SMM10, March 15: Nyrstar announced Monday that its Langlois zinc mine will stop production in December, mainly because local rock conditions have deteriorated and are no longer suitable for mining operations.
In 2018, the zinc concentrate output of the Langlois project reached 24000 tons.
The Langlois zinc mine began production in July 2007, but maintenance began the following year.
Nyrstar acquired the project in 2011 and brought the mine back to operation through the renovation of underground mines and surface infrastructure.

"Click to sign up for the 2019 China Zinc oxide Industry chain Trading Summit"





Scan QR code and apply to join SMM metal exchange group, please indicate company + name + main business
![Nhu cầu tiêu thụ cuối kém, tỷ lệ vận hành kẽm oxit giảm nhẹ [Điểm tin hàng tuần kẽm oxit SMM]](https://imgqn.smm.cn/usercenter/tAyyp20251217171754.jpg)
![Tỷ lệ vận hành hợp kim kẽm đúc áp lực có xu hướng giảm, dự kiến sẽ giảm thêm vào tuần tới [Đánh giá hàng tuần hợp kim kẽm đúc áp lực SMM]](https://imgqn.smm.cn/usercenter/EviJV20251217171754.jpg)
![Tích trữ trước kỳ nghỉ lễ thúc đẩy tồn kho giảm, giá kẽm củng cố ở mức cao [Bản tin kẽm kỳ hạn SMM]](https://imgqn.smm.cn/usercenter/ipTIN20251217171755.jpg)
