Lower margins, environmental curbs reduce scheduled rebar output for Sep  

Published: Sep 6, 2019 10:58
Lower prices eroded rebar profits and environmental cutbacks tightened in north China ahead of the National Day parade in Oct

SHANGHAI, Sep 6 (SMM) – Planned production of construction material rebar shrank from a month ago in September as falling prices eroded rebar profits and environmental cutbacks tightened in north China ahead of the National Day parade in October. 

Rebar scheduled output in September across 31 major producers of long steel in China is expected to fall 2.53% from the actual output in August and stand at 8.36 million mt, an SMM survey showed on Thursday September 5.

Output for domestic sales is planned at 8.16 million mt this month, down 2.59% from August, while scheduled exports are mostly flat on the month at 200,000 mt.

Major steelmaking city of Wu'an in Hebei province deepened its steel production control for September, which will counter the easing cuts in Tangshan for the month.

An SMM survey indicated that stricter curbs in Wu’an will affect pig iron production by 1.34 million mt and demand for iron ore by 1.65 million mt, up 378,200 mt and 650,500 mt, respectively, from the impacted volume in August. 

Falling steel prices during July-August dragged rebar profits from highs and pushed producers to the verge of losses as of early September. This drove some rebar mills to conduct maintenance, which also accounted for the lower output schedule for September.  

This month, southern spot market is expected to face greater supply pressure than the north, as a slew of new capacity will come online in south-west China. 

Expected suspension of construction work in the north during the upcoming National Day will deter the release of local consumption and prompt steelmakers in the north to move cargoes down to the south in advance. 

Separately, SMM survey also showed that the scheduled output of wire rods across surveyed mills rose 5% from the realised output in August, to 2.98 million mt in September.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Zhangye Establishes Waste Lead-Acid Battery Collection Entity with 2,000 mt/year Capacity
May 9, 2026 20:23
Zhangye Establishes Waste Lead-Acid Battery Collection Entity with 2,000 mt/year Capacity
Read More
Zhangye Establishes Waste Lead-Acid Battery Collection Entity with 2,000 mt/year Capacity
Zhangye Establishes Waste Lead-Acid Battery Collection Entity with 2,000 mt/year Capacity
[Waste Lead-Acid Battery Market Dynamics] It was reported that one waste lead-acid battery collection and storage entity has been established in Zhangye City, Gansu Province, namely Zhangye Mingcheng Waste Battery Recycling Co., Ltd., which has obtained the Hazardous Waste Operating License issued by the Department of Ecology and Environment of Gansu Province. The approved operating method and category is the collection (HW31, 900-52) of waste lead-acid batteries, with an operating capacity of 2,000 mt/year. A total of 4 waste lead-acid battery collection sites have been set up across the city.
May 9, 2026 20:23
Feihushan Lead-Zinc Mine Project Advances in Heilongjiang, Aims for 300,000 mt Annual Ore Capacity
Apr 23, 2026 19:50
Feihushan Lead-Zinc Mine Project Advances in Heilongjiang, Aims for 300,000 mt Annual Ore Capacity
Read More
Feihushan Lead-Zinc Mine Project Advances in Heilongjiang, Aims for 300,000 mt Annual Ore Capacity
Feihushan Lead-Zinc Mine Project Advances in Heilongjiang, Aims for 300,000 mt Annual Ore Capacity
[Lead-Zinc Ore Market Dynamics] A project advancement meeting for the Feihushan lead-zinc mine was held this week in Huzhong District, Heilongjiang, chaired by Guan Jingjun, Deputy Secretary of the District Party Committee and District Governor. The total investment for the Feihushan lead-zinc polymetallic mine development project is expected to be 396.7111 million yuan, with all required funds to be self-raised by the enterprise. Upon completion, the project will have an annual capacity of 300,000 mt of raw ore (including 200,000 mt of lead-zinc ore and 100,000 mt of iron ore). The mineral processing products will be lead concentrates, zinc concentrates, and iron ore concentrates, with a service life of 14 years (excluding a 4-year construction period).
Apr 23, 2026 19:50
Yingkou FTZ to Approve 5,000 mt/year Waste Lead-Acid Battery Collection Project
Apr 23, 2026 19:27
Yingkou FTZ to Approve 5,000 mt/year Waste Lead-Acid Battery Collection Project
Read More
Yingkou FTZ to Approve 5,000 mt/year Waste Lead-Acid Battery Collection Project
Yingkou FTZ to Approve 5,000 mt/year Waste Lead-Acid Battery Collection Project
[Waste Lead-Acid Battery Market Dynamics] It was reported that the website of the Yingkou Area of the China (Liaoning) Pilot Free Trade Zone recently published the "Public Notice of the Management Committee of the Yingkou Area of the China (Liaoning) Pilot Free Trade Zone on the Acceptance of the Environmental Impact Assessment Report for the Waste Lead-Acid Battery Collection (5,000 mt/year) Project of Fenghuan (Yingkou) Environmental Technology Co., Ltd." Upon completion, the project will have a waste lead-acid battery turnover capacity of 5,000 mt/a and a maximum storage capacity of 100 mt.
Apr 23, 2026 19:27
Lower margins, environmental curbs reduce scheduled rebar output for Sep   - Shanghai Metals Market (SMM)