Tangshan Jinma Iron and Steel 3 million ton Fine Steel Base settled in Chifeng-Shanghai Metals Market

Hot Keywords

  • Zinc
  • MMi Iron Ore Port Index
  • Copper
  • Copper scrap
  • Market commentary
  • Aluminium
  • Nickel
  • Steel
  • price
  • Macroeconomics
  • Iron ore
  • Evening comments
  • Futures movement
  • Morning comments
  • Inventory data

Tangshan Jinma Iron and Steel 3 million ton Fine Steel Base settled in Chifeng

Translation 10:30:47AM May 27, 2019 Source:China Metallurgical Journal

SMM News: recently, Ningcheng County, Chifeng City, Inner Mongolia, announced that the steel base construction and capacity replacement project with a total investment of 12.5 billion yuan by Tangshan Jinma Iron and Steel Group was located in Ningcheng County, Chifeng City, which is located in Xizi solid waste Park, covering an area of 3200 mu. It is planned to build an annual production capacity of 3 million tons of fine steel base, the construction of Defeng coking capacity replacement of 1.8 million tons of coke and joint production of 300000 tons of methanol, 100000 tons of liquid NH3 project. Construction is expected to start in 2020, with a construction period of 36 months, with a tax revenue of 1 billion yuan and 6000 jobs.

According to the official website of Tangshan Jinma Iron and Steel Group Co., Ltd., Tangshan Jinma Iron and Steel Co., Ltd. is located in the Economic Development Zone of Luanxian County, Hebei Province. It was founded in the 1990s and was restructured in 2009 to set up Luanxian Jinma Industry Co., Ltd., with existing fixed assets of 6 billion yuan. Tangshan Jinma Iron and Steel Group Co., Ltd. was established in December 2017 with 5200 employees. The enterprise is mainly equipped with two 180 square meters sintering machines, two 96 square meters sintering machines, one 12 square meters shaft furnace, one blast furnace of 500m3, 1080 cubic meters and 1350 cubic meters, and two 120t converters. 750mm, 850mm hot strip production line, 1250 mm cold rolling and pickling galvanizing production line, with an annual ironmaking capacity of 2.59 million tons, steelmaking capacity of 2.4 million tons.

According to the announcement of the capacity replacement plan for the construction project of Tangshan Jinma Iron and Steel Group Co., Ltd., issued by the Hebei Provincial Department of Industry and Information Technology on November 27, 2018, Tangshan Jinma Iron and Steel Company plans to implement the reduction replacement in the original factory area (Ciyutuo Industrial Zone, Luanxian County, Tangshan City, Hebei Province) in March 2019, build a new blast furnace of 1500 cubic meters, and phase out the original 1500 cubic meters and 1080 cubic meters of blast furnace at the same time.

 

"[investment must see] Trade friction news flying all over the metal how to win in chaos?

"Click to enter the registration page

Scan QR code and apply to join SMM metal exchange group, please indicate company + name + main business

 

Key Words:  Steel  steel plate  steel bar  steel price 

Tangshan Jinma Iron and Steel 3 million ton Fine Steel Base settled in Chifeng

Translation 10:30:47AM May 27, 2019 Source:China Metallurgical Journal

SMM News: recently, Ningcheng County, Chifeng City, Inner Mongolia, announced that the steel base construction and capacity replacement project with a total investment of 12.5 billion yuan by Tangshan Jinma Iron and Steel Group was located in Ningcheng County, Chifeng City, which is located in Xizi solid waste Park, covering an area of 3200 mu. It is planned to build an annual production capacity of 3 million tons of fine steel base, the construction of Defeng coking capacity replacement of 1.8 million tons of coke and joint production of 300000 tons of methanol, 100000 tons of liquid NH3 project. Construction is expected to start in 2020, with a construction period of 36 months, with a tax revenue of 1 billion yuan and 6000 jobs.

According to the official website of Tangshan Jinma Iron and Steel Group Co., Ltd., Tangshan Jinma Iron and Steel Co., Ltd. is located in the Economic Development Zone of Luanxian County, Hebei Province. It was founded in the 1990s and was restructured in 2009 to set up Luanxian Jinma Industry Co., Ltd., with existing fixed assets of 6 billion yuan. Tangshan Jinma Iron and Steel Group Co., Ltd. was established in December 2017 with 5200 employees. The enterprise is mainly equipped with two 180 square meters sintering machines, two 96 square meters sintering machines, one 12 square meters shaft furnace, one blast furnace of 500m3, 1080 cubic meters and 1350 cubic meters, and two 120t converters. 750mm, 850mm hot strip production line, 1250 mm cold rolling and pickling galvanizing production line, with an annual ironmaking capacity of 2.59 million tons, steelmaking capacity of 2.4 million tons.

According to the announcement of the capacity replacement plan for the construction project of Tangshan Jinma Iron and Steel Group Co., Ltd., issued by the Hebei Provincial Department of Industry and Information Technology on November 27, 2018, Tangshan Jinma Iron and Steel Company plans to implement the reduction replacement in the original factory area (Ciyutuo Industrial Zone, Luanxian County, Tangshan City, Hebei Province) in March 2019, build a new blast furnace of 1500 cubic meters, and phase out the original 1500 cubic meters and 1080 cubic meters of blast furnace at the same time.

 

"[investment must see] Trade friction news flying all over the metal how to win in chaos?

"Click to enter the registration page

Scan QR code and apply to join SMM metal exchange group, please indicate company + name + main business

 

Key Words:  Steel  steel plate  steel bar  steel price