Falling market drives cobalt sulphate producer to shift capacity 

Published: Jun 6, 2019 10:56
The destocking inclination is likely to expand downside room in prices in the short term

SHANGHAI, Jun 6 (SMM) – A major cobalt smelter in Zhejiang province transferred 400 mt, in Co content, of cobalt sulphate capacity into nickel salt production since the start of May, as poorer demand from power batteries dragged on prices of cobalt sulphate, an SMM survey showed on Thursday June 6. 

A pessimistic outlook on cobalt sulphate prices also prompted the smelter to destock actively. This is likely to expand the downside room in prices in the short term. 

As of Wednesday June 5, offers of cobalt sulphate stood at 41,000-43,000 yuan/mt, with an average price of 42,000 yuan/mt. On a metal content basis, this stood at a discount of 40,000 yuan/mt against refined cobalt, and a discount of 10,000 yuan/mt over cobalt chloride. 

Higher prices of cobalt hydroxide, a raw material for producing cobalt sulphate, eroded profits at smelters and also depressed their production enthusiasm. SMM assessed prices of cobalt hydroxide at $9.7-10.2/lb as of Wednesday June 5. 

Output of ternary materials decreased last month as battery plants lowered their demand for NCM523 and NCM622. This accounted for the weaker consumption of cobalt sulphate, as the feedstock for ternary materials. 

The market expects demand for ternary materials unlikely to improve in the next two months. 

According to SMM data, the first four months saw a surplus of cobalt sulphate by 600 mt in metal content. Output of the material is estimated to fall 11% on the month in May, with producers clearing their inventories. 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Platinum futures drift higher; spot market trading moderate [SMM daily review]
1 hour ago
Platinum futures drift higher; spot market trading moderate [SMM daily review]
Read More
Platinum futures drift higher; spot market trading moderate [SMM daily review]
Platinum futures drift higher; spot market trading moderate [SMM daily review]
1 hour ago
US August CPI Data Released; Silver Market Sees Strong Wait-and-See Sentiment as Futures Consolidate [SMM Daily Review]
1 hour ago
US August CPI Data Released; Silver Market Sees Strong Wait-and-See Sentiment as Futures Consolidate [SMM Daily Review]
Read More
US August CPI Data Released; Silver Market Sees Strong Wait-and-See Sentiment as Futures Consolidate [SMM Daily Review]
US August CPI Data Released; Silver Market Sees Strong Wait-and-See Sentiment as Futures Consolidate [SMM Daily Review]
1 hour ago
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
Sep 12, 2026 16:51
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
Read More
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
At 9:58 am on 12 September, the core smelting furnace of the polymetallic recovery project's pyrometallurgy system at Yingkou Jianfa Shenghai Nonferrous Chemical Co., Ltd. was successfully ignited, officially entering the furnace drying stage and marking a key step toward full-line commissioning and production. Public information shows that the Yingkou Jianfa Shenghai polymetallic complex gold-silver ore comprehensive recovery technology upgrade, relocation and expansion project uses copper concentrates as its main raw material, with an overall planned capacity of 600,000 mt/year of copper cathode. It is being built in two phases, with capacity of 300,000 mt/year in each phase. Phase one is designed to produce 300,000 mt/year of copper cathode and 1.18 million mt/year of sulphuric acid, supported by smelting, converting, anode refining, electrolysis, slag beneficiation and precious metal recovery systems. Following the ignition, the project will carry out standardised furnace drying and hot-state integrated commissioning across the entire system, verifying equipment, instrumentation, interlocks and automatic control systems. The project has not yet formally started raw material feed and production. Once furnace drying and system commissioning are completed, it will move forward with bringing the phase-one 300,000 mt/year copper cathode capacity into production. If the project is successfully commissioned, it will increase copper smelting capacity in north-east China and further boost China's demand for copper concentrate raw materials.
Sep 12, 2026 16:51
Falling market drives cobalt sulphate producer to shift capacity  - Shanghai Metals Market (SMM)