SMM Evening Comments (Mar 11)

Published: Mar 11, 2019 17:15
SMM Evening Comments

SHANGHAI, Mar 11 (SMM) – SHFE base metals ended mixed on Monday March 11, as nickel fell nearly 0.7%, tin lost some 0.6%, lead closed flat, while copper nudged up, aluminium grew 0.2%, and zinc increased close to 1%. 

The ferrous complex declined across the board. Coke slid almost 3.7%, iron ore lost 3%, coking coal dipped 2.3%, rebar went down 1.6%, and hot-rolled coil closed 0.7% lower. 

Copper: The SHFE 1905 contract ceased five consecutive days of decline as it closed 0.08% higher at 49,190 yuan/mt. A stronger LME counterpart buoyed it in the afternoon to a high of 49,210 yuan/mt before closing. This followed after it lost support at the Bollinger middle band as shorts accumulated. Open interests grew 3,578 lots to 235,000 lots, with shorts accounted for the most. Tonight, we see the contract testing pressure at 49,200 yuan/mt. 

Aluminium: The SHFE 1905 contract hovered in a broad range in the morning, with an intraday low of 13,460 yuan/mt in early trades. A decline of some 9,000 mt in social inventories of primary aluminium over the weekend, as well as recovered consumption in the east, pulled the contract to a high of 13,535 yuan/mt near closing. It ended at 13,525 yuan/mt, with open interests up 7,046 lot to 313,442 lots. As confidence in longs improved, the contract is likely to test pressure at the 20-day moving average tonight. 

Zinc: The SHFE 1905 contract received support at the 40-day moving average as the first post-CNY decline in domestic inventories of refined zinc over the weekend of March 9-10 bolstered market confidence. The contract climbed to a high of 21,565 yuan/mt before closed at 21,540 yuan/mt. Open interests gained 2,238 lots to 219,000 lots, and longs accounted for most of the buildup. Tonight, the contract is expected to test pressure at the 10-day moving average. 

Nickel: With support from the 20-day moving average, the SHFE 1905 contract rebounded after dipped sharply below 102,000 yuan/mt. This came after it traded rangebound around the daily moving average, with a high of 102,920 yuan/mt. It closed at 102,250 yuan/mt, with open interests down 14,000 lots to 257,000 lots. As its KDJ indicators expanded downwards, the contract may continue to test support at the 20-day moving average tonight. 

Lead: The SHFE 1904 contract failed to reverse its downward trend along the five-day moving average, even as longs lifted it to highs around 17,555 yuan/mt in the afternoon. Support below at the 60-day moving average remained, and this ended the contract at 17,455 yuan/mt. Tonight, it is expected to trade within the five- and 60-day moving averages. 

Tin: The SHFE 1905 contract continued trading rangebound from last Friday night, and hovered above the daily moving average this morning. Pressure from shorts dragged it in the afternoon, to an intraday low of 146,710 yuan/mt. With resistance at the 60-day moving average, it closed at 146,900 yuan/mt, with open interests up 1,178 lots to 31,546 lots. The contract is expected to trade with pressure at 148,000 yuan/mt tonight. 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
3 hours ago
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
Read More
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
3 hours ago
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
7 hours ago
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
Read More
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
[SMM Flash] Greenland Mines has completed a 104.8-tonne bulk-sampling programme across seven sites at its Skaergaard palladium-platinum-gold project in East Greenland. The samples are being prepared for large-scale and pilot-scale metallurgical testwork at GTK Mintec in Finland, while the company continues engineering, processing, infrastructure and waste-management studies aimed at advancing the project's technical evaluation. Skaergaard's S-K 1300 resource currently comprises approximately 15.0 million oz PdEq Indicated and 17.49 million oz PdEq Inferred, according to Greenland Mines. The bulk-testing programme represents an important step in evaluating processing and recovery options for one of the larger undeveloped palladium-platinum-gold systems outside the major South African, Zimbabwean and Russian supply regions. However, the reported Mineral Resources are not Mineral Reserves and the latest programme does not constitute a development or commercial production decision.
7 hours ago
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
7 hours ago
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
Read More
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
[SMM Flash] Two Rivers, the South African PGM joint venture between African Rainbow Minerals and Impala Platinum, is advancing technical validation work for its Merensky project on the eastern limb of the Bushveld Complex. Early-works capital was approved during FY2026 to complete studies required to determine the project's way forward. The Merensky concentrator was commissioned during the six months to December 2024 but was subsequently placed on care and maintenance amid challenging PGM market conditions. The project has a stated capital cost of approximately R7.3 billion and is designed to produce around 182,000 6E PGM oz/year at steady state, alongside approximately 1,600 tonnes/year of nickel and 1,300 tonnes/year of copper. A restart could therefore provide meaningful incremental PGM supply from an existing South African operation. However, the project remains under technical validation and no restart date or final decision to resume production has been announced.
7 hours ago