October 18 Tianjin zinc spot news: disk finishing rising water loose today transaction is still light

Published: Oct 18, 2019 11:31 (GMT+8)
SMM, October 18, Tianjin market zinc ingot mainstream transaction in 18820-20250 yuan / ton, ordinary brand mainstream transaction in 18770-18930 / ton, the 1911 contract rose 70-200 yuan / ton, the rising water in Tianjin market is stable at 30 yuan / ton compared with Shanghai market.

SMM, October 18, Tianjin market zinc ingot mainstream transaction in 18820-20250 yuan / ton, ordinary brand mainstream transaction in 18770-18930 / ton, the 1911 contract rose 70-200 yuan / ton, the rising water in Tianjin market is stable at 30 yuan / ton compared with Shanghai market. Refinery shipments are normal today. In the market, the supply tension has eased slightly, but the overall situation is still tight. The quotation of high-priced brand source is concentrated in about 160-200 yuan / ton of 11 liter water, and the quotation of ordinary brand source is about 70-140 yuan / ton of 11 liter water. Disk finishing operation, rising water is still deadlocked, the market buying interest is lower, the shippers are more willing to ship, but the downstream receiving interest is not high, the holders slightly down the rising water, the downstream buying is slightly better. Overall, today's deal continues yesterday's light trend. Zi Zijin, Hongye, Bailing, Chi Hong, Xikuang, etc., were traded near 18820-18980 yuan / ton, and Qiao Zijin, Chi Hong and Hongye were traded at 18770-18930 yuan / ton.

"Click to sign up for the 2019 China Zinc oxide Industry chain Trading Summit"

Scan QR code and apply to join SMM metal exchange group, please indicate company + name + main business

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
23 hours ago
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Read More
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Coherent launched PhotonLink, an integrated optics platform for AI infrastructure incorporating Indium Phosphide (InP) lasers, silicon photonics, detectors and optical modules. The company disclosed more than 10 CPO engagements, over 10 NPO engagements and more than five chip-to-chip connectivity projects, with anchor customers and long-term agreements secured for both CPO and NPO. Revenue is expected to begin ramping in Q4 2026. Coherent has shipped over 300 million InP lasers and is expanding its 6-inch InP manufacturing capacity to support the ramp. The customer pipeline provides a clearer commercial demand signal for InP devices and upstream materials, although additional capacity and indium consumption were not disclosed.
23 hours ago
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Oct 02, 2026 10:40 (GMT+8)
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Read More
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Minerals announced that JDS Energy & Mining had completed a preliminary underground inspection at its wholly owned Talisman project in Washington State. No immediate impediment to safe re-entry was identified, and mineralization including sphalerite was observed near the portal and adit. More than 200 soil samples await results. Significant underground work still requires detailed geotechnical assessment, support design and stope inspection. Mineral observations do not establish grade, continuity, tonnage or economic potential.
Oct 02, 2026 10:40 (GMT+8)
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Oct 02, 2026 10:39 (GMT+8)
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Read More
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Windfall Geotek announced renewal of 592 hectares of claims in Canada’s Bathurst Mining Camp. Zinc targets at Upper Sprig Brook were generated using an AI model trained on zinc-copper assays from seven local volcanogenic massive sulphide deposits. The company plans historical-data compilation and rock or soil sampling to advance target validation and subsequent drill targeting. No new drilling assays or mineral resource estimate were announced.
Oct 02, 2026 10:39 (GMT+8)