July 2 Tianjin Zinc spot News: spot rising Water slips Tianjin Market transaction weakens

Published: Jul 02, 2019 11:35 (GMT+8)
SMM7 news on the 2nd, Tianjin market 0 # zinc ingot mainstream transaction in 19860 to 21070 yuan / ton, 0 # ordinary brand mainstream transaction in 19860 to 19960 yuan / ton, 1907 contract rising water 50 to 110 yuan / ton, Tianjin market than Shanghai market yesterday rising water 90 yuan / ton narrowed to 80 yuan / ton.

SMM7 news on the 2nd, Tianjin market 0 # zinc ingot mainstream transaction in 19860 to 21070 yuan / ton, 0 # ordinary brand mainstream transaction in 19860 to 19960 yuan / ton, 1907 contract rising water 50 to 110 yuan / ton, Tianjin market than Shanghai market yesterday rising water 90 yuan / ton narrowed to 80 yuan / ton. The refinery shipment is normal, the market supply circulation is more abundant. The market fell, the holder's willingness to raise prices in the morning was stronger, and the price was concentrated in the vicinity of the 07 contract rising water of 90 to 150 yuan / ton, but the downstream bearish mood was stronger and the willingness to receive the goods was not good. In the follow-up period, some of the holders lowered the rising water to 50 to 110 yuan / ton, and the market transaction was still not obviously boosted. The willingness to receive goods downstream was weakened again. The transaction was mainly based on the high-priced brand Zijin source, and the transaction volume of ordinary brand source was more limited. Today downstream bearish mood is thicker, superimposed consumption weakens again, Tianjin market transaction situation is not as good as yesterday. 0 # Zijin, Hongye, Bailing, Chihong, Xiyan, etc., were sold in 19860-19960 yuan / ton, and 1 # Zijin, Chihong, Hongye, etc., were sold in 19810-19910 yuan / ton. (SMM Yan Weijun QQ: 2880505634 TEL:021-51666869)

"Click to view SMM historical price data

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Oct 02, 2026 14:34 (GMT+8)
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Read More
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Coherent launched PhotonLink, an integrated optics platform for AI infrastructure incorporating Indium Phosphide (InP) lasers, silicon photonics, detectors and optical modules. The company disclosed more than 10 CPO engagements, over 10 NPO engagements and more than five chip-to-chip connectivity projects, with anchor customers and long-term agreements secured for both CPO and NPO. Revenue is expected to begin ramping in Q4 2026. Coherent has shipped over 300 million InP lasers and is expanding its 6-inch InP manufacturing capacity to support the ramp. The customer pipeline provides a clearer commercial demand signal for InP devices and upstream materials, although additional capacity and indium consumption were not disclosed.
Oct 02, 2026 14:34 (GMT+8)
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Oct 02, 2026 10:40 (GMT+8)
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Read More
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Minerals announced that JDS Energy & Mining had completed a preliminary underground inspection at its wholly owned Talisman project in Washington State. No immediate impediment to safe re-entry was identified, and mineralization including sphalerite was observed near the portal and adit. More than 200 soil samples await results. Significant underground work still requires detailed geotechnical assessment, support design and stope inspection. Mineral observations do not establish grade, continuity, tonnage or economic potential.
Oct 02, 2026 10:40 (GMT+8)
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Oct 02, 2026 10:39 (GMT+8)
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Read More
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Windfall Geotek announced renewal of 592 hectares of claims in Canada’s Bathurst Mining Camp. Zinc targets at Upper Sprig Brook were generated using an AI model trained on zinc-copper assays from seven local volcanogenic massive sulphide deposits. The company plans historical-data compilation and rock or soil sampling to advance target validation and subsequent drill targeting. No new drilling assays or mineral resource estimate were announced.
Oct 02, 2026 10:39 (GMT+8)