Tangshan to ease steel production curbs in Jun

Published: Jun 04, 2019 11:39 (GMT+8)
This is likely to keep supplies high and weigh on prices

SHANGHAI, Jun 4 (SMM) – Tangshan city, China’s top steelmaking hub in Hebei province, appeared to let up production curbs over steelmakers in June, which is likely to keep supplies high and weigh on prices.

Steels mills, which were set to relocate to rural areas, were exempted in the city's Tangshan June work plan on air pollution control and treatment released on Friday May 31.

The plan retained output curbs on steel mills in the Tangshan districts of Lunan, Lubei, Kaiping, Guye, Fengnan, Qian’an, Luanzhou, Luannan, Laoting, Caofeidian and harbour development zone. Sintering and pelletising stages and lime kilns will continue to face capacity cuts by 50%. 

Cutbacks on blast furnaces and converters will remain unchanged from levels seen in winter heating season, and category-A mills are exempted from the cuts.

Most mills surveyed by SMM felt that the new work plan would have limited impact on their current operations. A category B mill in Qian’an district even planned to resume a 1,080- m³ blast furnace, and expects its output of long steel to increase by 50,000 mt in June.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
China: Zaozhuang 115 MW / 100 MWh Standalone Frequency Regulation BESS EIA Accepted
Oct 30, 2026 18:41 (GMT+8)
China: Zaozhuang 115 MW / 100 MWh Standalone Frequency Regulation BESS EIA Accepted
Read More
China: Zaozhuang 115 MW / 100 MWh Standalone Frequency Regulation BESS EIA Accepted
China: Zaozhuang 115 MW / 100 MWh Standalone Frequency Regulation BESS EIA Accepted
October 26, 2026: The environmental impact assessment for a 115 MW / 100 MWh standalone frequency regulation battery storage station in Xigang Town, Tengzhou City, Zaozhuang, Shandong Province, was accepted for review. The developer is Zhongting Haoze (Tengzhou) Energy Storage Technology Co., Ltd. The project includes one 140 MVA main transformer (35/220 kV) with a total investment of RMB 230 million. Positioned for grid frequency regulation services, the EIA acceptance indicates the project is advancing toward construction readiness.
Oct 30, 2026 18:41 (GMT+8)
China: Yuncheng 100 MW / 140.4 MWh Hybrid BESS Project Issues Tender
Oct 30, 2026 18:41 (GMT+8)
China: Yuncheng 100 MW / 140.4 MWh Hybrid BESS Project Issues Tender
Read More
China: Yuncheng 100 MW / 140.4 MWh Hybrid BESS Project Issues Tender
China: Yuncheng 100 MW / 140.4 MWh Hybrid BESS Project Issues Tender
October 8, 2026: A tender was issued for the 100 MW / 140.4 MWh hybrid energy storage project in Jiang County, Yuncheng, Shanxi Province. The tender covers lithium iron phosphate battery energy storage system integration. Upon completion, the project will provide peak shaving, frequency regulation, and renewable energy accommodation services for the Shanxi grid. Shanxi, as a major new energy province, has seen frequent storage procurement activity reflecting urgent demand for flexible resources.
Oct 30, 2026 18:41 (GMT+8)
China’s Semi-Steel Tire Exports Down 0.92% Cumulative YoY Jan-Aug 2026
Oct 08, 2026 16:26 (GMT+8)
China’s Semi-Steel Tire Exports Down 0.92% Cumulative YoY Jan-Aug 2026
Read More
China’s Semi-Steel Tire Exports Down 0.92% Cumulative YoY Jan-Aug 2026
China’s Semi-Steel Tire Exports Down 0.92% Cumulative YoY Jan-Aug 2026
[SMM Flash] According to customs data, in August 2026, China exported 29.696 million semi-steel tires (including retreaded tires), with cumulative exports from January to August totaling 235.7676 million units, down 0.92% YoY.
Oct 08, 2026 16:26 (GMT+8)