Cobalt prices lack upward momentum as demand remains weak

Published: Apr 8, 2019 11:42
Overseas prices of cobalt extended their increase, but still stood some 30,000 yuan/mt lower than prices in Chinese markets

SHANGHAI, Apr 8 (SMM) – Chinese major producers of cobalt hiked offers last week, and this prompted distributors with low inventories to step up restocking, worrying about higher prices near term. However, most downstream consumers hesitated over higher prices, and this cap any upward momentum in domestic prices of cobalt this week. 

A lack of support from downstream demand across cobalt salt producers dragged on trades of cobalt metal in the latter half of last week, SMM learned. 

Overseas prices of cobalt extended their increase from a week earlier, but still stood some 30,000 yuan/mt lower than prices in Chinese markets. 

As of Thursday April 4, high-end traded prices of battery-grade lithium carbonate slid to 79,000 yuan/mt, while low-end prices stood steady at 75,000 yuan/mt. Spot trades above prices of 78,000 yuan/mt were few and trades were barely heard at 80,000 yuan/mt. 

SMM remains bearish about prices of lithium carbonate in the medium- to long- term as demand is unlikely to improve considerably. This is even as a transition period for the phase-out of new energy vehicle subsidies, from March 26 to June 25, may increase demand of lithium carbonate from auto battery producers. 

Prices of lithium hydroxide varied based on their qualities. As of Thursday, the price spread between coarse and fine particle lithium hydroxide of battery grade stood at 10,000-15,000 yuan/mt. 

While some large battery producers purchased coarse particle lithium hydroxide at a low of 90,000 yuan/mt, prices of high-grade fine particle lithium hydroxide used as ternary cathode materials held firm above 105,000 yuan/mt. 

Last week, trades for battery-grade coarse particle lithium hydroxide mostly occurred at 93,000 yuan/mt, and trades for fine particle lithium hydroxide at 103,000 yuan/mt. 

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Precious Metals Remain Range-Bound as Macro Enters Key Validation Window [SMM Precious Metals Macro Analysis]
18 hours ago
Precious Metals Remain Range-Bound as Macro Enters Key Validation Window [SMM Precious Metals Macro Analysis]
Read More
Precious Metals Remain Range-Bound as Macro Enters Key Validation Window [SMM Precious Metals Macro Analysis]
Precious Metals Remain Range-Bound as Macro Enters Key Validation Window [SMM Precious Metals Macro Analysis]
18 hours ago
Amigo Resources Reports PGM Values of Up to 7.07 ppm in Tanzania Processing Testwork​
19 hours ago
Amigo Resources Reports PGM Values of Up to 7.07 ppm in Tanzania Processing Testwork​
Read More
Amigo Resources Reports PGM Values of Up to 7.07 ppm in Tanzania Processing Testwork​
Amigo Resources Reports PGM Values of Up to 7.07 ppm in Tanzania Processing Testwork​
[SMM Flash] Amigo Resources reported independent laboratory results from selected Tanzanian material showing combined PGM values of 6.94–7.07 ppm, alongside residual gold values of 3.27–3.47 ppm. The company said it is assessing the integration of proprietary PGM concentration technology into its processing flowsheets to target recovery from gravity tailings and other residual material. Amigo is also evaluating a pyrometallurgical copper-matte treatment route and has mobilised a small-scale furnace for further testwork.​ The programme could potentially establish PGMs as a recoverable by-product from Amigo's Tanzanian polymetallic material if subsequent metallurgical work demonstrates viable recoveries. However, the reported grades relate to selected test material and processing studies and do not constitute a compliant Mineral Resource, reserve or evidence of commercial-scale PGM production. Further metallurgical testing will therefore be important in determining whether the reported PGM content can translate into an economically recoverable product stream.
19 hours ago
Pan Global Reports Platinum-Palladium Mineralisation at Spain's Cármenes Project
20 hours ago
Pan Global Reports Platinum-Palladium Mineralisation at Spain's Cármenes Project
Read More
Pan Global Reports Platinum-Palladium Mineralisation at Spain's Cármenes Project
Pan Global Reports Platinum-Palladium Mineralisation at Spain's Cármenes Project
[SMM Flash] Pan Global Resources has reported additional drilling results from its 100%-owned Cármenes Project in northern Spain, identifying platinum and palladium within a broader gold-copper-nickel-cobalt mineralised system. Hole PVD15 intersected 15 m grading 3.90 g/t gold, 0.04% copper, 0.11% nickel and 0.12% cobalt from surface, including an 8 m interval grading 0.50 g/t platinum and 0.28 g/t palladium. Within this interval, one metre returned 1.39 g/t platinum and 0.74 g/t palladium, equivalent to 2.13 g/t Pt+Pd. The mineralisation extends beyond the historical Providencia mine workings and remains open along strike and at depth, according to the company. The results provide further evidence of PGM mineralisation within the Cármenes polymetallic system and could potentially add platinum and palladium credits to the project's mineral inventory. However, the reported intersections are exploration results and do not represent a Mineral Resource, reserve or future production estimate.
20 hours ago