SMM Morning Comments (Oct 8)

Published: Oct 08, 2018 09:42 (GMT+8)
SMM Morning Comments

SHANGHAI, Oct 8 (SMM) –

Copper: LME copper lost 0.67% to end at $6,186.5/mt on Friday. SHFE copper faces pressure from a strong US dollar and firm USeconomy. The recent US-Mexico-Canada Agreement will also put China’s exports under pressure. China’s central bank, however, provided some support. The reserve requirement ratios (RRRs) cut of 100 basis points announced on Sunday is set to bolster the stock market and grow anticipation of investment growth in infrastructure construction in the fourth quarter of the year. We expect LME copper to trade at $6,140-6,210/mt today with the SHFE 1811 contract at 49,000-50,100 yuan/mt. Spot premiums are seen at 20-70 yuan/mt as traders might clean up their stocks and downstream consumers would restock after the week-long break.

Aluminium: LME aluminium lost all its previous gains and settled at $2,105/mt last Friday night after Hydro said that it obtained a key tech permit for its alumina refinery Alunorte in Brazil and plans to restart operations. LME aluminium is also expected to face pressure from a strong US dollar on robust economic data. Its trading range is set at $2,080-2,140/mt today, with the SHFE 1811 contract trading at 14,200-14,500 yuan/mt. Spot offers are likely up to a maximum of 30 yuan/mt today.

Zinc: Last week, LME zinc came off after hitting a high of $2,728/mt with steady movements in the short-term moving average. We expect it to consolidate at $2,600-2,650/mt today. Gains in LME zinc may provide some support to its SHFE counterpart today after the nine-day closure of the Shanghai market. SHFE zinc is unlikely to fall in the short term given sufficient ore supplies and tight refined material supplies, but output during the break may also limit upward momentum in the futures. The SHFE 1811 contract is likely to trade at 21,850-22,350 yuan/mt.

Nickel: Last week, LME fell after it gained 3% on Wednesday with resistance at the 40-day moving average and support at $12,000/mt. Stocks across LME inventories continued to decline but on a smaller scale. We expect LME nickel to hover around $12,600/mt today with the SHFE 1811 contract trading at 103,500-105,000 yuan/mt. Spot prices are seen at 103,500-110,000 yuan/mt.

Lead: LME lead continued its weak performance last week and registered a three-day losing streak. Pressure remained at the moving averages. It is unlikely to strengthen in the near term without momentum. Market participants should monitor the $2,000/mt level.

Tin: LME tin held relatively steady last week and is expected to continue its rangebound pattern in the short term. For SHFE tin, resistance is seen at 150,000 yuan/mt for the 1901 contract.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
12 hours ago
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
Read More
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 have broken ground on a fourth grinding line at the Sierra Gorda copper-molybdenum mine in Chile's Atacama region. The US$725 million expansion runs for three years from January 2027, with completion by late 2029 and full output in H2 2030. Ore processing capacity rises 26%, from 131,000 tonnes per day to 165,000 tpd. Annual copper output is projected to climb from 165,000 tonnes in 2025 to 195,000 tonnes, with 6,000 tonnes of molybdenum, 58,000 ounces of gold and 1.7 million ounces of silver as by-products. The project creates over 900 direct jobs and is funded from operating cash flow and debt. Unit operating costs are expected to fall about 10%.
12 hours ago
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
13 hours ago
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Read More
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Resources has provided an update on the Preliminary Feasibility Study (PFS) for its Iberian Belt West polymetallic project in Spain, saying the study is well advanced but remains under final technical review.​ The company said the review process has been expanded to include additional technical and quality-assurance oversight before publication. As a result, Emerita now expects the PFS to be released in the coming weeks rather than within the previously indicated timeframe.​ Iberian Belt West hosts copper, zinc, lead, gold and silver mineralization and is one of Emerita’s principal development-stage assets in Spain. The PFS is expected to provide updated detail on the proposed mine plan, processing configuration, capital requirements, operating costs and project economics.​ Emerita said the additional review work is intended to ensure consistency and completeness across the technical disciplines contributing to the study before it is finalized.​ The company did not announce a revised specific publication date, and no new production, capital or economic figures were disclosed in the latest update.​ The extended review delays the next major technical milestone for Iberian Belt West, but the company continues to indicate that the PFS is nearing completion. For the copper market, the significance of the study will depend on the production profile and project economics ultimately disclosed, particularly the contribution of copper relative to the project’s other payable metals. Attention will therefore remain on the timing of the PFS release and whether the final study materially changes the project’s development outlook.
13 hours ago
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
13 hours ago
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Read More
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Minerals has reported additional drill results from its 2026 exploration programme at the Carmacks copper-gold project in Yukon, Canada, with new step-out drilling extending mineralization at Zone 2000S beyond the boundaries of the existing Mineral Resource.​ Drill hole CD-26-058 returned 75.55 metres grading 1.19% copper, 0.97 g/t gold, 10.4 g/t silver and 335 ppm molybdenum, equivalent to 2.18% copper-equivalent. The interval included 48.66 metres grading 1.61% copper, 1.39 g/t gold, 15.1 g/t silver and 475 ppm molybdenum, equivalent to 3.03% CuEq.​ Within the same hole, a higher-grade interval of 14.50 metres returned 2.30% copper, 2.68 g/t gold, 29.5 g/t silver and 1,015 ppm molybdenum, equivalent to 5.08% CuEq.​ A second hole, CD-26-059, intersected 93.99 metres grading 0.96% copper, 0.70 g/t gold, 4.6 g/t silver and 919 ppm molybdenum, equivalent to 1.94% CuEq. This included 63.97 metres at 1.26% copper, 0.96 g/t gold, 6.3 g/t silver and 1,049 ppm molybdenum, equivalent to 2.52% CuEq.​ Cascadia said the latest results continue to expand mineralization at Zone 2000S beyond the limits of the current Mineral Resource and highlight the higher-grade nature of the extension. The reported drill intervals represent drilled thicknesses, with true widths estimated at approximately 60–70%.​ The latest step-out results indicate that copper-gold mineralization at Zone 2000S extends beyond the boundaries of the current Carmacks Mineral Resource. The broad intervals and higher-grade internal zones could support future resource expansion if additional drilling confirms continuity. However, the new intersections have not yet been incorporated into an updated Mineral Resource Estimate, meaning their ultimate impact on project scale and mine planning remains to be determined.
13 hours ago
SMM Morning Comments (Oct 8) - Shanghai Metals Market (SMM)