[brief Review of Zinc in SMM period] short positions are mainly short during the day and pay attention to the suppression of the 10-day moving average at night.

Published: Oct 08, 2019 16:45 (GMT+8)

SMM10, 8 March:

 

During the day, the Shanghai zinc main force 1911 contract jumped down to 18665 yuan / ton, and at the beginning of the day Shanghai zinc was slightly sorted down 18630 yuan / ton, and then the short withdrawal boosted Shanghai zinc upward to 18710 yuan / ton near the first line. In the afternoon, the short bears left again, and the Shanghai zinc uplink rose 18795 yuan / ton. however, under the suppression of the 10-day EMA above, the Shanghai zinc pressure fell back to 18730 yuan / ton, and the Shanghai zinc at the end of the day steadily broke through the daily moving average support again. It closed down at 18700 yuan / ton, down 30 yuan / ton, or 0.16%. The trading volume was reduced by 85388 hands to 111000 hands, and the position was reduced by 13068 hands to 159000 hands. Within days, Shanghai zinc received a small yang line, with a 40-day moving average on the shadow line, and the KDJ index turned upward, showing that Shanghai zinc may have action energy. On the first trading day after the National Day holiday, the cumulative increment of social inventory in the three places was less than expected, and the willingness to buy spot in the lower reaches was stronger. Fundamentals or given Shanghai zinc must go on the action energy, pay attention to the 10-day moving average suppression at night.

 

"Click to sign up for the 2019 China Zinc oxide Industry chain Trading Summit"

Scan QR code and apply to join SMM metal exchange group, please indicate company + name + main business

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Oct 02, 2026 14:34 (GMT+8)
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Read More
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Coherent launched PhotonLink, an integrated optics platform for AI infrastructure incorporating Indium Phosphide (InP) lasers, silicon photonics, detectors and optical modules. The company disclosed more than 10 CPO engagements, over 10 NPO engagements and more than five chip-to-chip connectivity projects, with anchor customers and long-term agreements secured for both CPO and NPO. Revenue is expected to begin ramping in Q4 2026. Coherent has shipped over 300 million InP lasers and is expanding its 6-inch InP manufacturing capacity to support the ramp. The customer pipeline provides a clearer commercial demand signal for InP devices and upstream materials, although additional capacity and indium consumption were not disclosed.
Oct 02, 2026 14:34 (GMT+8)
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Oct 02, 2026 10:40 (GMT+8)
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Read More
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Minerals announced that JDS Energy & Mining had completed a preliminary underground inspection at its wholly owned Talisman project in Washington State. No immediate impediment to safe re-entry was identified, and mineralization including sphalerite was observed near the portal and adit. More than 200 soil samples await results. Significant underground work still requires detailed geotechnical assessment, support design and stope inspection. Mineral observations do not establish grade, continuity, tonnage or economic potential.
Oct 02, 2026 10:40 (GMT+8)
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Oct 02, 2026 10:39 (GMT+8)
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Read More
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Windfall Geotek announced renewal of 592 hectares of claims in Canada’s Bathurst Mining Camp. Zinc targets at Upper Sprig Brook were generated using an AI model trained on zinc-copper assays from seven local volcanogenic massive sulphide deposits. The company plans historical-data compilation and rock or soil sampling to advance target validation and subsequent drill targeting. No new drilling assays or mineral resource estimate were announced.
Oct 02, 2026 10:39 (GMT+8)