[SMM Analysis] Huayu Integration Strategy reappearance and Zhiyuan contract to guarantee the supply of Palmeric Lithium Raw Materials

Published: Jun 17, 2019 17:28 (GMT+8)

SMM, June 17 / PRNewswire-Asianet /-

SMM believes that the signing of the contract is an important part of the integrated development strategy of Huayu cobalt industry. The cooperation between Zhiyuan Lithium and Tianjin Bamo is conducive to ensuring the supply of raw materials to Tianjin Bamo, giving it a significant advantage in bidding for battery and car factory orders.

In May 2019, Huayu Cobalt announced the acquisition of Tianjin Bamo for 3.2 billion. Tianjin Bamo is a traditional lithium cobalt leading production plant, in the past two years in the production of ternary materials gradually. Palmer has a capacity of 12000 tons of lithium cobalt acid and a gradual expansion of ternary material capacity, which is expected to reach 63000 tons by the end of this year.

Sichuan Zhiyuan lithium industry has a capacity of 33000 tons, including 18000 tons of lithium carbonate and 15000 tons of lithium hydroxide. The current raw material uses Australian spodumene concentrate.

It is worth noting that Shengtun lithium holds a 75 per cent stake in Oino mining. The evaluation report of mining right of Oyilonggou spodumene mine shows that Yilonggou spodumene mine has 6.54 million tons of ore resources and 84500 tons of lithium oxide (1.29% of lithium oxide grade, equivalent to 208300 tons of LCE), spodumene mining scale of 405000 tons / year, mine service life of 14 years, total fixed assets investment of 530 million yuan (230 million yuan has been completed). According to the "Evaluation report on the transfer of Mining Rights of Yelonggou Lithium Polymetallic Mine in Jinchuan County, Sichuan Province", the total cost of opencast mining in Yilonggou Lithium Mine is 301.53 yuan / ton, equivalent to US $257.8 / ton of lithium concentrate (recovery rate is 80%, exchange rate is 6.8yuan / US $, the same below); the total cost of underground mining is 358.43 yuan / ton, equivalent to US $306.45 / ton of 6 per cent lithium concentrate. The mine and the company lithium salt processing plant are located in Sichuan Province, the distance is closer, the freight is lower. The Oino Yilonggou spodumene mine is expected to go into production by November 2019.

Considering that Zhiyuan Lithium had previously signed a three-year cooperation framework agreement with Arbor subsidiary Lockwood, it contracted to manufacture no less than 6875 tons, 10, 000 tons and 10, 000 tons of Arbor in 2018, 2019 and 2020. at the same time, the processing capacity in the 1920s and 1920s could reach 15000 tons in accordance with Lockwood's requirements. SMM expects that the start-up rate of the long-distance lithium industry will be guaranteed after the commissioning of the new production capacity.

Huayu cobalt industry chooses Zhiyuan lithium industry strategic partner, for Palmer, the stability of its nickel cobalt lithium raw material supply is guaranteed, more importantly, the raw material of Zhiyuan lithium industry comes from Chinese lithium mine, the raw material cost has the great advantage compared with the imported ore, the excellent cost space, in the future industry competition gradually intensifies, the industry reshuffle gradually advances in the storm, will build a broad moat for Huayu.

On June 17, 2019, SMM estimated spot prices of lithium carbonate (industrial grade), lithium carbonate (battery grade), lithium hydroxide (battery grade coarse particles), lithium carbonate (industrial grade), lithium carbonate (battery grade), lithium hydroxide (battery grade coarse particles), lithium carbonate (industrial grade), lithium carbonate (battery grade) and lithium hydroxide (battery grade coarse particles).

