Environmental impact assessment of Qingtuo annual heat treatment 530000 tons stainless steel products with an annual output of 6000 tons of finished products

Published: Jun 5, 2019 15:30
Source: SMM

SMM Network News: 1. Stainless Steel Heat treatment Project of Fujian Qingtuo Industrial Co., Ltd.

Nature of the project: expansion

Industry category: C3360 metal surface treatment and heat treatment

Construction site: Wan Wu Zhen Sha Wan Cun, Fu'an City

Construction scale: annual heat treatment of 530000 tons of stainless steel products

Construction content: construction of 2 annular solid solution furnaces, 20 bell annealing furnaces and 4 trolley solid melting furnaces, annual heat treatment of 530000 tons of stainless steel products, At the same time, we will build three Φ 4.2m two-stage gas generators, electrical facilities, water treatment and related public auxiliary facilities.

Construction cycle: the project construction cycle is 18 months, from June 2019 to December 2020.

Investment: the total investment in the project is 200 million yuan, of which the investment in environmental protection is 14.82 million yuan, accounting for 7.4% of the total investment in the project.

Production system: the production workshop adopts three shifts of continuous work system, each shift 8 hours, working time 300 days.

Labor fixed staff: the new labor staff of the project is about 85, of which 80 are production workers and 5 are managers.

After the completion of the project, the annual processing of 530000 tons of stainless steel products, the main production products include stainless steel wire and stainless steel bar profiles.

II. Fujian Qingtuo equipment Manufacturing Co., Ltd. Metallurgical equipment and Accessories Manufacturing Project

Project nature: new

Industry category: C3516 special equipment for metallurgy

Construction site: Longzhu Village, Wanwu Town, Fu'an City, located east of Grade II Road on the south side of Dingxin Industrial Office Building (Longzhu Village)

Construction scale: annual output of 6000 tons of finishing products

Construction cycle: the project construction cycle is 4 months, from June 2019 to October 2019.

Investment: the total investment in the project is 118 million yuan, of which the investment in environmental protection is 500000 yuan, accounting for 0.42% of the total investment in the project.

Production system: single shift production, each shift 8 hours, working hours 280 days.

Labor personnel: the number of project personnel is 75.

After the completion of the project, it is mainly engaged in the production and manufacture of metallurgical equipment and accessories, including finishing products, flanges, continuous casting rollers and other products.

"[investment must see] Trade friction news flying all over the metal how to win in chaos?

"Click to enter the registration page

Scan QR code and apply to join SMM metal exchange group, please indicate company + name + main business

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
SMM Nickel Flash: NPI Market Weakens, Sentiment and Trading Sluggish in June
32 mins ago
SMM Nickel Flash: NPI Market Weakens, Sentiment and Trading Sluggish in June
Read More
SMM Nickel Flash: NPI Market Weakens, Sentiment and Trading Sluggish in June
SMM Nickel Flash: NPI Market Weakens, Sentiment and Trading Sluggish in June
[SMM Nickel Flash] June 24 - The SMM high-grade NPI market sentiment factor was 2.23, down 0.04 MoM. The upstream sentiment factor for high-grade NPI was 2.59, down 0.08 MoM, and the downstream sentiment factor was 1.86, down 0.02 MoM. The NPI market weakened overall today, with extremely sluggish trading. The supply-demand price spread continued to widen. The substitution effect of steel scrap, combined with expectations of steel mill maintenance, doubly weighed on NPI demand.
32 mins ago
[SMM Analysis] May Hydrometallurgy Intermediate Products Import and Export
1 hour ago
[SMM Analysis] May Hydrometallurgy Intermediate Products Import and Export
Read More
[SMM Analysis] May Hydrometallurgy Intermediate Products Import and Export
[SMM Analysis] May Hydrometallurgy Intermediate Products Import and Export
1 hour ago
[SMM Flash News] Indonesia Reportedly Considering Easing Nickel Mining Quotas in H2; Unconfirmed by ESDM
3 hours ago
[SMM Flash News] Indonesia Reportedly Considering Easing Nickel Mining Quotas in H2; Unconfirmed by ESDM
Read More
[SMM Flash News] Indonesia Reportedly Considering Easing Nickel Mining Quotas in H2; Unconfirmed by ESDM
[SMM Flash News] Indonesia Reportedly Considering Easing Nickel Mining Quotas in H2; Unconfirmed by ESDM
Market rumors suggest that Indonesia may relax the restrictions on the annual nickel ore mining quota (RKAB) in the second half of this year. This move may alleviate the tight raw material supply situation of local smelting enterprises, but it may also put downward pressure on international nickel prices. According to an unnamed informed source, the government may adjust a significant amount of the total annual nickel ore mining quota in the middle of the year, and some nickel ore enterprises plan to submit applications for quota increases early next month. However, the news is currently highly uncertain. As of now, there have been no clear reports from local Indonesian media, and the Ministry of Energy and Mineral Resources (ESDM) of Indonesia has not issued any official news or statements to confirm the claim regarding a substantial quota revision. The plan to relax the quota still has significant uncertainties, and SMM will continue to closely monitor the actual progress and official developments of this event.
3 hours ago