Copper scrap consumption increases 15.8% in Oct

Published: Nov 23, 2018 16:29 (GMT+8)
China's copper smelters and processors consumed some 208,200 mt of copper scrap in Oct

SHANGHAI, Nov 23 (SMM) – China's copper smelters and processors consumed some 208,200 mt of copper scrap in October, up 28,300 mt, or 15.76% from September, an SMM research found.  

Among this, consumption of domestic copper scrap accounted for 49%, and imports 51% or 105,200 mt, according to the research. 

Some 48% of the copper scrap was consumed by domestic smelters, while the rest 52%, or 107,800 mt, was used by processing plants. Among those downstream processors, copper rod plants consumed some 60% of the scrap supplies in the processing sector. 

After the National Day holiday in early October, higher prices of refined copper widened its price spread with scrap materials, and this boosted consumption of copper scrap.

Operation rates across scrap-using rod producers rose by 11.17 percentage points from September, to 61.54% in October. Those mills consumed some 77,300 mt of copper scrap last month, up 16,400 mt from September, SMM surveyed. 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Selkirk Copper Intersects 9.3% Cu Over 5.4 Metres at Minto North
1 hour ago
Selkirk Copper Intersects 9.3% Cu Over 5.4 Metres at Minto North
Read More
Selkirk Copper Intersects 9.3% Cu Over 5.4 Metres at Minto North
Selkirk Copper Intersects 9.3% Cu Over 5.4 Metres at Minto North
Selkirk Copper Mines has reported additional high-grade drill results from its ongoing Phase 2 programme at the Minto copper-gold-silver project in Yukon, Canada, including one of the highest-grade intersections recorded at the property.​ Step-out drilling at Minto North returned 9.27% copper, 7.43 g/t gold and 54.9 g/t silver, equivalent to 15.11% copper-equivalent, over 5.4 metres in drill hole 26SCM209. The same hole also intersected a separate 9.0-metre interval grading 0.97% copper, 2.58 g/t gold and 8.4 g/t silver, equivalent to 3.11% CuEq.​ Selkirk said the 5.4-metre interval ranks within the 99th percentile of more than 4,300 significant historical drill intercepts at Minto. Individual one-metre samples within the interval returned peak grades of up to 17.5% copper, 15.9 g/t gold and 81.9 g/t silver.​ The company also reported additional mineralisation from Area 118, Minto Main and Copper Keel. At Area 118, infill drilling intersected 2.54% copper, 1.25 g/t gold and 10.7 g/t silver over 3 metres, while another hole returned 1.61% copper, 0.59 g/t gold and 8.3 g/t silver over 6.9 metres.​ Selkirk's Phase 2 programme had originally targeted 50,000 metres of drilling. As of September 28, the company had completed 52,485 metres in 224 drill holes, equivalent to 105% of the planned meterage. Drilling is expected to continue until mid-October, with the remaining work focused on geotechnical data collection, water-monitoring wells and exploration of newly identified geophysical targets.​ The latest Minto North results further demonstrate the presence of high-grade copper-gold-silver mineralisation within areas relevant to Selkirk's planned restart strategy. The 5.4-metre interval is particularly notable because it ranks among the highest-grade intersections historically drilled at Minto. However, these are exploration results rather than additions to the current Mineral Resource Estimate. Attention will therefore remain on how the Phase 2 drilling is incorporated into future resource modelling and feasibility-level mine planning for the proposed restart of the Minto operation.
1 hour ago
Panama Commission to Recommend Cobre Panama Restart Through State Partnership
1 hour ago
Panama Commission to Recommend Cobre Panama Restart Through State Partnership
Read More
Panama Commission to Recommend Cobre Panama Restart Through State Partnership
Panama Commission to Recommend Cobre Panama Restart Through State Partnership
A Panamanian government commission is expected to recommend restarting the suspended Cobre Panama copper mine through a state partnership with First Quantum Minerals, according to Reuters, citing two sources familiar with the matter.​ The commission is set to formally submit its recommendation to President José Raúl Mulino, who will make the final decision on whether and how the mine could restart. The proposed structure would involve a joint venture between the Panamanian state and First Quantum, although a final agreement with the miner would still need to be negotiated.​ Cobre Panama has remained suspended since 2023 after widespread public opposition over environmental and governance concerns, followed by a Supreme Court ruling that declared the mine's operating contract unconstitutional.​ The operation had accounted for around 1% of global copper production before it was idled and was previously First Quantum Minerals' largest revenue-generating asset, contributing around 40% of the company's revenue.​ According to foreign media reports, the Panamanian government has been weighing the economic importance of the mine against continuing public concerns over environmental oversight and the distribution of economic benefits. A government study published earlier in September estimated that the mine's closure had resulted in the loss of more than 30,000 jobs and reduced taxes and royalties to the state by nearly US$1.4 billion.​ Foreign media previously reported that Panama was considering a model under which the mine's underlying concession would remain with the state while First Quantum retained operational control. A 60–65% stake for First Quantum had also been discussed, although it remains unclear whether those terms are part of the current proposal.​ A formal recommendation to restart Cobre Panama would represent a significant step toward potentially returning one of the world's largest copper mines to production. However, the restart remains uncertain because President Mulino has not yet made a final decision, a joint-venture agreement with First Quantum has not been reached, and the legal structure of any new operating arrangement would still need to address Panama's current restrictions on new mining concessions. Given Cobre Panama's previous contribution of around 1% of global copper supply, any credible pathway toward a restart will remain closely watched by the copper market.
1 hour ago
Amazon Invests $1.59B in Taiwan AI Server PCB Maker GCE, Secures Strategic Stake Amid Expansion
2 hours ago
Amazon Invests $1.59B in Taiwan AI Server PCB Maker GCE, Secures Strategic Stake Amid Expansion
Read More
Amazon Invests $1.59B in Taiwan AI Server PCB Maker GCE, Secures Strategic Stake Amid Expansion
Amazon Invests $1.59B in Taiwan AI Server PCB Maker GCE, Secures Strategic Stake Amid Expansion
Taiwan AI server PCB maker Gold Circuit Electronics announced on September 29 that Amazon will join a private placement as a strategic investor, subscribing 1,856,308 new shares at NT$856 per share, or about NT$1.59 billion, with the shares locked up for three years. The subscription price equals 80 percent of the NT$1,070 reference price. GCE already supplies main boards for AWS Trainium AI servers, and Trainium 3 is expected to enter mass production in the third quarter of 2026, with AWS-related shipments ramping from that quarter. The same day, the board approved NT$7.9 billion for a new plant, comprising about NT$3.8 billion for land and NT$4.1 billion for buildings and equipment, to be deployed from the fourth quarter of 2026 and funded by unsecured convertible bonds. GCE is expanding in Taiwan, Suzhou, Changshu and Thailand, has raised its 2026 capital expenditure to NT$19 billion, and says high-end AI board capacity still cannot fully meet customer demand; the cloud provider's equity stake should help secure new plant capacity ahead of demand.
2 hours ago