SMM Evening Comments (Jun 18)

Published: Jun 18, 2019 17:30
SHFE nonferrous metals extended their declines for the most part

SHANGHAI, Jun 18 (SMM) – SHFE nonferrous metals extended their declines for the most part on Tuesday June 18 with nickel leading the losses and ending 1.06% lower. Tin fell 0.72%, zinc lost 0.18%, aluminium dropped 0.11%, while copper gained 0.37%, and lead rose 0.34%. 

The ferrous complex mostly rebounded as iron ore jumped 2.14%, rebar expanded 0.27%, coking coal advanced 0.22%, hot-rolled coil rose 0.19%, while coke slid 1.58%. 

Copper: The most-liquid SHFE August contract traded rangebound with pressure from the 10-day moving average, as the market awaited results of the US Federal Reserve's interest rate meeting. It rebounded from a low of 46,220 yuan/mt near closing, and ended the trading day 0.37% higher at 46,330 yuan/mt. As the MACD red line lengthened, technical support is expected to keep the contract testing the 46,330 yuan/mt level tonight. 

Aluminium: The most-traded SHFE August contract moved away from the five-day moving average as pressure from shorts lowered it below the daily moving average to an intraday low of 13,780 yuan/mt. It lost 0.11% on the day and finished at 13,810 yuan/mt, with open interests up 7,190 lots to 255,000 lots. Fundamentals may continue to keep the contract weak tonight. 

Zinc: The most-active SHFE August contact stemmed decline at around 19,880 yuan/mt and rebounded a little to close at 19,930 yuan/mt, down 0.18% on the day. Shorts exited near closing, but expanding inventories of refined zinc provided limited confidence in longs. This, together with technical pressure above, is likely to cap any upward momentum in the contract tonight. Support from the Bollinger lower band will remain tonight. 

Nickel: Support from the Bollinger middle band prevented the most-active SHFE August contract from falling below the 97,700 yuan/mt level, after it slid below the daily moving average in the afternoon session. It lost 1.06% on the day and closed at 98,180 yuan/mt, with open interests up 1,000 lots to 231,000 lots. We see it testing support from the 20-day moving average, or the 98,000 yuan/mt level tonight. 

Lead: The most-liquid SHFE July contract continued to trade between the 20- and 40-day moving averages, as shorts accumulated at highs and bolstered the contract to 16,140 yuan/mt at closing, up 0.34% on the day. Tonight, it is expected to extend the rangebound trend along with the 10-day moving average. 

Tin: A lower LME tin grew pessimism in the market, and extended the decline in the most-traded SHFE September contract from overnight. The contract fell 0.72% on the day and ended at 143,640 yuan/mt, with open interests expanding 444 lots to 41,514 lots as shorts entered. Tonight, it is expected to test support from 143,000 yuan/mt if it fails to receive the current support from 143,500 yuan/mt. Pressure above is seen from the 10- and 20-day moving averages, or the 144,500 yuan/mt level tonight. 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
16 hours ago
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
Read More
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
16 hours ago
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
19 hours ago
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
Read More
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
[SMM Flash] Greenland Mines has completed a 104.8-tonne bulk-sampling programme across seven sites at its Skaergaard palladium-platinum-gold project in East Greenland. The samples are being prepared for large-scale and pilot-scale metallurgical testwork at GTK Mintec in Finland, while the company continues engineering, processing, infrastructure and waste-management studies aimed at advancing the project's technical evaluation. Skaergaard's S-K 1300 resource currently comprises approximately 15.0 million oz PdEq Indicated and 17.49 million oz PdEq Inferred, according to Greenland Mines. The bulk-testing programme represents an important step in evaluating processing and recovery options for one of the larger undeveloped palladium-platinum-gold systems outside the major South African, Zimbabwean and Russian supply regions. However, the reported Mineral Resources are not Mineral Reserves and the latest programme does not constitute a development or commercial production decision.
19 hours ago
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
19 hours ago
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
Read More
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
[SMM Flash] Two Rivers, the South African PGM joint venture between African Rainbow Minerals and Impala Platinum, is advancing technical validation work for its Merensky project on the eastern limb of the Bushveld Complex. Early-works capital was approved during FY2026 to complete studies required to determine the project's way forward. The Merensky concentrator was commissioned during the six months to December 2024 but was subsequently placed on care and maintenance amid challenging PGM market conditions. The project has a stated capital cost of approximately R7.3 billion and is designed to produce around 182,000 6E PGM oz/year at steady state, alongside approximately 1,600 tonnes/year of nickel and 1,300 tonnes/year of copper. A restart could therefore provide meaningful incremental PGM supply from an existing South African operation. However, the project remains under technical validation and no restart date or final decision to resume production has been announced.
19 hours ago