Macro Roundup (Nov 30)

Published: Nov 30, 2018 09:18
A roundup of global macroeconomic news last night and what is expected today

SHANGHAI, Nov 30 (SMM) – This is a roundup of global macroeconomic news last night and what is expected today.

Last night

The US dollar recovered but remained under 97 as concerns before the G20 meeting prompted investors to buy back the currency. Comments by the Federal Reserve chief were seen as a signal that a rising trend in interest rates may end, and this also supported the greenback. 

At the G20 summit in Buenos Aires on Friday and Saturday, the US President Donald Trump and China President Xi Jinping are scheduled to discuss trade issues after months of tension between the world's two biggest economies. 

The pound fell against the US dollar on concerns about the UK parliament's vote on Brexit and after the Bank of England warned of risks to the currency in the event of a no-deal, disorderly Brexit.

Base metals closed mixed as SHFE nickel led the increase and jumped 1.47%. LME nickel grew 1.33%, tin gained 0.79%, lead increased 0.31%, while copper fell 0.74%, zinc and aluminium inched down. SHFE base metals, except for aluminium, rose across the board. 

German annual inflation accelerated slower than expected in November but stayed well above the European Central Bank's (ECB) target. 

Germany's consumer price index (CPI) for November was 2.3% compared to last year’s 2.5%, with an expectation of it only falling to 2.4% on an annualised basis. The CPI edged up 0.1% month on month in November, compared to an expected price growth of 0.2%. 

The ECB expects an inflation rate slightly below 2% for the single-currency bloc.

The US weekly jobless claims increased to a six-month high last week, which raised concerns that the labour market could be slowing.

Initial claims for state unemployment benefits rose 10,000 to a seasonally adjusted 234,000 for the week ended November 24, the highest level since mid-May, the Labor Department said on Thursday. This marked the third straight week of increase. 

The claims data included Thanksgiving Day on Thursday, claims tend to be volatile around holidays. 

The four-week moving average of initial claims, considered a better measure of labour market trends as it irons out week-to-week volatility, increased 4,750 to 223,250 last week. Its jobless rate is at a near 49-year low of 3.7%. The labour market is viewed as being near or at full employment.

US consumer spending rose by the most in seven months in October, but underlying price pressures slowed, with an inflation measure tracked by the Federal Reserve registering its smallest annual increase since February.

Consumer spending rose 0.6% in October, the Commerce Department said on Thursday. This beat expectations of 0.4%.

The personal consumption expenditures (PCE) price index excluding the volatile food and energy components edged up 0.1% after rising 0.2% in September.

That lowered the year-on-year increase in the so-called core PCE price index to 1.8%, the lowest reading since February, from 1.9% in September. The core PCE index is the Fed's preferred gauge of inflation.

Day ahead

Economic data slated for release today include China’s official manufacturing purchasing managers index (PMI), Germany’s retail sales for October, and the eurozone’s consumer price index (CPI) for November. The G20 summit begins today in Argentina.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
7 hours ago
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
Read More
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
7 hours ago
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
10 hours ago
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
Read More
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
[SMM Flash] Greenland Mines has completed a 104.8-tonne bulk-sampling programme across seven sites at its Skaergaard palladium-platinum-gold project in East Greenland. The samples are being prepared for large-scale and pilot-scale metallurgical testwork at GTK Mintec in Finland, while the company continues engineering, processing, infrastructure and waste-management studies aimed at advancing the project's technical evaluation. Skaergaard's S-K 1300 resource currently comprises approximately 15.0 million oz PdEq Indicated and 17.49 million oz PdEq Inferred, according to Greenland Mines. The bulk-testing programme represents an important step in evaluating processing and recovery options for one of the larger undeveloped palladium-platinum-gold systems outside the major South African, Zimbabwean and Russian supply regions. However, the reported Mineral Resources are not Mineral Reserves and the latest programme does not constitute a development or commercial production decision.
10 hours ago
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
10 hours ago
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
Read More
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
[SMM Flash] Two Rivers, the South African PGM joint venture between African Rainbow Minerals and Impala Platinum, is advancing technical validation work for its Merensky project on the eastern limb of the Bushveld Complex. Early-works capital was approved during FY2026 to complete studies required to determine the project's way forward. The Merensky concentrator was commissioned during the six months to December 2024 but was subsequently placed on care and maintenance amid challenging PGM market conditions. The project has a stated capital cost of approximately R7.3 billion and is designed to produce around 182,000 6E PGM oz/year at steady state, alongside approximately 1,600 tonnes/year of nickel and 1,300 tonnes/year of copper. A restart could therefore provide meaningful incremental PGM supply from an existing South African operation. However, the project remains under technical validation and no restart date or final decision to resume production has been announced.
10 hours ago