SMM Cobalt Lithium Research team

Hu Yan 021 51666809

Hong Lu 021 51666814

Ning Ziwei 021 51666780

Qin Jingjing 021 51666828

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM News] Solis starts lithium drilling at Campo Grande
Sep 25, 2026 15:16 (GMT+8)
[SMM News] Solis starts lithium drilling at Campo Grande
Read More
[SMM News] Solis starts lithium drilling at Campo Grande
[SMM News] Solis starts lithium drilling at Campo Grande
Solis Minerals has started diamond drilling at its Campo Grande Lithium Project in Brazil's Araçuaí-Salinas Lithium Valley. The company plans five holes totalling about 1,000 m, with planned depths of up to 200 m, to test lithium pegmatites across a 500 m corridor. The targets rest on coincident multi-element geochemical anomalies at surface and on historical auger drilling results. Historical work by Rio Tinto and later mapping and geochemical work by Solis defined the targets. Solis has also mapped a new pegmatite swarm of three coherent outcrop zones between planned holes DHCG-001 and DHCG-004. The program will test the continuity, geometry and lithium potential of the pegmatites beneath surface, starting where mapped pegmatites coincide with geochemical anomalies. Solis says Campo Grande's geology and geochemistry are comparable to PLS Group's Colina Lithium Project, about 100 km to the southwest. Separately, Solis has completed seven drill holes at its Mandacaru Lithium Project in Brazil, with assay results pending.
Sep 25, 2026 15:16 (GMT+8)
[SMM News] Charger re-commences drilling at Medcalf lithium deposit
Sep 25, 2026 15:15 (GMT+8)
[SMM News] Charger re-commences drilling at Medcalf lithium deposit
Read More
[SMM News] Charger re-commences drilling at Medcalf lithium deposit
[SMM News] Charger re-commences drilling at Medcalf lithium deposit
Charger Metals has mobilized a second drill rig to its Lake Johnston Lithium Project in Western Australia as part of a 10,000 m program targeting resource growth. Diamond and reverse circulation rigs are now operating at the Medcalf lithium deposit, and RC drilling began just over a week ago. The program will double the meters drilled at Medcalf. The drilling targets extensions and infill at the Medcalf inferred mineral resource estimate of 10.6 Mt grading 1% Li₂O. Drilling has further defined the Medcalf West Exploration Target of 3-5 Mt at 1-1.4% Li₂O. The program also aims to provide diamond core for metallurgical and geotechnical test work. Following the recent Medcalf resource upgrade, which raised contained Li₂O by 34%, Charger's board has committed to a Scoping Study on the Lake Johnston Project. The current resource sits on a predominantly 40 m x 80 m drilling grid, including 10,936 m of drilling at a cost of $32 per tone of contained Li₂O. The program is fully funded from Charger's sale of the Bynoe Lithium Project to Core Lithium for $3.75 million cash, received on 17 July 2026. Lake Johnston lies 450 km east of Perth in the Yilgarn Province, about 70 km from the Earl Grey Lithium Project, where Covalent Lithium began mining and commissioning in March 2024.
Sep 25, 2026 15:15 (GMT+8)
[SMM News] Savannah raised over $40 million to develop the Portuguese lithium project
Sep 25, 2026 15:14 (GMT+8)
[SMM News] Savannah raised over $40 million to develop the Portuguese lithium project
Read More
[SMM News] Savannah raised over $40 million to develop the Portuguese lithium project
[SMM News] Savannah raised over $40 million to develop the Portuguese lithium project
On September 23(rd), Savannah Resources raised US$30 million for its Barroso Lithium Project in Portugal, via 408 million shares at £0.055/share, including US$11.2 million from subscription agreements with major shareholders. Combined with US$15.5 million cash on hand, funds go toward long lead item fabrication, access road works, EPCM contracting, plant engineering, permitting, and land use rights. Barroso's July 2026 phase one DFS outlined a 14-year mine life at 183,000 t/y lithium oxide, 5.5% grade, based on US$1,788/t pricing yielding US$3.2 billion EBITDA, US$1.9 billion free cash flow, and US$913 million post-tax NPV. The deposit holds 39 million tones at 1.05% Li2O for 411,900 tones contained, Europe's largest hard-rock spodumene resource. The funding advances one of the few large-scale hard-rock lithium sources under development outside China linked African and South American supply chains, feeding EU critical raw material diversification targets.
Sep 25, 2026 15:14 (GMT+8)