China’s copper downstream contraction slows in Nov

Published: Dec 3, 2018 14:22
SMM's PMI for downstream copper rose to 48.24 in Nov, up from 46.64 in Oct

SHANGHAI, Dec 3 (SMM) –  China’s copper downstream industries contracted slower compared to a month earlier in November as production and new orders weakened at a slower pace.

SMM's purchasing managers’ index (PMI) across China’s copper downstream industries, released on Friday, rose to 48.24 for the month, beating previous expectations and up from 46.64 in October. The index stood below the 50-point mark that separates contraction from expansion for a sixth straight month as overall demand remained weak amid a cyclically low season.

The production sub-index climbed 4.07 month on month to 46.59 in November. Despite greater investment in the power and infrastructure sectors, consumption across automobile, home appliance and fixed assets remained sluggish, which suppressed production enthusiasm among producers.

A new orders sub-index, an indicator of future activity, grew to 48.88 in November, up 3.27 from a month ago.

Demand this year faced internal and external pressure. At home, the phasing out of purchase tax cuts on smaller engine cars eroded auto demand while home purchase restrictions bogged the property sector. Consumption across the home appliance sector was poorer than the previous year. Increasingly inclement weather limited construction across the north while construction sites in the south failed to step up rates even as the year draws to a close.

Higher tariffs amid the trade war with the US and a global economic slowdown weakened foreign orders.

In November, plants across China’s copper downstream industries paid less in purchasing raw materials with the sub-index for raw material purchasing prices down 1.24 to 49.63. SHFE copper went down from October.Widened price spreads between copper cathode and copper scrap drove buyers to the cheaper scrap materials, which also lowered spending in raw material procurement.

The sub-index for raw material stocks slid 5.44 month on month to 42.55 last month as tepid consumption, high spot premiums and pessimistic outlooks kept plants being cautious in stockpiling raw materials.

Losses on seaborne materials expanded in late November. This prompted copper smelters to step up export shipments, which shrank supplies to the domestic market and firmed spot premiums. Pessimism also triggered the destocking of finished goods inventory across China’s copper downstream industries.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Analysis] The "Counter-Cyclical" Logic of Copper Smelting: When Sulfuric Acid Becomes the Main Product
1 hour ago
[SMM Analysis] The "Counter-Cyclical" Logic of Copper Smelting: When Sulfuric Acid Becomes the Main Product
Read More
[SMM Analysis] The "Counter-Cyclical" Logic of Copper Smelting: When Sulfuric Acid Becomes the Main Product
[SMM Analysis] The "Counter-Cyclical" Logic of Copper Smelting: When Sulfuric Acid Becomes the Main Product
[SMM Analysis: The "Counter-Cyclical" Logic of Copper Smelting: When Sulfuric Acid Becomes the Main Product]
1 hour ago
BC Copper 2604 Closed Lower with a Wide Trading Range, Pressured by Both Geopolitics and Interest Rate Cut Expectations [SMM BC Copper Commentary]
2 hours ago
BC Copper 2604 Closed Lower with a Wide Trading Range, Pressured by Both Geopolitics and Interest Rate Cut Expectations [SMM BC Copper Commentary]
Read More
BC Copper 2604 Closed Lower with a Wide Trading Range, Pressured by Both Geopolitics and Interest Rate Cut Expectations [SMM BC Copper Commentary]
BC Copper 2604 Closed Lower with a Wide Trading Range, Pressured by Both Geopolitics and Interest Rate Cut Expectations [SMM BC Copper Commentary]
2 hours ago
Inner Mongolia Approves 500 kV Project, Boosting Ordos City's Power Grid in 14th Five-Year Plan
2 hours ago
Inner Mongolia Approves 500 kV Project, Boosting Ordos City's Power Grid in 14th Five-Year Plan
Read More
Inner Mongolia Approves 500 kV Project, Boosting Ordos City's Power Grid in 14th Five-Year Plan
Inner Mongolia Approves 500 kV Project, Boosting Ordos City's Power Grid in 14th Five-Year Plan
Recently, the 500 kV transmission and transformation project of Jiri (Kusha II) was officially approved by the Energy Bureau of Inner Mongolia Autonomous Region, marking a good start for the power grid construction of Ordos City in the first year of the 14th Five-Year Plan. The project is located in the territory of Hangjin Banner, with a total investment of 1.52554 billion yuan. It is a key hub project to ensure the output and consumption of new energy power in the northwestern region of Hangjin Banner. The project plans to build one 500 kV substation and about 194 km of 500 k V lines, which will pass through Hangjin Banner and Dalad Banner.
2 hours ago
China’s copper downstream contraction slows in Nov - Shanghai Metals Market (SMM)