Zinc social stocks in Shanghai down on week amid outflows, limited arrivals

Published: Nov 30, 2018 13:36 (GMT+8)
As of Friday Nov 30, social inventories of refined zinc in Shanghai stood at 43,000 mt, down 13,000 mt from Monday Nov 26

SHANGHAI, Nov 30 (SMM) – Social stocks of refined zinc in Shanghai lost some 13,000 mt, or 23.2%, between Monday and Friday as a closed import arbitrage window limited seaborne arrivals and as a six-day losing streak in SHFE zinc earlier in the week deterred domestic smelters from letting their cargoes go.

Price spreads between Shanghai and Guangdong widened to 230-300 yuan/mt this week, which prompted traders to move cargoes to Guangdong from Shanghai. This, together with strong purchasing enthusiasm among downstream consumers, also helped lower stocks in Shanghai.

As of Friday November 30, social inventories of refined zinc in Shanghai stood at 43,000 mt, down 13,000 mt from Monday November 26, SMM data showed.

During the same period, stocks in Guangdong decreased by 2,600 mt, or 23.4% to 8,500 mt as Shanghai cargoes have yet to arrive at warehouses or directly entered downstream consumers, which failed to offset the losses triggered by downstream purchases.

Brisk domestic arrivals and stable downstream purchases kept stocks in Tianjin steady. 

Social inventories of refined zinc across Shanghai, Guangdong and Tianjin came in at 111,000 mt as of Friday November 30, down 15,300 mt from Monday November 26 and 14,200 mt from Friday November 23, SMM data showed.

Inventories are likely to nudge up next week if purchasing interest among downstream consumers wanes from this week and if more seaborne materials arrive.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
1 hour ago
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Read More
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Coherent launched PhotonLink, an integrated optics platform for AI infrastructure incorporating Indium Phosphide (InP) lasers, silicon photonics, detectors and optical modules. The company disclosed more than 10 CPO engagements, over 10 NPO engagements and more than five chip-to-chip connectivity projects, with anchor customers and long-term agreements secured for both CPO and NPO. Revenue is expected to begin ramping in Q4 2026. Coherent has shipped over 300 million InP lasers and is expanding its 6-inch InP manufacturing capacity to support the ramp. The customer pipeline provides a clearer commercial demand signal for InP devices and upstream materials, although additional capacity and indium consumption were not disclosed.
1 hour ago
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
5 hours ago
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Read More
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Minerals announced that JDS Energy & Mining had completed a preliminary underground inspection at its wholly owned Talisman project in Washington State. No immediate impediment to safe re-entry was identified, and mineralization including sphalerite was observed near the portal and adit. More than 200 soil samples await results. Significant underground work still requires detailed geotechnical assessment, support design and stope inspection. Mineral observations do not establish grade, continuity, tonnage or economic potential.
5 hours ago
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
5 hours ago
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Read More
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Windfall Geotek announced renewal of 592 hectares of claims in Canada’s Bathurst Mining Camp. Zinc targets at Upper Sprig Brook were generated using an AI model trained on zinc-copper assays from seven local volcanogenic massive sulphide deposits. The company plans historical-data compilation and rock or soil sampling to advance target validation and subsequent drill targeting. No new drilling assays or mineral resource estimate were announced.
5 hours ago