June 10 Shanghai zinc spot news: zinc futures market shipment mainly underwater expansion market transaction is flat

Published: Jun 10, 2019 11:53 (GMT+8)
SMM June 10: Shanghai 0 # zinc mainstream transaction 21100 21240 yuan / ton, Shuangyan, Chihong transactions in 21140 21280 yuan / ton, 0 # ordinary June discount 60-40 yuan / ton; Shuangyan, Chi Hong newspaper discount 20 yuan / ton-Pingshui. 1 # the mainstream transaction was 21050 to 21,180 yuan per ton.

SMM6 News of the 10th of July:

Shanghai 0 # zinc mainstream transaction 21100 21240 yuan / ton, Shuangyan, Chihong 2140 21280 yuan / ton, 0 # ordinary June discount 60-discount 40 yuan / ton; Shuangyan, Chi Hong discount 20 yuan / ton-flat water. 1 # the mainstream transaction was 21050 to 21,180 yuan per ton. Shanghai Zinc 1906 contract intraday wide shock operation, the morning market closed at 21225 yuan / ton. Zinc futures are higher, the monthly difference is slightly higher, smelters ship normally, market shipments are dominant, and trading orders are relatively active in the morning market, and transactions are relatively active with an average net price of 10 yuan per ton. Shengtianshui quotation from the discount 30-discount 20 yuan / ton under the expansion to discount 50-discount 40 yuan / ton transaction is still weak, the receiver looks at the weak rising water waiting mood is stronger. After entering the second trading period, after the cost is determined, the trader further adjusts the price to the discount 60-50 yuan / ton. Due to the arrival of delivery, the spot transfer is relatively appropriate, and some of the consignors actively receive the goods at a low price to stimulate part of the transaction. Rising water stabilized but the recovery of transactions is relatively limited, downstream fear of high wait-and-see, waiting for delivery after the end of the market, only to do just the need to purchase, at the same time the transaction is flat, not as good as last Friday.

0# brand

Transaction interval

1906

Shuangyan and Chihong

21140 21280

Discount 20-flat water

Qin Zinc, Kirin, Jiulong, Yuguang

21100 21240

Sticker 60-sticker 40

SMC, KZ, YP, Russia

21090 21220

Sticker 70-sticker 50

"Click to view SMM historical price data




"Click to view SMM historical price data

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Oct 02, 2026 14:34 (GMT+8)
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Read More
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Coherent launched PhotonLink, an integrated optics platform for AI infrastructure incorporating Indium Phosphide (InP) lasers, silicon photonics, detectors and optical modules. The company disclosed more than 10 CPO engagements, over 10 NPO engagements and more than five chip-to-chip connectivity projects, with anchor customers and long-term agreements secured for both CPO and NPO. Revenue is expected to begin ramping in Q4 2026. Coherent has shipped over 300 million InP lasers and is expanding its 6-inch InP manufacturing capacity to support the ramp. The customer pipeline provides a clearer commercial demand signal for InP devices and upstream materials, although additional capacity and indium consumption were not disclosed.
Oct 02, 2026 14:34 (GMT+8)
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Oct 02, 2026 10:40 (GMT+8)
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Read More
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Minerals announced that JDS Energy & Mining had completed a preliminary underground inspection at its wholly owned Talisman project in Washington State. No immediate impediment to safe re-entry was identified, and mineralization including sphalerite was observed near the portal and adit. More than 200 soil samples await results. Significant underground work still requires detailed geotechnical assessment, support design and stope inspection. Mineral observations do not establish grade, continuity, tonnage or economic potential.
Oct 02, 2026 10:40 (GMT+8)
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Oct 02, 2026 10:39 (GMT+8)
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Read More
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Windfall Geotek announced renewal of 592 hectares of claims in Canada’s Bathurst Mining Camp. Zinc targets at Upper Sprig Brook were generated using an AI model trained on zinc-copper assays from seven local volcanogenic massive sulphide deposits. The company plans historical-data compilation and rock or soil sampling to advance target validation and subsequent drill targeting. No new drilling assays or mineral resource estimate were announced.
Oct 02, 2026 10:39 (GMT+8)
June 10 Shanghai zinc spot news: zinc futures market shipment mainly underwater expansion market transaction is flat - Shanghai Metals Market (SMM)