Jiangsu's first "light charging and storage + one-stop" service charging station put into operation-Shanghai Metals Market

Hot Keywords

  • Nickel market
  • Copper
  • Silicon
  • Nickel ore
  • Aluminium
  • Inventory data
  • Sales data
  • Market commentary
  • Evening comments
  • Stainless steel
  • Production data
  • Nickel
  • Zinc
  • Morning comments
  • Futures movement

Jiangsu's first "light charging and storage + one-stop" service charging station put into operation

Translation 01:26:42PM May 13, 2019 Source:China Jiangsu Network
The content below was translated by Tencent automatically for reference.

SMM News: "Today is the first day of trial operation of our charging station, charging to enjoy a preferential price." Recently, Dongting Chunchao Road charging station put into trial operation, the staff member Qiao Lei is introducing the preferential activities during the trial operation to the new energy owners. From the national network Wuxi power supply company learned that this is the province's first "optical charging and storage + one-stop" service charging station.

The "light charging and storage + one-stop" service charging station is located at the junction of Chunchao Road and Youyi South Road in Xishan District, covering an area of 1258.62 square meters. A total of 22 charging piles were built in the station, as well as a roof distributed photovoltaic power station with an installed capacity of 16.5 kilowatts and a 600 kilowatt-hour energy storage power station. According to the person in charge of Wuxi Power supply Company, using the roof of the 110 kV substation skirt near the charging station, the power supply company has built a distributed photovoltaic system to charge electric vehicles with green energy. The intelligent control system in the station can monitor the power value of energy input and external energy output in real time. The energy storage system adjusts the energy input and output in real time, and optimizes the allocation of electric energy, solar energy, chemical energy and other energy forms, so as to maximize the comprehensive energy use efficiency.

In addition to charging new energy vehicles, the charging station also provides a range of convenience services. The station has created a comfortable lounge with air conditioning, massage chairs, tables and chairs, vending machines, automatic water heaters, shared mobile phones portable battery, safety medicine boxes and so on.

The station also set up a charging pile management one-stop service center, every working day from 08:30 to 5 p.m., the power supply company staff on the spot to accept the charging pile installation business consultation. After the user who needs to install the personal charging pile provides parking space property certificate and other materials, the staff can go to the business hall on their behalf and complete the application at one time, without the need for the user to run more errands. The center can also act as an agent for users to sell electricity cards, deal with charging failures and so on. In addition, through the mobile phone APP "pile electric treasure", users can achieve site query, distributed navigation, online payment and other functions.

On the day of trial operation, Dongting Chunchao Road charging station attracted Geely car dealers, Lifan car dealers, Jiangnan passenger transport and other enterprises to visit and study. It is reported that the power supply company will take Dongting Chunchao Road charging station as a template to build a charging pile demonstration station group. This year, Wuxi Power supply Company will also innovate the investment model, improve the charging network of urban electric vehicles, strengthen cooperation with public transport, passenger transport companies, ride-hailing companies and other units, market-oriented demand-oriented, rational planning of site layout.

Original title: provincial first "light charging and storage + one-stop" service charging station to provide a series of convenient services

Jiangsu's first "light charging and storage + one-stop" service charging station put into operation

Translation 01:26:42PM May 13, 2019 Source:China Jiangsu Network
The content below was translated by Tencent automatically for reference.

SMM News: "Today is the first day of trial operation of our charging station, charging to enjoy a preferential price." Recently, Dongting Chunchao Road charging station put into trial operation, the staff member Qiao Lei is introducing the preferential activities during the trial operation to the new energy owners. From the national network Wuxi power supply company learned that this is the province's first "optical charging and storage + one-stop" service charging station.

The "light charging and storage + one-stop" service charging station is located at the junction of Chunchao Road and Youyi South Road in Xishan District, covering an area of 1258.62 square meters. A total of 22 charging piles were built in the station, as well as a roof distributed photovoltaic power station with an installed capacity of 16.5 kilowatts and a 600 kilowatt-hour energy storage power station. According to the person in charge of Wuxi Power supply Company, using the roof of the 110 kV substation skirt near the charging station, the power supply company has built a distributed photovoltaic system to charge electric vehicles with green energy. The intelligent control system in the station can monitor the power value of energy input and external energy output in real time. The energy storage system adjusts the energy input and output in real time, and optimizes the allocation of electric energy, solar energy, chemical energy and other energy forms, so as to maximize the comprehensive energy use efficiency.

In addition to charging new energy vehicles, the charging station also provides a range of convenience services. The station has created a comfortable lounge with air conditioning, massage chairs, tables and chairs, vending machines, automatic water heaters, shared mobile phones portable battery, safety medicine boxes and so on.

The station also set up a charging pile management one-stop service center, every working day from 08:30 to 5 p.m., the power supply company staff on the spot to accept the charging pile installation business consultation. After the user who needs to install the personal charging pile provides parking space property certificate and other materials, the staff can go to the business hall on their behalf and complete the application at one time, without the need for the user to run more errands. The center can also act as an agent for users to sell electricity cards, deal with charging failures and so on. In addition, through the mobile phone APP "pile electric treasure", users can achieve site query, distributed navigation, online payment and other functions.

On the day of trial operation, Dongting Chunchao Road charging station attracted Geely car dealers, Lifan car dealers, Jiangnan passenger transport and other enterprises to visit and study. It is reported that the power supply company will take Dongting Chunchao Road charging station as a template to build a charging pile demonstration station group. This year, Wuxi Power supply Company will also innovate the investment model, improve the charging network of urban electric vehicles, strengthen cooperation with public transport, passenger transport companies, ride-hailing companies and other units, market-oriented demand-oriented, rational planning of site layout.

Original title: provincial first "light charging and storage + one-stop" service charging station to provide a series of convenient services