October 18 Tianjin zinc spot news: disk finishing rising water loose today transaction is still light

Published: Oct 18, 2019 11:31
SMM, October 18, Tianjin market zinc ingot mainstream transaction in 18820-20250 yuan / ton, ordinary brand mainstream transaction in 18770-18930 / ton, the 1911 contract rose 70-200 yuan / ton, the rising water in Tianjin market is stable at 30 yuan / ton compared with Shanghai market.

SMM, October 18, Tianjin market zinc ingot mainstream transaction in 18820-20250 yuan / ton, ordinary brand mainstream transaction in 18770-18930 / ton, the 1911 contract rose 70-200 yuan / ton, the rising water in Tianjin market is stable at 30 yuan / ton compared with Shanghai market. Refinery shipments are normal today. In the market, the supply tension has eased slightly, but the overall situation is still tight. The quotation of high-priced brand source is concentrated in about 160-200 yuan / ton of 11 liter water, and the quotation of ordinary brand source is about 70-140 yuan / ton of 11 liter water. Disk finishing operation, rising water is still deadlocked, the market buying interest is lower, the shippers are more willing to ship, but the downstream receiving interest is not high, the holders slightly down the rising water, the downstream buying is slightly better. Overall, today's deal continues yesterday's light trend. Zi Zijin, Hongye, Bailing, Chi Hong, Xikuang, etc., were traded near 18820-18980 yuan / ton, and Qiao Zijin, Chi Hong and Hongye were traded at 18770-18930 yuan / ton.

"Click to sign up for the 2019 China Zinc oxide Industry chain Trading Summit"

Scan QR code and apply to join SMM metal exchange group, please indicate company + name + main business

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Review and Outlook of the Zinc Market: 2026 May Day Holiday
11 hours ago
Review and Outlook of the Zinc Market: 2026 May Day Holiday
Read More
Review and Outlook of the Zinc Market: 2026 May Day Holiday
Review and Outlook of the Zinc Market: 2026 May Day Holiday
During the May Day holiday in 2026, LME zinc traded in a general sideways range, finding solid support at the 40-day moving average. In terms of specific performance, LME zinc showed an N-shaped trend of rising first, then falling and rebounding again.
11 hours ago
Explosion at Kazzinc Metallurgical Site in Kazakhstan Leaves Two Dead and Five Injured
12 hours ago
Explosion at Kazzinc Metallurgical Site in Kazakhstan Leaves Two Dead and Five Injured
Read More
Explosion at Kazzinc Metallurgical Site in Kazakhstan Leaves Two Dead and Five Injured
Explosion at Kazzinc Metallurgical Site in Kazakhstan Leaves Two Dead and Five Injured
On May 5th, according to Reuters, an explosion occurred at Kazzinc’s site. Kazzinc said that it occurred during cleaning work on a smoke extraction system, followed by a fire and partial structural collapse. So far, emergency ministry said the fire had been extinguished. Kazzinc, owned by Glencore, has an annual production of roughly 250-300 kt of zinc, 100-150 kt of lead and around 87.5 kt of copper cathode. Kazzinc hasn't disclosed the specific impact. Based on currently available information, the incident mainly involved smoke extraction/dust-collection equipment, may cause temporary disruption to related operations. There is no evidence so far that the main zinc electrowinning line was damaged. Further updates needed on the scope of any cuts or suspensions and the repair timeline.
12 hours ago
South32 Raises Hermosa Taylor Capex by Over 50%, Delays Production to 2028 H1
May 1, 2026 21:22
South32 Raises Hermosa Taylor Capex by Over 50%, Delays Production to 2028 H1
Read More
South32 Raises Hermosa Taylor Capex by Over 50%, Delays Production to 2028 H1
South32 Raises Hermosa Taylor Capex by Over 50%, Delays Production to 2028 H1
On April 30th, South32 raised the development cost estimate for the Taylor deposit at its Hermosa zinc-silver project in Arizona, US, and delayed the timeline. First-stage capital expenditure has increased by more than 50%, from $2.2 billion in the 2024 FS to $3.3 billion. First production has been delayed by one year to H2 FY2028, full production has also been pushed back to FY2031. Cost increase was mainly due to contractor underperformance, slower-than-expected construction productivity, scope changes, inflation, US tariffs and higher input costs. Progress on a key ventilation shaft is the main bottleneck now. But the company also noted that ore reserves at Taylor increased by 52%, mineral resources rose by 10%, extending the expected mine life from 28 years to around 33 years.
May 1, 2026 21:22