Eased production curbs in Tangshan buoy scheduled rebar output for Aug  

Published: Aug 8, 2019 11:12
Aug planned output across 31 major producers of long steel in China is expected to climb 0.78% from the actual output in Jul

SHANGHAI, Aug 8 (SMM) – Looser environmental controls in China's top steelmaking city of Tangshan for August grew the overall scheduled output of rebar across major Chinese mills this month, but the increase failed to meet expectations, an SMM survey found on Wednesday August 7. 

Planned output of rebar in August across 31 major producers of long steel in China is expected to climb 0.78% from the actual output in July and stand at 8.69 million mt, an SMM survey showed.

Rebar output for domestic sales is planned at 8.49 million mt in August, up 6.72% month on month, while scheduled exports are mostly flat on the month at 200,000 mt.

Surveyed steelmakers in the north planned to produce 1.83 million mt of rebar this month, up 6.82% from the actual production in July, and this accounted for the rise in scheduled output.

However, steel mills in central China lowered their planned output by 2.5% on the month, to 1.6 million mt for August, as falling steel prices and higher costs squeezed their margins. Local steel prices were weighed by slower construction demand amid the lingering impact of the rainy season. Steel mills started to use in-plant stocks of iron ore that they procured at high prices, and this grew costs. 

August scheduled rebar output across surveyed mills in other areas limitedly changed from the actual production in July.

Separately, the scheduled output of wire rods at surveyed mills in China is likely to rise 1% from the realised output in July, to 2.91 million mt in August.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
JCC Hongyuan Copper's $200M Expansion Project Aims to Boost Capacity to 550,000 mt by 2027
Sep 7, 2026 15:43
JCC Hongyuan Copper's $200M Expansion Project Aims to Boost Capacity to 550,000 mt by 2027
Read More
JCC Hongyuan Copper's $200M Expansion Project Aims to Boost Capacity to 550,000 mt by 2027
JCC Hongyuan Copper's $200M Expansion Project Aims to Boost Capacity to 550,000 mt by 2027
The 300,000 mt/year copper cathode expansion project of JCC Hongyuan Copper, a subsidiary of Jiangxi Copper Corporation, entered the pre-approval public notice stage of its environmental impact assessment on September 4, with a total investment of approximately 1.416 billion yuan. The project is planned to start construction in September 2026 and be completed in December 2027. Upon completion, JCC Hongyuan's total capacity will jump from 250,000 mt to 550,000 mt.
Sep 7, 2026 15:43
Japanese Yen Increases USD/JPY Drops Below 159 Amid Intervention Speculation
Sep 3, 2026 19:00
Japanese Yen Increases USD/JPY Drops Below 159 Amid Intervention Speculation
Read More
Japanese Yen Increases USD/JPY Drops Below 159 Amid Intervention Speculation
Japanese Yen Increases USD/JPY Drops Below 159 Amid Intervention Speculation
[SMM Precious Metal Express] The Japanese yen spiked sharply during Wednesday's trading, with USD/JPY falling below 159 and closing down 0.92% at 158.69, sparking speculation of Japanese currency intervention. The dollar index also dropped sharply, with a weaker dollar environment providing support for precious metals.
Sep 3, 2026 19:00
Wuhu Approves Environmental Impact Assessment for Anhui Motu's 500,000 kVAh Lead-Carbon Battery Project
Aug 26, 2026 17:02
Wuhu Approves Environmental Impact Assessment for Anhui Motu's 500,000 kVAh Lead-Carbon Battery Project
Read More
Wuhu Approves Environmental Impact Assessment for Anhui Motu's 500,000 kVAh Lead-Carbon Battery Project
Wuhu Approves Environmental Impact Assessment for Anhui Motu's 500,000 kVAh Lead-Carbon Battery Project
[Lead-Acid Battery Enterprise Dynamics] Recently, the Wuhu Municipal Bureau of Ecology and Environment issued an approval opinion, and the environmental impact assessment for the annual production of 500,000 kVAh lead-carbon battery assembly project of Anhui Motu Technology Group Co., Ltd. was officially approved. The enterprise will implement various environmental protection measures in accordance with the requirements of the environmental impact assessment approval, advance subsequent preliminary work, and start the project construction after all conditions are ready.
Aug 26, 2026 17:02
Eased production curbs in Tangshan buoy scheduled rebar output for Aug   - Shanghai Metals Market (SMM)