SMM Morning Comments (Jun 21)

Published: Jun 21, 2019 09:27 (GMT+8)
SMM Morning Comments

SHANGHAI, Jun 21 (SMM) –

Copper: As shorts built up positions, three-month LME copper came off from one-month high of $6,027/mt to close 1.31% higher at $5,972/mt on Thursday. The most traded SHFE August contract also pulled back overnight, erasing earlier gains to close marginally lower at 46,820 yuan/mt. While the market appeared to have digested the Fed’s interest rate cut hint, stronger crude oil prices, driven by US-Iran tensions, will lend support to copper. LME copper is expected to trade between $5,930-6,000/mt today, with SHFE copper at 46,500-47,000 yuan/mt. Spot premiums are seen firm at 20-80 yuan/mt as sellers and downstream buyers remain locked in a stalemate.

Aluminum: Three-month LME aluminium pulled back from an earlier high of $1,807.5/mt to finish the trading day 0.17% higher at $1,782/mt on Thursday. This reflected strong resistance from the $1,800/mt level. LME aluminium is expected to trade between $1,760-1,820/mt today. As shorts added and longs cut their positions, the most active SHFE August contract slipped overnight, losing 0.36% to end at 13,835 yuan/mt. It is expected to trade between 13,700-14,000 yuan/mt today, with spot premiums of up to 20 yuan/mt over the July contract.

Zinc: Resistance from the $2,500/mt line forced three-month LME zinc to give up earlier gains to close a tad higher at $2,465.5/mt on Thursday. Despite support from the expectations of lower US interest rates, the anticipation of greater supplies continued to weigh on LME zinc. Weaker cash premiums also eroded steam in LME zinc, which is expected to trade between $2,450-2,500/mt today, with strength at lows under scrutiny. As shorts aggressively loaded up their positions, the most liquid SHFE August contract fell 0.81% to end at 19,675 yuan/mt overnight. Spreads between SHFE zinc contracts narrowed after the delivery. Pessimistic consumption outlook and growing supplies drove the expectations for higher inventories, which kept SHFE zinc under pressure. The contract is expected to trade weakly at 19,550-20,050 yuan/mt today.

Nickel: Three-month LME nickel climbed to a high of $12,390/mt on Thursday before it pared some gains to close the trading day 1.69% higher at $12,325/mt. LME nickel inventories shrank 1,002 mt to 16,936 mt. The most traded SHFE August contract reversed earlier gains to close 0.31% lower at 99,450 yuan/mt overnight. LME nickel is expected to trade between $12,100-12,450/mt today, with its SHFE counterpart at 99,000-101,000 yuan/mt. Spot prices are seen at 99,500-101,000 yuan/mt.

Lead: Three-month LME lead shed earlier gains to close 0.13% higher at $1,904.5/mt on Thursday, and its moving averages have been lifted by recent gains. The movement in the US dollar and potential actions from institutional investors after sharply increased cancelled warrants would be key to LME lead. The most active SHFE August contract slid 0.31% to close at 16,070 yuan/mt overnight. The two-day drop has put SHFE lead on track for a weekly decline.  

Tin: A sharp fall in the greenback and an advance in oil prices bolstered three-month LME tin to a high of $19,325/mt on Thursday, before the contract pared some gains to finish the trading day 0.68% higher at $19,125/mt. Support is seen at $18,800/mt, while resistance is from the 40-day moving average as high as $19,400/mt. The most traded SHFE September contract opened higher overnight, and gained 0.38% to end at 144,490 yuan/mt. Support is seen at 143,500 yuan/mt, while resistance is at 145,000 yuan/mt.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
Oct 02, 2026 16:31 (GMT+8)
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
Read More
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 have broken ground on a fourth grinding line at the Sierra Gorda copper-molybdenum mine in Chile's Atacama region. The US$725 million expansion runs for three years from January 2027, with completion by late 2029 and full output in H2 2030. Ore processing capacity rises 26%, from 131,000 tonnes per day to 165,000 tpd. Annual copper output is projected to climb from 165,000 tonnes in 2025 to 195,000 tonnes, with 6,000 tonnes of molybdenum, 58,000 ounces of gold and 1.7 million ounces of silver as by-products. The project creates over 900 direct jobs and is funded from operating cash flow and debt. Unit operating costs are expected to fall about 10%.
Oct 02, 2026 16:31 (GMT+8)
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Oct 02, 2026 15:31 (GMT+8)
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Read More
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Resources has provided an update on the Preliminary Feasibility Study (PFS) for its Iberian Belt West polymetallic project in Spain, saying the study is well advanced but remains under final technical review.​ The company said the review process has been expanded to include additional technical and quality-assurance oversight before publication. As a result, Emerita now expects the PFS to be released in the coming weeks rather than within the previously indicated timeframe.​ Iberian Belt West hosts copper, zinc, lead, gold and silver mineralization and is one of Emerita’s principal development-stage assets in Spain. The PFS is expected to provide updated detail on the proposed mine plan, processing configuration, capital requirements, operating costs and project economics.​ Emerita said the additional review work is intended to ensure consistency and completeness across the technical disciplines contributing to the study before it is finalized.​ The company did not announce a revised specific publication date, and no new production, capital or economic figures were disclosed in the latest update.​ The extended review delays the next major technical milestone for Iberian Belt West, but the company continues to indicate that the PFS is nearing completion. For the copper market, the significance of the study will depend on the production profile and project economics ultimately disclosed, particularly the contribution of copper relative to the project’s other payable metals. Attention will therefore remain on the timing of the PFS release and whether the final study materially changes the project’s development outlook.
Oct 02, 2026 15:31 (GMT+8)
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Oct 02, 2026 15:27 (GMT+8)
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Read More
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Minerals has reported additional drill results from its 2026 exploration programme at the Carmacks copper-gold project in Yukon, Canada, with new step-out drilling extending mineralization at Zone 2000S beyond the boundaries of the existing Mineral Resource.​ Drill hole CD-26-058 returned 75.55 metres grading 1.19% copper, 0.97 g/t gold, 10.4 g/t silver and 335 ppm molybdenum, equivalent to 2.18% copper-equivalent. The interval included 48.66 metres grading 1.61% copper, 1.39 g/t gold, 15.1 g/t silver and 475 ppm molybdenum, equivalent to 3.03% CuEq.​ Within the same hole, a higher-grade interval of 14.50 metres returned 2.30% copper, 2.68 g/t gold, 29.5 g/t silver and 1,015 ppm molybdenum, equivalent to 5.08% CuEq.​ A second hole, CD-26-059, intersected 93.99 metres grading 0.96% copper, 0.70 g/t gold, 4.6 g/t silver and 919 ppm molybdenum, equivalent to 1.94% CuEq. This included 63.97 metres at 1.26% copper, 0.96 g/t gold, 6.3 g/t silver and 1,049 ppm molybdenum, equivalent to 2.52% CuEq.​ Cascadia said the latest results continue to expand mineralization at Zone 2000S beyond the limits of the current Mineral Resource and highlight the higher-grade nature of the extension. The reported drill intervals represent drilled thicknesses, with true widths estimated at approximately 60–70%.​ The latest step-out results indicate that copper-gold mineralization at Zone 2000S extends beyond the boundaries of the current Carmacks Mineral Resource. The broad intervals and higher-grade internal zones could support future resource expansion if additional drilling confirms continuity. However, the new intersections have not yet been incorporated into an updated Mineral Resource Estimate, meaning their ultimate impact on project scale and mine planning remains to be determined.
Oct 02, 2026 15:27 (GMT+8)