[brief comment on Zinc in SMM period] the social inventory in the three places has recorded an increase in zinc exploration in Shanghai and a lower level of less than 20, 000.

Published: Jun 14, 2019 16:48 (GMT+8)

SMM6 14 / 14 / PRNewswire-FirstCall-Asianet /-

The main 1908 contract of Shanghai zinc opened at 20155 yuan / ton within a day, the short position entered the market substantially at the beginning of the day, Shanghai zinc opened high and low, all the way down to 20070 yuan / ton, failed to try to go up again, and then the short position left the market to boost Shanghai zinc to 20120 yuan / ton first line narrow range finishing, the operating range does not exceed 30 yuan / ton, enter the European trading period, and then the short exit boosts the Shanghai zinc to the first line of 20120 yuan / ton narrow range finishing, the operating range does not exceed 30 yuan / ton, entering the European trading period. Dragged down by the outside market, Shanghai zinc quickly pierced 20000 yuan / ton integer level support, all the way down 19990 yuan / ton Xu Li returned to rise, up to 20100 yuan / ton, recorded a V shape, backfilling most of the decline, closing down 20100 yuan / ton, down 185 yuan / ton, down 0.91%, trading volume increased by 169000 hands to 434000 hands, and position volume increased by 22444 hands to 286000 hands. During the day, Shanghai zinc recorded three consecutive yin, the overall jump off the middle track of Bolin Road, the KDJ index turned downward, showing a more obvious downward trend of Shanghai zinc, the social inventory of Shanghai, Guangdong and Tianjin increased compared with last Thursday, the superimposed market is still strong, but the consumer side is still no obvious improvement, Shanghai zinc current action can be weak, night observation Brindao middle track suppression.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Pre-holiday stockpiling consumption was moderate; SHFE zinc consolidated on a subdued note [SMM zinc futures review]
4 hours ago
Pre-holiday stockpiling consumption was moderate; SHFE zinc consolidated on a subdued note [SMM zinc futures review]
Read More
Pre-holiday stockpiling consumption was moderate; SHFE zinc consolidated on a subdued note [SMM zinc futures review]
Pre-holiday stockpiling consumption was moderate; SHFE zinc consolidated on a subdued note [SMM zinc futures review]
[Pre-holiday stockpiling consumption average, SHFE zinc consolidates on a subdued note] The most-traded SHFE zinc 2611 contract opened at 26,750 yuan/mt, then declined all the way after the open, hitting a high of 26,760 yuan/mt in early trading and a low of 26,510 yuan/mt near the close, before ending down at 26,515 yuan/mt, down 195 yuan/mt or 0.73%, with trading volume up 11,160 lots to 60,363 lots.....
4 hours ago
Data: SHFE, DCE market movement (Sep 23)
4 hours ago
Data: SHFE, DCE market movement (Sep 23)
Read More
Data: SHFE, DCE market movement (Sep 23)
Data: SHFE, DCE market movement (Sep 23)
The following table shows the ferrous and nonferrous metals movement on the SHFE and DCE on 23 Sep , 2026
4 hours ago
Santacruz acquires 500tpd lead-zinc flotation mill in Bolivia
6 hours ago
Santacruz acquires 500tpd lead-zinc flotation mill in Bolivia
Read More
Santacruz acquires 500tpd lead-zinc flotation mill in Bolivia
Santacruz acquires 500tpd lead-zinc flotation mill in Bolivia
Santacruz Silver Mining (TSX-V: SCZ) has acquired a 500-tonne-per-day milling facility in Bolivia for a total investment of about US$14 million, including a US$9.2 million purchase price of which US$4.6 million has been paid, with the balance due November 8, 2026, and plant handover expected on October 8, 2026. The facility comprises two 250-tpd circuits equipped with selective lead and zinc flotation systems that also recover high-grade silver, and will process ore from San Lucas, the company's wholly owned Bolivian subsidiary. Located about 5 km from the Reserva mine in the Caballo Blanco group, the plant is slated for commissioning in Q4 2026 and commercial production by year-end 2026. Routing San Lucas ore to the new mill frees capacity at Santacruz's three existing Bolivian plants, s
6 hours ago