Today's news: us manufacturing PMI hit its lowest level since 2009 in July * net profit of Luoping Zinc Power Company turned into profit in the first half of the year compared with the same period last year.

Published: Jul 25, 2019 09:23

Macro information

Alan Greenspan supports the Federal Reserve in implementing a preventive interest rate cut

New British Prime Minister Johnson promises to leave the European Union by October 31

Us manufacturing PMI hit its lowest level since 2009 in July

Samnouchin's approach suggests that the "strong dollar policy" is a thing of the past

The National Development and Reform Commission makes efforts to stabilize investment from both ends of financing investment

Metal news

[SMM point of view] after eight days of rising, the Shanghai nickel market rose and or fell after three days of rally.?

[SMM Analysis] High level Rensi inventory & Shanghai Tin inventory continuous decline SMM exclusive interpretation period of current Tin Market

[SMM analysis] Iron ore intraday slump of 4 per cent negative factors gradually accumulated

[SMM Analysis] New Wheel Steel Plant bidding to Open Electrolytic Manganese Market with strong wait-and-see mood

Freeport McMullen's net loss in the second quarter due to reduced copper production

Norway Hydro CFO: slowing German car and Construction demand is a drag on Aluminum demand

[mining company semi-annual report] Vale: Q2 nickel production decreased by 17.9% and sales increased by 14.3%.

Luoping Zinc Power Company: net profit in the first half of the year turns from loss to profit from the same period last year

Related news

The BDI index returns to 2000 points and the dry bulk freight industry is expected to usher in the dawn.

Change your face! New face variables still exist in the top 10 reappearance of power batteries in the first half of the year

Accelerated battery layout in Europe

New housing transactions in Beijing pick up pressure in the second half of the year may be less than last year

Scan QR code and apply to join SMM metal exchange group, please indicate company + name + main business

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Analysis] The "Counter-Cyclical" Logic of Copper Smelting: When Sulfuric Acid Becomes the Main Product
11 hours ago
[SMM Analysis] The "Counter-Cyclical" Logic of Copper Smelting: When Sulfuric Acid Becomes the Main Product
Read More
[SMM Analysis] The "Counter-Cyclical" Logic of Copper Smelting: When Sulfuric Acid Becomes the Main Product
[SMM Analysis] The "Counter-Cyclical" Logic of Copper Smelting: When Sulfuric Acid Becomes the Main Product
[SMM Analysis: The "Counter-Cyclical" Logic of Copper Smelting: When Sulfuric Acid Becomes the Main Product]
11 hours ago
BC Copper 2604 Closed Lower with a Wide Trading Range, Pressured by Both Geopolitics and Interest Rate Cut Expectations [SMM BC Copper Commentary]
12 hours ago
BC Copper 2604 Closed Lower with a Wide Trading Range, Pressured by Both Geopolitics and Interest Rate Cut Expectations [SMM BC Copper Commentary]
Read More
BC Copper 2604 Closed Lower with a Wide Trading Range, Pressured by Both Geopolitics and Interest Rate Cut Expectations [SMM BC Copper Commentary]
BC Copper 2604 Closed Lower with a Wide Trading Range, Pressured by Both Geopolitics and Interest Rate Cut Expectations [SMM BC Copper Commentary]
12 hours ago
Inner Mongolia Approves 500 kV Project, Boosting Ordos City's Power Grid in 14th Five-Year Plan
12 hours ago
Inner Mongolia Approves 500 kV Project, Boosting Ordos City's Power Grid in 14th Five-Year Plan
Read More
Inner Mongolia Approves 500 kV Project, Boosting Ordos City's Power Grid in 14th Five-Year Plan
Inner Mongolia Approves 500 kV Project, Boosting Ordos City's Power Grid in 14th Five-Year Plan
Recently, the 500 kV transmission and transformation project of Jiri (Kusha II) was officially approved by the Energy Bureau of Inner Mongolia Autonomous Region, marking a good start for the power grid construction of Ordos City in the first year of the 14th Five-Year Plan. The project is located in the territory of Hangjin Banner, with a total investment of 1.52554 billion yuan. It is a key hub project to ensure the output and consumption of new energy power in the northwestern region of Hangjin Banner. The project plans to build one 500 kV substation and about 194 km of 500 k V lines, which will pass through Hangjin Banner and Dalad Banner.
12 hours ago
Today's news: us manufacturing PMI hit its lowest level since 2009 in July * net profit of Luoping Zinc Power Company turned into profit in the first half of the year compared with the same period last year. - Shanghai Metals Market (SMM)