Spot copper premiums jump on brisk trades

Published: Aug 29, 2018 15:49 (GMT+8)
Spot copper was mostly offered at a premium of 90-140 yuan/mt over the SHFE 1809 contract in Shanghai on Wed Aug 29

SHANGHAI, Aug 29 (SMM) – Spot copper was mostly offered at a premium of 90-140 yuan/mt over the SHFE 1809 contract in Shanghai on Wednesday August 29. This compared with a premium of 30-90 yuan/mt on August 28.

Brisk trades prompted traders to raise premiums of standard-quality copper from 90 yuan/mt early in the morning, to above 100 yuan/mt at 10:00 CST, and to raise premiums of high-quality products from around 100 yuan/mt to 130-140 yuan/mt. 

While downstream consumers hesitated over such spot premiums when prices of futures surged after 11:00 CST, sellers lowered premiums to levels in the early morning, SMM learned. 

Hydro-copper, offered flat to a premium of 40 yuan/mt over SHFE 1809 contract, saw much interest. 

The SHFE 1809 contract broke pressure at the 40-day moving average, and stood above 49,000 yuan/mt after 11:00 CST. It closed at 49,070 yuan/mt at the end of the morning trading session, up 500 yuan/mt from that time on Tuesday.

At noon, high-grade copper traded at 49,020-49,140 yuan/mt and standard-quality copper traded at 49,000-49,120 yuan/mt.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
SHFE: Approves Jinchuan Group Co., Ltd. to increase the registered production site for “JNMC” brand Grade A copper (permanent cathode-K)
2 hours ago
SHFE: Approves Jinchuan Group Co., Ltd. to increase the registered production site for “JNMC” brand Grade A copper (permanent cathode-K)
Read More
SHFE: Approves Jinchuan Group Co., Ltd. to increase the registered production site for “JNMC” brand Grade A copper (permanent cathode-K)
SHFE: Approves Jinchuan Group Co., Ltd. to increase the registered production site for “JNMC” brand Grade A copper (permanent cathode-K)
2 hours ago
[SMM Announcement] Chinese Market Metal Prices and News Updates Suspended during National Day Holiday (Oct 1-7)
3 hours ago
[SMM Announcement] Chinese Market Metal Prices and News Updates Suspended during National Day Holiday (Oct 1-7)
Read More
[SMM Announcement] Chinese Market Metal Prices and News Updates Suspended during National Day Holiday (Oct 1-7)
[SMM Announcement] Chinese Market Metal Prices and News Updates Suspended during National Day Holiday (Oct 1-7)
3 hours ago
Koryx Copper Completes Haib PFS Drilling, Targets Updated Resource and PFS by Year-End
3 hours ago
Koryx Copper Completes Haib PFS Drilling, Targets Updated Resource and PFS by Year-End
Read More
Koryx Copper Completes Haib PFS Drilling, Targets Updated Resource and PFS by Year-End
Koryx Copper Completes Haib PFS Drilling, Targets Updated Resource and PFS by Year-End
Koryx Copper has completed its infill and expansion drilling programme at the wholly owned Haib Copper Project in southern Namibia, advancing the project toward an updated Mineral Resource Estimate (MRE) and Pre-Feasibility Study (PFS) targeted for publication before the end of 2026.​ The company reported assay results from a further 18 drill holes totalling 7,074 metres. Among the latest results, hole HM199 returned 438 metres grading 0.40% copper equivalent (CuEq), including 224 metres at 0.51% CuEq. Hole HM193 returned 681 metres at 0.34% CuEq, including 22 metres at 0.71% CuEq and 169 metres at 0.40% CuEq.​ Koryx said the results continued to demonstrate wide mineralised intercepts across the Haib deposit, together with higher-grade zones closer to surface in some areas. The company said the results broadly correlate with its existing geological model, while the completed drilling programme will feed into geological modelling and estimation work for the updated resource estimate and PFS.​ Haib is a large disseminated porphyry copper-molybdenum-gold deposit. Koryx currently envisages developing the project as a large-scale open-pit operation using conventional sulphide milling and flotation to produce copper and molybdenum concentrates.​ The latest drilling follows Koryx's March 2026 Mineral Resource Estimate, which reported 744 million mt of Indicated material grading 0.28% copper, containing approximately 2.09 million mt of copper, and 579 million mt of Inferred material grading 0.24% copper, containing approximately 1.39 million mt of copper, using a 0.15% copper cut-off. Koryx said the updated MRE and PFS remain on track for publication before the end of 2026.​ Completion of the PFS drilling programme marks another step in Koryx Copper's advancement of Haib toward a potential large-scale copper development. The latest drilling continues to show broad mineralised intervals, while the upcoming updated resource estimate will provide greater clarity on whether recent infill and expansion drilling has materially changed the project's resource base. Attention will now turn to the updated MRE and PFS expected before year-end, which should provide further detail on the proposed mine configuration, processing strategy, production profile and project economics.
3 hours ago