SMM Evening Comments (Jul 31)

Published: Jul 31, 2019 17:19 (GMT+8)
SHFE nonferrous metals ended mostly lower amid trade uncertainties

SHANGHAI, Jul 31 (SMM) – SHFE nonferrous metals ended mostly lower amid trade uncertainties between China and the US. Lead lost 1.3%, zinc slid 1.2%, copper fell 1.1%, tin eased 0.4%, aluminium shed 0.1%, while nickel extended its increases and climbed 0.3%. 

The ferrous complex traded mixed as coke slipped 1%, rebar and iron ore lost 0.1%, while hot-rolled coil grew 0.2%, and coking coal advanced 0.4%. 

Copper: US-China trade uncertainties grew market caution, as departing long positions dragged the most-active SHFE September contract to close at lows of 46,720 yuan/mt, down 1.06% on the day. Open interests lost 1,472 lots to 230,000 lots, while open interests in the October contract climbed 23,000 lots to 173,000 lots with surging shorts. This caused an influx of 316 million yuan of capital into all SHFE copper contracts today. With pressure from the five-day moving average and shortening MACD indicators, the September contract may track its LME counterpart and test support from the 46,700 yuan/mt level tonight. 

Zinc: The most-liquid SHFE September contract found support from the 10-day moving average and rebounded to around 19,500 yuan/mt at noon, but limited upward momentum again drove it to a low of 19,370 yuan/mt, before it lost 1.17% on the day to close at 19,385 yuan/mt. Open interests decreased 18,832 lots to 235,000 lots while open interests across October and November contracts expanded a combined 12,800 lots. Tonight, support from the Bollinger middle band for the September contract should be monitored. 

Nickel: The most-liquid SHFE October contract lost nearly all the gains from trades before noon as longs booked profits and left in the afternoon, lowering the contract to the 112,000 yuan/mt level before it ended at 112,260 yuan/mt, up 0.32% on the day. It remained above the five-day moving average, and may hover between the five- and 10- day moving averages tonight. 

Lead: An underperformed LME lead prompted longs to exit, which weighed on the most-traded SHFE September contract to 16,560 yuan/mt around noon after it opened at 16,610 yuan/mt. Weakening base metals in the afternoon extended declines in the contract, which fell 1.29% on the day to finish at 16,505 yuan/mt. As the five-day moving average moved downwards and LME lead remained weak, the contract may continue to trend downwards tonight, but support will linger at 16,300 yuan/mt. 

Tin:  As investors cut their shorts and loaded-up longs, the most-liquid SHFE September contract rebounded after hovered at lows around 133,530 yuan/mt in early trades. It finished the trading day at 133,840 yuan/mt, down 0.42% on the day. We see it extending the rangebound trend with support from 133,500 yuan/mt and resistance from 135,600 yuan/mt tonight. 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Ghana draft bill proposes state special share and shorter mining leases
Oct 02, 2026 15:49 (GMT+8)
Ghana draft bill proposes state special share and shorter mining leases
Read More
Ghana draft bill proposes state special share and shorter mining leases
Ghana draft bill proposes state special share and shorter mining leases
[SMM Gold Flash] A draft mining bill reviewed by Reuters on 30 September would let Ghana’s mines minister require companies to issue the state a free special share with consent rights over major transactions. It would retain the existing 10% free-carried state interest and limit mining leases to 15 years or the projected mine life, whichever is shorter. The draft would also allow future rules requiring local processing and restricting exports of unprocessed concentrates. None of these proposals has been enacted; Reuters did not establish when the draft was prepared. For Ghana’s gold miners, the proposed rights and shorter leases could affect financing, valuations and renewal decisions. Under the draft, existing rights holders seeking renewal would receive priority consideration for equivalent licences. Mining companies expect further consultation before parliamentary debate, Reuters reported. The final wording and timing remain uncertain.
Oct 02, 2026 15:49 (GMT+8)
PGMs: Independent tests advance platinum and palladium battery technology
Oct 02, 2026 15:48 (GMT+8)
PGMs: Independent tests advance platinum and palladium battery technology
Read More
PGMs: Independent tests advance platinum and palladium battery technology
PGMs: Independent tests advance platinum and palladium battery technology
[SMM PGM Flash] Platinum Group Metals said on 1 October that independent testing by the Battery Innovation Center had validated its Lion Battery subsidiary’s platinum- and palladium-based electrodes in prototype lithium-sulphur cells. Compared with cells without the catalysts, the prototypes showed better capacity and rate capability, with palladium-rich formulations performing best overall. Platinum Group and Valterra Platinum, which own Lion 52% and 48% respectively, have approved funding for the next phase. The result offers a possible new use for PGMs beyond vehicle exhaust catalysts, but remains a prototype milestone. Lion plans to make and test pouch cells, refine the catalysts and assess applications including drones. Commercial performance and demand for significant PGM volumes have yet to be established. The work is relevant to Southern African suppliers: Valterra produces PGMs in South Africa and Zimbabwe, while Platinum Group is developing South Africa’s Waterberg project.
Oct 02, 2026 15:48 (GMT+8)
Sibanye reaches East Boulder wage agreement; separate US strike continues
Oct 01, 2026 16:45 (GMT+8)
Sibanye reaches East Boulder wage agreement; separate US strike continues
Read More
Sibanye reaches East Boulder wage agreement; separate US strike continues
Sibanye reaches East Boulder wage agreement; separate US strike continues
[SMM PGM Flash] Sibanye-Stillwater announced on 30 September that workers at its East Boulder platinum and palladium mine in Montana had ratified a collective agreement with the United Steelworkers. The deal runs retroactively from 1 August 2026 to 31 July 2029, with a 4.5% wage increase in year one, the greater of 3.5% or CPI in year two and the greater of 3.0% or CPI in year three. Strike action at the separate Stillwater East mine and Columbus metallurgical facility continues, the company said. The East Boulder settlement fixes part of the labour-cost path for Sibanye’s US PGM business and supports its planned shift towards more mechanised mining and team-based incentives. It does not resolve the other strike or demonstrate a recovery in output; the company disclosed no revised production guidance in this release.
Oct 01, 2026 16:45 (GMT+8)