SMM Morning Comments (Nov 26)

Published: Nov 26, 2018 10:18
SMM Morning Comments

SHANGHAI, Nov 26 (SMM) – 

Copper: LME copper dipped below the five-day moving average to the Bollinger middle band, pressured by a higher US dollar and lower prices of US crude oil. It closed at $6,168/mt, with resistance at the daily moving average. The SHFE 1901 contract also faced pressure above at 49,370 yuan/mt. It settled at 49,360 yuan/mt after it rose to a high of 49,450 yuan/mt. We expect it to trade weakly at 49,100-49,500 yuan/mt, with its LME counterpart trading at $6,140-6,190/mt today. Spot sellers will continue to firm up premiums to 60-130 yuan/mt today. 

Aluminium: As longs left the market, the SHFE 1901 contract declined below the five-day moving average to a low of 13,735 yuan/mt last Friday night. Sluggish demand and weaker support from lower prices of alumina saw the contract face heavy pressure at the 20-day moving average. It will trade at 13,750-13,850 yuan/mt today with spot discounts at 50-10 yuan/mtLower prices of oil and weaker macro sentiment lowered LME aluminium 0.33% lower on the day at $1,942/mt. It is likely to hover around the five- and 10-day moving averages, and test support at the 10-day moving average today. 

Zinc: LME zinc slumped below all moving averages last Friday night as slower-than-expected growth in eurozone economic data grew bearish market sentiment. As pessimism eases today, LME zinc is expected to trade at $2,490-2,540/mt. The SHFE 1901 contract registered the fifth consecutive trading day of decline as it closed 1.32% lower after it fell to a month-low of 20,335 yuan/mt. It is likely to cease falling and trade at 20,350-20,850 yuan/mt today. 

Nickel: Macroeconomic pessimism lowered LME nickel last Friday night to $10,875/mt, with support at the $10,740/mt level. While base metals fell for the most part on a higher US dollar, the SHFE 1901 contract rebounded after it dipped below 90,000 yuan/mt. It closed 1.11% higher at 90,100 yuan/mt, with open interests down 38,000 lots to 330,000 lots. We expect LME nickel to hover weakly around $10,800/mt, with the 1901 contract trading at 88,000-90,000 yuan/mt today. Spot prices are seen at 89,000-100,000 yuan/mt today.

Lead: LME lead rebounded after it dipped to a low of $1,947/mt as the US dollar gained. It will continue to trade weakly, rangebound in the short run. The SHFE 1901 contact stopped declining near closing and broke pressure at the daily moving average, closing at 18,320 yuan/mt, down 0.68% on the day. It is likely to extend the rise today, with limited downward room. 

Tin: A pessimistic outlook on tin demand in China and a stronger US dollar weighed on LME tin, which closed at a three-month low of $18,520/mt, down 3.89% on the day. On Friday November 23, the International Tin Association reported that poor demand in China is likely to account for an oversupply of up to 500 mt in 2019. LME tin pulled the SHFE 1901 contract to a low of 144,210 yuan/mt. It may test the 142,500 yuan/mt level if it failed to receive support at 145,000 yuan/mt today. 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
Sep 12, 2026 16:51
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
Read More
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
At 9:58 on September 12, the core smelting furnace of the pyrometallurgy system at Yingkou Jianfa Shenghai Nonferrous Metals & Chemicals Co., Ltd.'s multi-metal recovery project was successfully ignited, officially entering the furnace drying stage and marking a key step toward full-line commissioning and production. Public information shows that the Yingkou Jianfa Shenghai polymetallic complex gold-silver ore comprehensive recovery technology upgrade, relocation, and expansion project uses copper concentrates as its main raw material, with an overall planned capacity of 600,000 mt/year of copper cathode to be built in two phases, with capacity of 300,000 mt/year in each phase. Phase I is designed to produce 300,000 mt/year of copper cathode and 1.18 million mt/year of sulphuric acid, along with supporting systems for smelting, converting, anode refining, electrolysis, slag beneficiation, and precious metal recovery. After this ignition, the project will carry out standardized furnace drying and hot-state integrated trial runs across the entire system to verify equipment, instruments, interlocks, and automatic control systems. The project has not yet formally started raw material feeding and production; after furnace drying and system commissioning are completed, it will further advance the commissioning of Phase I's 300,000 mt/year copper cathode capacity. If the project is successfully brought into production, it is expected to increase copper smelting capacity in North China and further boost domestic demand for copper concentrate raw materials.
Sep 12, 2026 16:51
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Sep 12, 2026 01:13
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Read More
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Alchemy Resources announced on September 11 that reverse-circulation drilling has commenced across its Yellow Mountain and Overflow projects in New South Wales, Australia, with up to 15 holes planned during the latest exploration campaign.​ At the 80%-owned Yellow Mountain project, drilling will test extensions to previously identified copper-gold and polymetallic mineralisation, as well as two previously undrilled geophysical targets.​ Previous drilling at Yellow Mountain returned an intersection of 113 metres grading 1.17% copper equivalent, comprising 0.33% copper, 0.37 g/t gold, 24.3 g/t silver, 0.86% lead and 1.23% zinc. The latest drilling campaign is designed to test whether the known mineralised system extends into newly identified target areas.​ The program will also include drilling at the Overflow project, where Alchemy is targeting extensions to existing mineralisation along strike and at depth. Overflow currently hosts an inferred mineral resource of approximately 342,000 ounces of gold equivalent and contains gold, silver, copper, lead and zinc mineralisation.​ The commencement of drilling provides a near-term test of the scale and continuity of mineralisation at Yellow Mountain. The previously reported broad copper-gold-polymetallic intersection indicates potential for a sizeable mineralised system, while the newly defined geophysical targets provide additional exploration upside. Drilling results will be important in determining whether the mineralised footprint can be materially expanded.
Sep 12, 2026 01:13
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Sep 12, 2026 01:10
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Read More
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Freeport-McMoRan Chief Executive Officer Kathleen Quirk has indicated that the company expects to move forward with the proposed expansion of its Bagdad copper mine in Arizona, marking a stronger commitment to the project ahead of a formal investment decision. Speaking at the Jefferies Global Industrials Conference on September 10, Quirk said the project still requires input from Freeport's board but that she expects the company will proceed. She described the expansion as a roughly three-year construction project and noted that no major permitting hurdles are expected. Freeport's latest project estimates put capital expenditure for the Bagdad expansion at approximately US$4.5 billion, around 30% above the previous US$3.5 billion estimate, reflecting cost escalation, scope changes and additional engineering. The project would more than double concentrator capacity at Bagdad and is expected to add approximately 200–250 million lb, or around 91,000–113,000 tonnes, of copper production annually, alongside an additional 10–12 million lb of molybdenum. Bagdad currently has a reserve life exceeding 80 years. Freeport's Q2 2026 regulatory filing had described the project as being prepared for a potential investment decision during the second half of 2026. The latest comments therefore represent a more positive signal from management on the likelihood of development, although formal board approval has not yet been announced. A decision to proceed with Bagdad would represent one of Freeport's most significant near-term copper growth investments in the US. The potential addition of more than 90,000 tonnes per year of copper would materially increase Freeport's US output, although first production would remain several years away given the expected construction period. Attention will now turn to formal board approval and a final investment decision.
Sep 12, 2026 01:10