SMM Evening Comments (Nov 8)

Published: Nov 8, 2018 18:48
SMM Evening Comments

SHANGHAI, Nov 8 (SMM) – SHFE nonferrous metals finished the trading day in mixed performance on Thursday. Tin gained over 1%, aluminium and lead increased by some 0.5% while copper dipped 0.26%, nickel slid 0.6% and zinc lost close to 0.7%.

The ferrous complex also closed mixed with the best performance from iron ore, up 2.16% on the day. Rebar climbed close to 1.2%, coking coal nudged up 0.07% while hot-rolled coil edged down 0.03% and coke slipped 0.55%.

Copper: The SHFE 1901 contract fluctuated to post a four-day losing streak today. It stood firmly above the 40-day moving average even as it fell near the 10-day moving average. Market participants should monitor if the contract extends its decline to the 40-day moving average tonight.

Aluminium: As longs added and shorts cut their positions, the SHFE 1901 contract initially extended overnight gains. With pressure at 14,000 yuan/mt, the contract reversed its direction and lost some earlier gains to end at 13,945 yuan/mt. Its KDJ lines diverged and expanded upwards while the MACD green line shortened. The market received some support from the news that Brazil court upheld partial shutdown at Hydro Alunorte alumina refinery. But the contract appeared to run out of steam after hitting the 14,000 yuan/mt level. We expect the contract to test the 10-day moving average tonight.

Zinc: The SHFE 1901 contract fluctuated in negative territory today and closed at 20,780 yuan/mt. It fell below the 60-day moving average and the five-day moving average expanded downwards past the 40-day moving average, reflecting the recent weak performance in SHFE zinc. We expect limited downside room for SHFE zinc as social inventories did not expand significantly. The SHFE 1901 contract is likely to trade rangebound around the 60-day moving average tonight.

Nickel: An aggressive buildup of short positions dragged the SHFE 1901 contract to a low of 95,600 yuan/mt before it recovered all losses as shorts covered their positions. But the rebound failed to push the contract to close in the black today. The KDJ lines diverged and expanded upwards while the MACD green line shortened. Market participants should monitor if the contract stands firmly above the 96,000 yuan/mt level tonight.

Lead: As longs added and shorts cut their positions, the SHFE 1812 contract rebounded from a low of 18,355 yuan/mt to finish the trading day higher at 18,465 yuan/mt. The contract stemmed its four-day losing streak today but pressure remains at 18,500 yuan/mt. The contract is expected to test the pressure at the 10-day moving average tonight.

Tin: Short-covering boosted a sharp gain in the SHFE 1901 contract shortly after the opening bell. By closing, the contract extended its gains to end at 147,660 yuan/mt. Today, the contract shrugged off resistance at several moving averages, bolstered by tightening tin ore supplies. SHFE tin is likely to strengthen in the short run with resistance at 149,000 yuan/mt.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
3 hours ago
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
Read More
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
3 hours ago
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
6 hours ago
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
Read More
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
[SMM Flash] Greenland Mines has completed a 104.8-tonne bulk-sampling programme across seven sites at its Skaergaard palladium-platinum-gold project in East Greenland. The samples are being prepared for large-scale and pilot-scale metallurgical testwork at GTK Mintec in Finland, while the company continues engineering, processing, infrastructure and waste-management studies aimed at advancing the project's technical evaluation. Skaergaard's S-K 1300 resource currently comprises approximately 15.0 million oz PdEq Indicated and 17.49 million oz PdEq Inferred, according to Greenland Mines. The bulk-testing programme represents an important step in evaluating processing and recovery options for one of the larger undeveloped palladium-platinum-gold systems outside the major South African, Zimbabwean and Russian supply regions. However, the reported Mineral Resources are not Mineral Reserves and the latest programme does not constitute a development or commercial production decision.
6 hours ago
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
6 hours ago
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
Read More
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
[SMM Flash] Two Rivers, the South African PGM joint venture between African Rainbow Minerals and Impala Platinum, is advancing technical validation work for its Merensky project on the eastern limb of the Bushveld Complex. Early-works capital was approved during FY2026 to complete studies required to determine the project's way forward. The Merensky concentrator was commissioned during the six months to December 2024 but was subsequently placed on care and maintenance amid challenging PGM market conditions. The project has a stated capital cost of approximately R7.3 billion and is designed to produce around 182,000 6E PGM oz/year at steady state, alongside approximately 1,600 tonnes/year of nickel and 1,300 tonnes/year of copper. A restart could therefore provide meaningful incremental PGM supply from an existing South African operation. However, the project remains under technical validation and no restart date or final decision to resume production has been announced.
6 hours ago