SMM Morning Comments (Jun 22)

Published: Jun 22, 2018 10:09 (GMT+8)
SMM Morning Comments

SHANGHAI, Jun 22 (SMM) –

Copper: LME copper moved around the daily moving average overnight with firm support at the $6,800/mt level, while the SHFE 1808 contract came off after hitting 51,880 yuan/mt. We see strong support for both LME and SHFE copper prices in the short term from the technical point of view, but copper supply in China has increased sharply amid sluggish demand plagued by higher borrowing costs. Spot discounts are seen at 160-100 yuan/mt.

Aluminium: As the US dollar slipped, LME aluminium rebounded to a high of $2,193/mt from a session-low of $2,162.5/mt overnight. We see pressure at the five-day moving average and support at the $2,160/mt level. LME aluminium is likely to trade rangebound at $2,165-2,196/mt today. As longs added their positions, the SHFE 1808 contract hit a high of 14,265 yuan/mt last night after touching a low of 14,165 yuan/mt. However, the contract fell and hovered around the daily moving average as longs’ confidence proved to be limited. On fundamentals, inventory destocking continued and costs extended declines. The 1808 contract is likely to test support at the five-day moving average today with a trading range at 14,150-14,300 yuan/mt. Spot discounts are seen at 60-20 yuan/mt.

Zinc: Shorts dragged LME zinc to a 10-month low overnight before it regained some losses. We see strong resistance at the lower Bollinger band and support at the $2,900/mt level. LME zinc is likely to consolidate at $2,900-2,950/mt today. Suppressed by shorts, the SHFE 1808 contract broke the previous low of 22,930 yuan/mt to 22,865 yuan/mt last night. It then rebounded to the 22,980 yuan/mt level. The short momentum was strong as daily moving average expanded downwards but risks of shorts taking profits increased. The 1808 contract is likely to trade at 22,700-23,150 yuan/mt today.

Nickel: Both LME nickel and the SHFE 1809 contract inched up due to declining inventory and falling domestic nickel pig iron output on environmental cuts. LME nickel returned back to the daily moving average overnight and closed at $15,075/mt as the US dollar edged down below 95. LME nickel is expected to hover at highs today. The SHFE 1809 contract mostly traded rangebound at the daily moving average during last night, and we see it hovering at 114,600-116,300 yuan/mt today. Spot prices are expected at 114,400-116,400 yuan/mt.

Lead: As market jitters lingered, LME lead fluctuated overnight and plummeted to a low of $2,365/mt at one point. Market participants were keen to take a watch-and-wait stance given the simmering global trade wars. The SHFE 1807 contract rebounded after it weakened to a low of 19,610 yuan/mt. Consecutive declines in SHFE lead prices significantly hit longs’ confidence and these investors were keen to leave when they could. If the contract extended its declines, market participants should watch out for an exodus of investors.

Tin: LME tin traded weakly overnight and dipped to a low of $20,415/mt. Without obvious support, it lost $110/mt from Wednesday night to close at $20,475/mt. We expect it to consolidate at current levels with support at $20,300/mt. The SHFE 1809 contract mostly traded below the five-day moving average last night, while inched up to close at 145,810 yuan/mt. Given a weakened LME tin and pessimistic outlook on both macroeconomics and fundamentals, the contract will trade with pressure in the short term. Support is seen at 143,000 yuan/mt.

