July 25 Tianjin zinc spot news: the continuation of market activity is mainly due to the poor willingness to receive goods downstream

Published: Jul 25, 2019 11:38 (GMT+8)
SMM7, March 25, Tianjin market 0 # zinc ingots mainstream transactions in 1910 to 20190 yuan / ton, 0 # ordinary brand mainstream transactions in 1910 to 1980 yuan / ton, 1908 contract rising water 30 to 80 yuan / ton, Tianjin market than Shanghai stock market to maintain 20 yuan / discount 20 yuan / ton. The main stream of 0 # zinc ingots in Tianjin market, Tianjin market and Shanghai stock market.

SMM7, March 25, Tianjin market 0 # zinc ingots mainstream transactions in 1910 to 20190 yuan / ton, 0 # ordinary brand mainstream transactions in 1910 to 1980 yuan / ton, 1908 contract rising water 30 to 80 yuan / ton, Tianjin market than Shanghai stock market to maintain 20 yuan / discount 20 yuan / ton. The main stream of 0 # zinc ingots in Tianjin market, Tianjin market and Shanghai stock market. The delivery of the refinery is normal, the market supply is abundant, and the early quotation of the holder is concentrated around 50 to 100 yuan / ton for the 08 contract. However, under the condition that there is no obvious change in the disk price compared with yesterday, the willingness to receive the goods downstream is still not strong. Some of the subsequent holders are the first to lower the water supply by 20 yuan / ton, and the market quotation is concentrated on about 30 to 80 yuan / ton for the 08 contract, and the market continues to have a price of about 80 yuan / ton in the early stage. Downstream willingness to pick up goods again poor, the decline in market activity is more significant, the overall transaction situation is still not improved yesterday, continued to be insipid. 0 # Zijin, Hongye, lark, Chi Hong, etc., were sold in 1910-1980 yuan / ton, and 1 # Zijin, Chihong, Hongye, etc., were sold in 1960-1930 yuan / ton. (SMM Yan Weijun QQ: 2880505634 TEL:021-51666869)

"Click to view SMM historical price data

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Oct 02, 2026 14:34 (GMT+8)
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Read More
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Coherent launched PhotonLink, an integrated optics platform for AI infrastructure incorporating Indium Phosphide (InP) lasers, silicon photonics, detectors and optical modules. The company disclosed more than 10 CPO engagements, over 10 NPO engagements and more than five chip-to-chip connectivity projects, with anchor customers and long-term agreements secured for both CPO and NPO. Revenue is expected to begin ramping in Q4 2026. Coherent has shipped over 300 million InP lasers and is expanding its 6-inch InP manufacturing capacity to support the ramp. The customer pipeline provides a clearer commercial demand signal for InP devices and upstream materials, although additional capacity and indium consumption were not disclosed.
Oct 02, 2026 14:34 (GMT+8)
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Oct 02, 2026 10:40 (GMT+8)
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Read More
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Minerals announced that JDS Energy & Mining had completed a preliminary underground inspection at its wholly owned Talisman project in Washington State. No immediate impediment to safe re-entry was identified, and mineralization including sphalerite was observed near the portal and adit. More than 200 soil samples await results. Significant underground work still requires detailed geotechnical assessment, support design and stope inspection. Mineral observations do not establish grade, continuity, tonnage or economic potential.
Oct 02, 2026 10:40 (GMT+8)
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Oct 02, 2026 10:39 (GMT+8)
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Read More
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Windfall Geotek announced renewal of 592 hectares of claims in Canada’s Bathurst Mining Camp. Zinc targets at Upper Sprig Brook were generated using an AI model trained on zinc-copper assays from seven local volcanogenic massive sulphide deposits. The company plans historical-data compilation and rock or soil sampling to advance target validation and subsequent drill targeting. No new drilling assays or mineral resource estimate were announced.
Oct 02, 2026 10:39 (GMT+8)