SMM Evening Comments (May 29)

Published: May 29, 2019 17:15 (GMT+8)
SHFE nonferrous metals declined across the board on May 29

SHANGHAI, May 29 (SMM) – SHFE nonferrous metals declined across the board with nickel led the losses and ended 2.1% lower. Copper slid 0.9%, aluminium and lead fell 0.7%, zinc dipped 0.5%, and tin eased 0.1%. 

The ferrous complex closed mostly lower as iron ore dropped 1.6%, coke slipped 1.1%, rebar lost 0.5%, while hot-rolled coil went flat, and coking coal grew 0.1%. 

Copper: As longs continued to cover their positions and moved to the SHFE back-month contracts, the most-liquid SHFE July contract dipped to an intraday low of 46,790 yuan/mt, and ended 0.89% lower on the day at 46,810 yuan/mt. Open interests lost 1,830 lots to 226,000 lots, while open interests across the August and September contracts gained 8,226 lots. Bearish signs from the KDJ indicators may see the July contract testing support from 46,800 yuan/mt tonight. 

Aluminium: The most-active SHFE July contract failed to rebound considerably after exiting longs and greater shorts dragged it to an intraday low of 14,165 yuan/mt in early trades. It dipped to the Bollinger middle band and ended the trading day 0.67% lower at 14,170 yuan/mt. As the MACD green line lengthened and the KDJ indicators expanded downwards, the contract is likely to trade between 14,170-14,240 yuan/mt tonight. 

Zinc: The most-traded SHFE July contract recovered some ground after it slid to a low of 20,520 yuan/mt, but growing shorts kept it from exceeding 20,640 yuan/mt and settled it 0.53% lower on the day at 20,575 yuan/mt. A lack of confidence in longs will see the contract hovering between the five- and 20-day moving averages tonight. 

Nickel: While base metals fell across the board, nickel led the losses with a decline of 2.06%, as the most-traded SHFE July contract traded with pressure from the daily moving average after a sharp decline overnight. As the KDJ indicators expanded downwards and the MACD red line shortened, the contract may struggle to stand above the 10-day moving average tonight. 

Lead: The most-active SHFE July contract lost support from the 16,000 yuan/mt level as shorts weighed it to a low of 15,865 yuan/mt before noon. It rebounded to around 16,010 yuan/mt, and finished the trading day 0.65% lower at 15,945 yuan/mt. Pressure from shorts will keep the contract weak tonight, with support from 15,800 yuan/mt. 

Tin: The most-traded SHFE September extended its rangebound trend from overnight, with continued pressure from the 20-day moving average. It lost 0.1% on the day and closed at 145,500 yuan/mt. Pressure above is expected at 146,200 yuan/mt tonight. 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Ghana draft bill proposes state special share and shorter mining leases
Oct 02, 2026 15:49 (GMT+8)
Ghana draft bill proposes state special share and shorter mining leases
Read More
Ghana draft bill proposes state special share and shorter mining leases
Ghana draft bill proposes state special share and shorter mining leases
[SMM Gold Flash] A draft mining bill reviewed by Reuters on 30 September would let Ghana’s mines minister require companies to issue the state a free special share with consent rights over major transactions. It would retain the existing 10% free-carried state interest and limit mining leases to 15 years or the projected mine life, whichever is shorter. The draft would also allow future rules requiring local processing and restricting exports of unprocessed concentrates. None of these proposals has been enacted; Reuters did not establish when the draft was prepared. For Ghana’s gold miners, the proposed rights and shorter leases could affect financing, valuations and renewal decisions. Under the draft, existing rights holders seeking renewal would receive priority consideration for equivalent licences. Mining companies expect further consultation before parliamentary debate, Reuters reported. The final wording and timing remain uncertain.
Oct 02, 2026 15:49 (GMT+8)
PGMs: Independent tests advance platinum and palladium battery technology
Oct 02, 2026 15:48 (GMT+8)
PGMs: Independent tests advance platinum and palladium battery technology
Read More
PGMs: Independent tests advance platinum and palladium battery technology
PGMs: Independent tests advance platinum and palladium battery technology
[SMM PGM Flash] Platinum Group Metals said on 1 October that independent testing by the Battery Innovation Center had validated its Lion Battery subsidiary’s platinum- and palladium-based electrodes in prototype lithium-sulphur cells. Compared with cells without the catalysts, the prototypes showed better capacity and rate capability, with palladium-rich formulations performing best overall. Platinum Group and Valterra Platinum, which own Lion 52% and 48% respectively, have approved funding for the next phase. The result offers a possible new use for PGMs beyond vehicle exhaust catalysts, but remains a prototype milestone. Lion plans to make and test pouch cells, refine the catalysts and assess applications including drones. Commercial performance and demand for significant PGM volumes have yet to be established. The work is relevant to Southern African suppliers: Valterra produces PGMs in South Africa and Zimbabwe, while Platinum Group is developing South Africa’s Waterberg project.
Oct 02, 2026 15:48 (GMT+8)
Sibanye reaches East Boulder wage agreement; separate US strike continues
Oct 01, 2026 16:45 (GMT+8)
Sibanye reaches East Boulder wage agreement; separate US strike continues
Read More
Sibanye reaches East Boulder wage agreement; separate US strike continues
Sibanye reaches East Boulder wage agreement; separate US strike continues
[SMM PGM Flash] Sibanye-Stillwater announced on 30 September that workers at its East Boulder platinum and palladium mine in Montana had ratified a collective agreement with the United Steelworkers. The deal runs retroactively from 1 August 2026 to 31 July 2029, with a 4.5% wage increase in year one, the greater of 3.5% or CPI in year two and the greater of 3.0% or CPI in year three. Strike action at the separate Stillwater East mine and Columbus metallurgical facility continues, the company said. The East Boulder settlement fixes part of the labour-cost path for Sibanye’s US PGM business and supports its planned shift towards more mechanised mining and team-based incentives. It does not resolve the other strike or demonstrate a recovery in output; the company disclosed no revised production guidance in this release.
Oct 01, 2026 16:45 (GMT+8)