SMM Morning Comments (Oct 9)

Published: Oct 9, 2019 09:42
SHFE base metals traded mostly lower overnight

SHANGHAI, Oct 9 (SMM) –

Copper: A stronger US dollar weighed on copper prices overnight, as Fed Chairman Powell said the central bank would expand its balance sheet “soon,” and as Brexit talks between the UK and the European Union were reportedly close to breaking down. Three-month LME copper shed 0.42% on the day and closed at $5,683.5/mt. The most active SHFE 1912 contract slipped to a more than one-month low of 46,530 yuan/mt overnight before it closed 0.51% lower at 46,680 yuan/mt. Copper prices are unlikely to substantially pick up today, as investors tread cautiously ahead of a fresh round of trade negations between Washington and Beijing. Growing worries about the world economy after a slew of disappointing economic data, combined with geopolitical turmoil, will continue to pressure copper prices. LME copper is expected to trade between $5,670-5,720/mt today, with SHFE copper at 46,400-46,900 yuan/mt. Spot premiums are seen firm at 80-120 yuan/mt, as lower prices of futures will deter sellers from lowering their offers.

Aluminium: Three-month LME aluminium on Tuesday climbed to a high of $1,760/mt, the highest in nearly two weeks, before it gave back all those gains to finish the trading day 0.4% lower at $1,744/mt, below the 20-day moving average. Rising LME inventories pressured aluminium prices. The contract is expected to move between $1,730-1,760/mt today. The load-up of long positions shored up the most traded SHFE 1912 contract to a high of 14,020 yuan/mt overnight, before moving averages pressured the contract to give back most of those gains to close a tad higher at 13,960 yuan/mt. Backwardation on SHFE aluminium reflected limited steam in the 1912 contract. The contract is expected to trade between 13,900-14,100 yuan/mt today.

Zinc: Three-month LME zinc fluctuated to close marginally higher at $2,292/mt on Tuesday. Falling LME zinc inventories may lend some support to LME zinc prices, but concerns about global economic slowdown and macro uncertainty will weigh. LME zinc is expected to trade between $2,260-2,310/mt today. The most active SHFE 1911 contract relinquished earlier gains to close 0.19% lower at 18,670 yuan/mt overnight. SMM data showed a smaller-than-expected increase in social inventories of refined zinc across Shanghai, Tianjin and Guangdong over the week-long holiday, which offered some support to SHFE zinc. SHFE zinc is expected to trade rangebound today, as investors monitor developments in US-China trade talks. The SHFE 1911 contract is likely to move between 18,500-19,000 yuan/mt, with spot premiums for 0# Shuangyan at 110-140 yuan/mt over the 1910 contract.

Nickel: Three-month LME nickel slipped past the 10- and 20-day moving averages to a one-week low of $17,135/mt on Tuesday, before it clawed back some losses to close the trading day 1.47% lower at $17,450/mt. LME nickel is expected to try to hold onto the 10-day moving average and the $17,500/mt level today. The most traded SHFE 1912 contract inched down to end at 136,730 yuan/mt overnight, but held onto a tight range around 137,000 yuan/mt. It is expected to try to remain above the five-day moving average today.

Lead: Three-month LME lead dropped 2.04% to end at $2,137.5/mt on Tuesday, pulling back from a 14-month high of $2,192/mt hit on Monday. LME lead temporarily suspended its uptrend, but support is still seen from the technical front. The most active SHFE 1911 contract followed its LME counterpart lower overnight, shedding 0.96% to 17,040 yuan/mt. Support is seen at 17,000 yuan/mt, but a break below that level is expected as consumption will weaken in the fourth quarter and recovering smelter margin will bolster supply.  

Tin: Three-month LME tin fell to a nearly one-week low of $16,250/mt on Tuesday, before it recovered some ground to close the trading day 0.4% lower at $16,370/mt. LME tin now resides around the 10-day moving average, with resistance seen at the 20- and 40-day moving averages, as high as $16,700/mt. As longs added their positions, the most traded SHFE 2001 contract rose 1.35% overnight and ended at 136,320 yuan/mt. The contract now stays around the five-, 10- and 60-day moving averages, and resistance is seen at 136,500 yuan/mt.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
3 hours ago
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
Read More
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
3 hours ago
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
7 hours ago
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
Read More
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
[SMM Flash] Greenland Mines has completed a 104.8-tonne bulk-sampling programme across seven sites at its Skaergaard palladium-platinum-gold project in East Greenland. The samples are being prepared for large-scale and pilot-scale metallurgical testwork at GTK Mintec in Finland, while the company continues engineering, processing, infrastructure and waste-management studies aimed at advancing the project's technical evaluation. Skaergaard's S-K 1300 resource currently comprises approximately 15.0 million oz PdEq Indicated and 17.49 million oz PdEq Inferred, according to Greenland Mines. The bulk-testing programme represents an important step in evaluating processing and recovery options for one of the larger undeveloped palladium-platinum-gold systems outside the major South African, Zimbabwean and Russian supply regions. However, the reported Mineral Resources are not Mineral Reserves and the latest programme does not constitute a development or commercial production decision.
7 hours ago
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
7 hours ago
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
Read More
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
[SMM Flash] Two Rivers, the South African PGM joint venture between African Rainbow Minerals and Impala Platinum, is advancing technical validation work for its Merensky project on the eastern limb of the Bushveld Complex. Early-works capital was approved during FY2026 to complete studies required to determine the project's way forward. The Merensky concentrator was commissioned during the six months to December 2024 but was subsequently placed on care and maintenance amid challenging PGM market conditions. The project has a stated capital cost of approximately R7.3 billion and is designed to produce around 182,000 6E PGM oz/year at steady state, alongside approximately 1,600 tonnes/year of nickel and 1,300 tonnes/year of copper. A restart could therefore provide meaningful incremental PGM supply from an existing South African operation. However, the project remains under technical validation and no restart date or final decision to resume production has been announced.
7 hours ago