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Selkirk Copper Targets H2 2028 Restart of Minto Mine Following Positive PEA
1 hour ago
Selkirk Copper Targets H2 2028 Restart of Minto Mine Following Positive PEA
Read More
Selkirk Copper Targets H2 2028 Restart of Minto Mine Following Positive PEA
Selkirk Copper Targets H2 2028 Restart of Minto Mine Following Positive PEA
Selkirk Copper Mines has outlined a potential restart of the past-producing Minto copper-gold-silver mine in Yukon, Canada, following the completion of a Preliminary Economic Assessment (PEA) that supports first concentrate production in the second half of 2028.​ The PEA outlines a 13-year mine life based on combined open-pit and underground mining, with operations designed around an average mining and milling rate of 4,100 mt/day. At peak production, the project is expected to produce approximately 27,200 mt/year of copper-equivalent contained in concentrate, equivalent to around 48,700 mt/year of high-grade copper-gold-silver concentrate.​ Initial capital required to re-establish production is estimated at C$186 million. Using the study's planning prices of US$5.00/lb copper, US$3,600/oz gold and US$50/oz silver, the PEA estimates an after-tax NPV at a 7% discount rate of C$494 million, an after-tax IRR of 47.8% and a payback period of approximately 1.9 years from first production.​ Minto benefits from substantial existing infrastructure from its previous operations, including a 4,100 mt/day processing plant as well as existing open-pit and underground infrastructure. Selkirk Copper said assessments of the site's existing infrastructure and equipment found that the majority remains in good working order and requires only minor attention and refurbishment.​ The company is targeting first concentrate production in H2 2028, followed by full ramp-up of mining, milling and concentrate production by H1 2029. A feasibility study is scheduled to begin in Q4 2026, while amended permit applications are also expected to be submitted during the fourth quarter. Selkirk Copper said a restart decision is targeted following completion of the feasibility study and receipt of permit amendments in H2 2027.​ The Minto PEA outlines a potential pathway for a previously producing copper operation to return to the market by 2028, supported by existing processing and mining infrastructure that could reduce the capital and construction requirements compared with a greenfield project. However, the 27,200 mt/year peak production figure represents copper-equivalent contained in concentrate rather than contained copper alone. The restart also remains subject to further feasibility work, permitting and project execution, making progress toward a restart decision in H2 2027 an important milestone to watch.
1 hour ago
Tschudi Copper Mine Targets Early-2027 Mining Restart in Namibia
1 hour ago
Tschudi Copper Mine Targets Early-2027 Mining Restart in Namibia
Read More
Tschudi Copper Mine Targets Early-2027 Mining Restart in Namibia
Tschudi Copper Mine Targets Early-2027 Mining Restart in Namibia
Consolidated Copper Corp (CCC) is targeting an early-2027 restart of open-pit mining at the Tschudi copper mine in northern Namibia, with an estimated US$30–40 million of development capital required to bring mining operations back online.​ Under the planned heap-leach restart, Tschudi is expected to reach run-rate copper cathode production of more than 14,000 mt/year over an initial 10-year mine life. CCC expects to complete a definitive feasibility study for the heap-leach mining restart in September 2026, with open-pit mining targeted to recommence in early 2027.​ The planned restart relates specifically to open-pit mining at Tschudi. Copper processing operations were restarted in 2024 using existing stockpiles, with CCC reporting production of more than 7,600 mt of copper cathode conforming to LME Grade A specifications as of June 2026. Tschudi previously produced approximately 75,000 mt of copper cathode between 2015 and 2020 before being placed on care and maintenance.​ The operation already has significant processing infrastructure in place, including a 2.88 million mt/year SX/EW plant. According to CCC, the US$30–40 million restart capital would primarily cover dewatering, mining mobilisation and demobilisation, a mobile crushing plant and development of a leach pad.​ CCC is also studying a larger expansion targeting Tschudi's sulphide resources. The concept includes construction of a 3 million mt/year flotation plant alongside the existing SX/EW operation, potentially increasing average annual production to approximately 30,000 mt of copper-equivalent over more than 10 years. The expansion remains under study and is separate from the planned heap-leach mining restart.​ The planned restart of open-pit mining at Tschudi could strengthen Namibia's copper supply by supporting run-rate cathode production of more than 14,000 mt/year if the project proceeds according to schedule. Existing SX/EW infrastructure and the relatively modest US$30–40 million restart capital requirement could support a faster return to mining compared with a greenfield development. However, the early-2027 restart remains a company target, with completion of the definitive feasibility study and subsequent mine mobilisation among the key milestones to watch.
1 hour ago
KCM Restarts Nchanga Smelter Following US$40 Million Rehabilitation
1 hour ago
KCM Restarts Nchanga Smelter Following US$40 Million Rehabilitation
Read More
KCM Restarts Nchanga Smelter Following US$40 Million Rehabilitation
KCM Restarts Nchanga Smelter Following US$40 Million Rehabilitation
Konkola Copper Mines (KCM) has restarted operations at its Nchanga Smelter in Zambia following the completion of a US$40 million rehabilitation programme, marking the facility's first major refurbishment in more than eight years.​ The smelter, which has an annual production capacity of 311,000 mt, was shut down for 106 days to allow comprehensive rehabilitation works to be carried out. The shutdown was initially planned to last 60 days but was extended after inspections identified additional critical works that needed to be completed.​ KCM Deputy Chief Executive Officer Satish Kumar said the rehabilitation forms part of efforts to rebuild the company and secure the long-term future of its operations following Vedanta Resources' return to KCM.​ According to KCM Smelter and Refinery Director Yoram Kapai, more than 1,500 people from KCM and its business partners participated in the rehabilitation programme. The company said the works were completed without any major injuries.​ The restart restores operations at a key processing facility within KCM's integrated copper operations in Zambia. Attention will now turn to the smelter's operational performance following the extended maintenance period and KCM's broader efforts to rebuild production across its mining and processing assets.​ The restart of the Nchanga Smelter removes a temporary processing constraint at KCM following the 106-day shutdown. With annual capacity of 311,000 mt, the facility is an important part of KCM's copper processing chain. The US$40 million rehabilitation could support improved operational reliability following years of limited major refurbishment, while the pace at which KCM increases mine supply and utilisation of its processing assets will remain important in determining the impact on Zambia's overall copper production.
1 hour ago