SMM Evening Comments (Oct 8)

Published: Oct 8, 2019 18:19
SHFE nonferrous metals ended mixed on the first trading day after the week-long National Day holiday

SHANGHAI, Oct 8 (SMM) – SHFE nonferrous metals ended mixed on Tuesday October 8, the first trading day after the week-long National Day holiday. Lead was the best performer with a rise of 1.53%. Aluminium gained 0.04%, tin advanced 0.8%, while copper shed 0.66%, zinc lost 0.16%, and nickel edged lower.

The ferrous composite fell for the most part as rebar slipped 2.32%, hot-rolled coil eased 1.84%, coke fell 0.24%, stainless steel dipped 0.13%, while iron ore continued to climb 0.77%. 

Copper: The most-active SHFE copper contract moved to the December contract today, which dropped to an intraday low of 46,800 yuan/mt and ended 0.66% lower on the day at 46,820 yuan/mt. Deteriorating macroeconomic development during the holiday and a firm US dollar kept copper prices under pressure. The November contract remained in discounts, of around 50 yuan/mt, against the December contract. With heavy pressure from the 40-day moving average, the December contract may test support from 46,800 yuan/mt tonight. 

Zinc: Departing shorts sent the most-traded SHFE November contract to an intraday high of 18,795 yuan/mt, but pressure above from the 10-day moving average capped its upsides and ended it 0.16% lower at 18,700 yuan/mt. Open interests lost 13,068 lots to 159,000 lots. The KDJ indicators expanded upwards, indicating upward momentum in the contracts tonight. A pickup in spot traders and less-than-expected buildup in social inventories of zinc may also support prices. Tonight, pressure above from the 10-day moving average will be monitored. 

Nickel: The most-traded SHFE nickel contract switched to the December contract, which rebounded after fell below the five-day moving average to a low of 134,310 yuan/mt, closing down 0.04% at 137,000 yuan/mt. It is expected to test support from the 137,000 yuan/mt level tonight. 

Lead: A strong LME lead during the holiday boosted the most-liquid SHFE November contract to a nearly three-week high of 17,280 yuan/mt, before longs booked profits and left, sending the contract to 17,205 yuan/mt at closing, up 1.53% on the day. Limited upside room is expected in the contract as spot traders were subdued at the end of a traditional peak season for lead consumption. High margins will spur the production of secondary lead, which is set to grow supplies and pressure lead prices. 

Tin: The most-liquid SHFE January 2020 contract grew after declined, hitting a high of 135,640 yuan/mt and ending up 0.8% at 135,260 yuan/mt. The contract remained in a rangebound trend with support expected at 134,000 yuan/mt and resistance at 136,500 yuan/mt tonight. 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
ARM to Invest $840M in Bokoni Platinum Restart, Raising Cash Flow Concerns Despite Market Potential
10 hours ago
ARM to Invest $840M in Bokoni Platinum Restart, Raising Cash Flow Concerns Despite Market Potential
Read More
ARM to Invest $840M in Bokoni Platinum Restart, Raising Cash Flow Concerns Despite Market Potential
ARM to Invest $840M in Bokoni Platinum Restart, Raising Cash Flow Concerns Despite Market Potential
African Rainbow Minerals (ARM) plans to reopen Bokoni Platinum in South Africa with R15.2 billion in investment over seven years, targeting annual PGM production of up to 400,000 ounces from around 2030. The project follows a new feasibility study and a previous R2.2 billion impairment in ARM’s 2025 financial year. The restart has raised investor concerns over capital intensity and near-term cash generation, particularly if ARM also proceeds with the Two Rivers Merensky project. RMB Morgan Stanley estimates that funding both projects could push ARM into negative free cash flow for two to three years. ARM shares reportedly fell sharply following the Bokoni announcement. However, the project could benefit from improving PGM market fundamentals. South African PGM production is declining while renewed automotive demand, supported by slower-than-expected EV adoption, could strengthen prices. ARM entered the project with a strong balance sheet, including R9.5 billion in net cash at end-June. Bokoni's restart could add significant future PGM supply, but its high capital requirements and challenging mining history create execution and cash-flow risks for ARM.
10 hours ago
AI Data Centre Demand Could Widen PGM Deficits
12 hours ago
AI Data Centre Demand Could Widen PGM Deficits
Read More
AI Data Centre Demand Could Widen PGM Deficits
AI Data Centre Demand Could Widen PGM Deficits
[SMM Express] AI-driven data centre expansion is emerging as a new source of platinum group metals (PGMs) demand that could further tighten markets already facing supply deficits. Valterra Platinum reportedly estimates AI-linked data centre demand for PGMs at 200,000–400,000 ounces, with potential to increase fivefold by 2030. The additional demand is particularly relevant for platinum and ruthenium, which are already forecast to remain in deficit in 2026. Platinum's full-year deficit forecast has been raised to 297,000 ounces, while above-ground stocks are expected to fall below three months of global demand cover by year-end. Meanwhile, hybrid vehicle growth is helping sustain automotive PGM demand despite rising battery-electric vehicle adoption. However, palladium remains an exception, with its weaker performance linked largely to an unresolved US trade dispute rather than AI-related demand.
12 hours ago
Platinum-Based Fuel Cell Technology Could Support Data Centre Power Demand
15 hours ago
Platinum-Based Fuel Cell Technology Could Support Data Centre Power Demand
Read More
Platinum-Based Fuel Cell Technology Could Support Data Centre Power Demand
Platinum-Based Fuel Cell Technology Could Support Data Centre Power Demand
Researchers at Washington University in St. Louis and partner institutions have developed a new platinum-cobalt catalyst design that could improve the durability and efficiency of low-temperature fuel cells, potentially supporting power generation for data centres. The technology uses platinum-cobalt nanoparticles confined within hollow carbon nanochannels, helping prevent the nanoparticles from clumping or degrading during operation. Platinum is widely used as a fuel-cell catalyst because of its high catalytic performance but its cost remains a key challenge. Accordingly, the new catalyst maintained around 85% of its performance during testing designed to simulate 25,000 hours of operation. The development could have implications for platinum demand if fuel cells become more widely adopted for distributed power generation. This is particularly relevant as data-centre electricity consumption is expected to rise significantly with growing digital and AI infrastructure. However, further development and commercial validation will be required before large-scale deployment.
15 hours ago
SMM Evening Comments (Oct 8) - Shanghai Metals Market (SMM)