[SMM Black Futures Daily Review] 20190 709: the gap between supply and demand is still there, and the iron ore far-month contract once rose by the limit.

Published: Jul 9, 2019 17:36

In terms of volume and price, RB1910 rose 50 yuan / ton to close at 4042 yuan / ton; HC1910 closed up 39 yuan / ton to close at 3910 yuan / ton; I1909 closed up 19.5 yuan / ton from the previous trading day to close at 880.5 yuan / ton; J1909 closed down 3.5 yuan / ton from the previous trading day to close at 2119 yuan / ton. In terms of position data, RB1910 handled 3.66 million transactions, an increase of 23500 to 2.42 million; I1909, 2.95 million, with a decrease of 56000 to 1.43 million; in terms of capital flows, the net inflow of RB1910 funds today was 172 million yuan; and the net outflow of I1909 funds was 163 million yuan. Viewpoint: shock operation. Today, iron ore continued yesterday's strong pattern, long month contract trading once rose, yesterday, S & P said that due to the impact of Vale dam break, at least until the end of 2021 iron ore prices will maintain a rise, boost market sentiment, at the same time, Rio Tinto cancelled the supply of some Changxie mines in July, resulting in the market resources to maintain a tight pattern; On the whole, the current situation of high base difference and low inventory of iron ore has not changed, and the price is expected to remain high; mature materials are affected by environmental protection and production restrictions, and there is little problem on the supply side. After the emergence of plum in East China, the demand is expected to be released quickly, the overall balance of supply and demand is more balanced, and the short-term is still a wide concussion pattern. After building the rising relay platform, the probability of continuing to go up is greater. Coke as a result of futures spot more, providing a risk-free arbitrage opportunity, so the futures price correction is not surprising, but after three rounds of reduction, the spot probability will start to raise the price, the price falling space is limited, the late probability of starting the current resonance rise, patiently waiting to do long opportunities. Strategy: RB1910 contract range (3930, 4200); I1909 contract range (820920), middle line multiple single hold, short-term high throw low suction. Disclaimer: this information comes from a statistical arbitrage model based on historical data, and all conclusions are based on reliable and publicly available information. The SMM quantification team is not responsible for any losses that may be caused by all information. We recommend that investors independently evaluate specific investments and strategies. Investors are also encouraged to seek advice from professional financial advisers. This information does not provide a tailored investment strategy.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Supply Gap Persists in Vietnamese Market, Spot Lead Traded at High Premiums
Jun 5, 2026 11:08
Supply Gap Persists in Vietnamese Market, Spot Lead Traded at High Premiums
Read More
Supply Gap Persists in Vietnamese Market, Spot Lead Traded at High Premiums
Supply Gap Persists in Vietnamese Market, Spot Lead Traded at High Premiums
[Ex-China Lead Market Dynamics] It was learned that the recent environmental protection inspections on secondary lead in the Vietnamese market had temporarily come to an end, and some lead smelters had gradually resumed production. However, in the face of the current primary lead supply gap, spot lead in the local market continued to maintain high premiums. According to the latest information, the CIF premium for Vietnamese lead ingots with Pb≥99.99% in June had reached $180/mt as a common transaction price, compared to around $165/mt in May.
Jun 5, 2026 11:08
Nanyang Zhongjie Receives Approval for Waste Lead-Acid Battery Collection Project
May 27, 2026 14:15
Nanyang Zhongjie Receives Approval for Waste Lead-Acid Battery Collection Project
Read More
Nanyang Zhongjie Receives Approval for Waste Lead-Acid Battery Collection Project
Nanyang Zhongjie Receives Approval for Waste Lead-Acid Battery Collection Project
[Waste Lead-Acid Battery Collection Enterprise Updates] Recently, the Xinye Branch of the Nanyang Municipal Ecology and Environment Bureau in Henan Province officially approved the Environmental Impact Assessment Report for the waste lead-acid battery collection, storage, and transfer project of Nanyang Zhongjie Environmental Protection Technology Co., Ltd. (Wan Xin Huan Shen [2026] No. 8). The project will construct a comprehensive workshop integrating weighing, loading and unloading, and storage, with designated areas for intact batteries, dedicated storage rooms for damaged batteries, and temporary hazardous waste storage rooms, with a designed annual collection and transfer capacity of 5,000 mt of waste lead-acid batteries.
May 27, 2026 14:15
Dongying Xinsanyuan's 200,000 mt Lead-Acid Battery Recycling Project on Track for 2026 Completion
May 19, 2026 17:28
Dongying Xinsanyuan's 200,000 mt Lead-Acid Battery Recycling Project on Track for 2026 Completion
Read More
Dongying Xinsanyuan's 200,000 mt Lead-Acid Battery Recycling Project on Track for 2026 Completion
Dongying Xinsanyuan's 200,000 mt Lead-Acid Battery Recycling Project on Track for 2026 Completion
[Secondary Lead Enterprise Updates] It was reported that the 200,000 mt lead-acid battery environmental protection utilization project of Dongying Xinsanyuan Environmental Protection Technology Co., Ltd. was under orderly construction and progressing on schedule, and was expected to be completed and put into operation before the end of 2026. As a key project in Dongying City, Shandong Province, the project had a total investment of 480 million yuan, covering an area of 103 mu. Once completed, it will fill the regional gap in the harmless treatment and resource utilization of waste lead-acid batteries, injecting new momentum into regional green circular development.
May 19, 2026 17:28