Iron ore shipments leaving Brazil to grow further

Published: Sep 26, 2018 10:45
Sixty-three vessels carrying 9.51 million mt of iron ore are expected to arrive at major Chinese ports during Sep 21-27

SHANGHAI, Sep 26 (SMM) – Sixty-three vessels carrying 9.51 million mt of iron ore are expected to arrive at major Chinese ports during September 21-27, down 350,000 mt from 9.86 million mt during September 14-20, SMM data showed.

For the same period, iron ore shipments departing Australian ports are likely to dip by 60,000 mt to stand at 15.95 million mt while those leaving Brazilian ports are likely to grow 590,000 mt to 7.88 million mt.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Bank of Jiujiang Hefei Branch Approves 280M Yuan Credit Line for Anhui Lukong Environmental Protection
9 hours ago
Bank of Jiujiang Hefei Branch Approves 280M Yuan Credit Line for Anhui Lukong Environmental Protection
Read More
Bank of Jiujiang Hefei Branch Approves 280M Yuan Credit Line for Anhui Lukong Environmental Protection
Bank of Jiujiang Hefei Branch Approves 280M Yuan Credit Line for Anhui Lukong Environmental Protection
[Secondary Lead Market Update] It was reported that recently, the Hefei Branch of Bank of Jiujiang, in response to the characteristics of the secondary lead industry — "capital-intensive raw material procurement and urgent production turnover needs" — assembled a professional team and customized a comprehensive financial service plan, ultimately approving a credit line of 280 million yuan for Anhui Lukong Environmental Protection Co., Ltd.
9 hours ago
JISCO Unveils China's First Zinc-Aluminum-Magnesium Product After Six Years of Research
17 hours ago
JISCO Unveils China's First Zinc-Aluminum-Magnesium Product After Six Years of Research
Read More
JISCO Unveils China's First Zinc-Aluminum-Magnesium Product After Six Years of Research
JISCO Unveils China's First Zinc-Aluminum-Magnesium Product After Six Years of Research
According to China News Service, on April 16, at the plant of Jiuquan Iron and Steel (Group) Co., Ltd. in Jiayuguan City, Gansu Province, automated equipment was producing a new generation of zinc-aluminum-magnesium products. It was reported that the group assembled a specialized team to tackle zinc-aluminum-magnesium technology. Against the backdrop of formidable external technical barriers and the absence of batch production track records in China, the team spent six years of intensive efforts to produce China's first coil of zinc-aluminum-magnesium products with proprietary intellectual property rights. At the end of 2025, JISCO's new generation of zinc-aluminum-magnesium products was unveiled. This product category represents the most technically challenging variety in the hot-dip galv
17 hours ago
Indonesian Ministry Approves Environmental Feasibility for Dari Lead-Zinc Mine Project
Apr 8, 2026 11:12
Indonesian Ministry Approves Environmental Feasibility for Dari Lead-Zinc Mine Project
Read More
Indonesian Ministry Approves Environmental Feasibility for Dari Lead-Zinc Mine Project
Indonesian Ministry Approves Environmental Feasibility for Dari Lead-Zinc Mine Project
According to an announcement by NFC, on April 2, 2026, Zhongse Indonesia Dari Mining Co., Ltd., a holding subsidiary of China Nonferrous Metal Industry's Foreign Engineering and Construction Co., Ltd., obtained the "Environmental Feasibility Decision (SKKL) on Mining Activities of Lead-Zinc Ore by Dari Mining in SilimaPungga-Pungga Township, Dari County, North Sumatra Province" issued by the Ministry of Environment of the Republic of Indonesia. According to NFC's disclosure, the mine is an underground mine with a designed capacity of 1 million mt/year. As of 2024, the total resources/reserves of the Dari lead-zinc mine were: ore volume of 20.7009 million mt, zinc metal content of 2.2562 million mt, lead metal content of 1.3203 million mt, with an average zinc grade of 10.90% and an average
Apr 8, 2026 11:12