ The program will also include drilling at the Overflow project, where Alchemy is targeting extensions to existing mineralisation along strike and at depth. Overflow currently hosts an inferred mineral resource of approximately 342,000 ounces of gold equivalent and contains gold, silver, copper, lead and zinc mineralisation.​ The commencement of drilling provides a near-term test of the scale and continuity of mineralisation at Yellow Mountain. The previously reported broad copper-gold-polymetallic intersection indicates potential for a sizeable mineralised system, while the newly defined geophysical targets provide additional exploration upside. Drilling results will be important in determining whether the mineralised footprint can be materially expanded.
Sep 12, 2026 01:13
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Sep 12, 2026 01:10
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Read More
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Freeport-McMoRan Chief Executive Officer Kathleen Quirk has indicated that the company expects to move forward with the proposed expansion of its Bagdad copper mine in Arizona, marking a stronger commitment to the project ahead of a formal investment decision. Speaking at the Jefferies Global Industrials Conference on September 10, Quirk said the project still requires input from Freeport's board but that she expects the company will proceed. She described the expansion as a roughly three-year construction project and noted that no major permitting hurdles are expected. Freeport's latest project estimates put capital expenditure for the Bagdad expansion at approximately US$4.5 billion, around 30% above the previous US$3.5 billion estimate, reflecting cost escalation, scope changes and additional engineering. The project would more than double concentrator capacity at Bagdad and is expected to add approximately 200–250 million lb, or around 91,000–113,000 tonnes, of copper production annually, alongside an additional 10–12 million lb of molybdenum. Bagdad currently has a reserve life exceeding 80 years. Freeport's Q2 2026 regulatory filing had described the project as being prepared for a potential investment decision during the second half of 2026. The latest comments therefore represent a more positive signal from management on the likelihood of development, although formal board approval has not yet been announced. A decision to proceed with Bagdad would represent one of Freeport's most significant near-term copper growth investments in the US. The potential addition of more than 90,000 tonnes per year of copper would materially increase Freeport's US output, although first production would remain several years away given the expected construction period. Attention will now turn to formal board approval and a final investment decision.
Sep 12, 2026 01:10