SMM Morning Comments (Jul 17)

Published: Jul 17, 2019 09:42 (GMT+8)
SMM Morning Comments

SHANGHAI, Jul 17 (SMM) – 

Copper: Three-month LME copper failed to stand firm above the $6,000/mt level last night and the most–traded SHFE September contract also retreated from a high of 47,280 yuan/mt, to below 47,000 yuan/mt, after the US dollar rose on higher-than-expected US retail sales data. Oil prices slid as production in the Gulf of Mexico restarted after a tropical storm, and this also depressed copper prices. With pressure from the 60-day moving average and bearish signs from the KDJ indicators, the SHFE contract is expected to trade between 46,700-47,000 yuan/mt, with its LME counterpart at $5,940-5,980/mt today. Spot premiums are seen firm at 10-90 yuan/mt with downstream consumers purchasing on lower futures prices.

Aluminium: Three-month LME aluminium came off after climbed to a high of $1,856.5/mt, settling higher on the day at $1,844/mt. The most-liquid SHFE September contract also pared some gains as it eased from a high of 13,930 yuan/mt, before closed higher for the third consecutive trading day at 13,905 yuan/mt. Today, it is expected to trade between 13,800-13,950 yuan/mt, with LME aluminium at $1,800-1,860/mt. 

Zinc: Three-month LME zinc shrugged off pressure from the 40-day moving average to a high of $2,488.5/mt, before ending 1.02% higher at $2,466/mt. Improved sentiment on upbeat US economic data and slower-than-expected accumulation in overseas zinc inventories buoyed prices. The most-traded SHFE September contract gained for the third straight trading day as it rose to a high of 19,550 yuan/mt and finished 1.09% higher at 19,460 yuan/mt. Strong upward momentum is expected to keep it at 19,250-19,750 yuan/mt today, with LME zinc at $2,450-2,500/mt today. 

Nickel: Three-month LME nickel extended its robust trend and climbed to the highest since August 2018 at $14,200/mt, ending 2.01% higher at $13,940/mt. The SHFE September contract continued to consolidate above the Bollinger upper band and advanced to a high of 111,460 yuan/mt as longs loaded up their positions. The most-active SHFE nickel contract moved to the October contract overnight, which is expected to trade around the 110,000 yuan/mt level with LME nickel also at highs today. 

Lead: Three-month LME lead gained for the seventh consecutive trading day but with a slower pace as pressure above prevented it from exceeding $1,995/mt and settled it at $1,980.5/mt, up 0.03% on the day, The most-liquid SHFE September contract retreated after rose, and finished 0.77% higher at 16,300 yuan/mt. Shorts are expected to pile on pressure if the contract fails to hold firm at highs today. 

Tin: Three-month LME tin eased losses as it rebounded from a low of $17,850 yuan/mt and settled higher on the day at $17,915/mt. The most-liquid SHFE September contract traded lower overnight with investors covering their longs and adding shorts. The contract lost 0.1% to close at 133,500 yuan/mt, and may test support from 132,000 yuan/mt today. LME tin is expected to face resistance from $18,200/mt, with support from $17,500/mt today.  

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Ghana draft bill proposes state special share and shorter mining leases
10 hours ago
Ghana draft bill proposes state special share and shorter mining leases
Read More
Ghana draft bill proposes state special share and shorter mining leases
Ghana draft bill proposes state special share and shorter mining leases
[SMM Gold Flash] A draft mining bill reviewed by Reuters on 30 September would let Ghana’s mines minister require companies to issue the state a free special share with consent rights over major transactions. It would retain the existing 10% free-carried state interest and limit mining leases to 15 years or the projected mine life, whichever is shorter. The draft would also allow future rules requiring local processing and restricting exports of unprocessed concentrates. None of these proposals has been enacted; Reuters did not establish when the draft was prepared. For Ghana’s gold miners, the proposed rights and shorter leases could affect financing, valuations and renewal decisions. Under the draft, existing rights holders seeking renewal would receive priority consideration for equivalent licences. Mining companies expect further consultation before parliamentary debate, Reuters reported. The final wording and timing remain uncertain.
10 hours ago
PGMs: Independent tests advance platinum and palladium battery technology
10 hours ago
PGMs: Independent tests advance platinum and palladium battery technology
Read More
PGMs: Independent tests advance platinum and palladium battery technology
PGMs: Independent tests advance platinum and palladium battery technology
[SMM PGM Flash] Platinum Group Metals said on 1 October that independent testing by the Battery Innovation Center had validated its Lion Battery subsidiary’s platinum- and palladium-based electrodes in prototype lithium-sulphur cells. Compared with cells without the catalysts, the prototypes showed better capacity and rate capability, with palladium-rich formulations performing best overall. Platinum Group and Valterra Platinum, which own Lion 52% and 48% respectively, have approved funding for the next phase. The result offers a possible new use for PGMs beyond vehicle exhaust catalysts, but remains a prototype milestone. Lion plans to make and test pouch cells, refine the catalysts and assess applications including drones. Commercial performance and demand for significant PGM volumes have yet to be established. The work is relevant to Southern African suppliers: Valterra produces PGMs in South Africa and Zimbabwe, while Platinum Group is developing South Africa’s Waterberg project.
10 hours ago
Sibanye reaches East Boulder wage agreement; separate US strike continues
Oct 01, 2026 16:45 (GMT+8)
Sibanye reaches East Boulder wage agreement; separate US strike continues
Read More
Sibanye reaches East Boulder wage agreement; separate US strike continues
Sibanye reaches East Boulder wage agreement; separate US strike continues
[SMM PGM Flash] Sibanye-Stillwater announced on 30 September that workers at its East Boulder platinum and palladium mine in Montana had ratified a collective agreement with the United Steelworkers. The deal runs retroactively from 1 August 2026 to 31 July 2029, with a 4.5% wage increase in year one, the greater of 3.5% or CPI in year two and the greater of 3.0% or CPI in year three. Strike action at the separate Stillwater East mine and Columbus metallurgical facility continues, the company said. The East Boulder settlement fixes part of the labour-cost path for Sibanye’s US PGM business and supports its planned shift towards more mechanised mining and team-based incentives. It does not resolve the other strike or demonstrate a recovery in output; the company disclosed no revised production guidance in this release.
Oct 01, 2026 16:45 (GMT+8)