SMM Evening Comments (May 25)

Published: May 25, 2018 18:47 (GMT+8)
SMM Evening Comments

SHANGHAI, May 25 (SMM) – Nonferrous metals, except for SHFE tin, rose across the board on Friday May 25. SHFE nickel led the increases with a gain of 1.8%. SHFE zinc and aluminium gained over 1%, lead and copper inched up,

Most ferrous metals closed higher. Hot-rolled coil rose close to 1%, rebar and coke nudged up. Coking coal and iron ore dipped.

Copper: The SHFE 1807 contract rebounded from a low of 51,510 yuan/mt with resistance at the 51,640 yuan/mt level in the morning. As shorts cut their positions, the contract rose from a low of 51,380 yuan/mt in the afternoon. Technically, the contract now struggles among several moving averages with pressure at the five- and 60-day moving averages. We expect it to continue its rangebound pattern and to try to stand above the 51,500 yuan/mt level tonight.

Aluminium: The SHFE 1807 contract initially fell to a low of 14,730 yuan/mt as longs closed out their positions. It then hit a high of 14,875 yuan/mt as some longs entered the market. Some longs took profits and closed out their positions while some shorts left before the market closed. Today, SHFE aluminium regained some of this week's losses. We see further upward momentum for it as inventories decline. We expect it to rise together with moving averages below next week.

Zinc: As some shorts added their positions, the SHFE 1807 contract initially tumbled to a low of 23,450 yuan/mt. Trading levels rose to 23,600 yuan/mt as shorts reduced their positions. The contract rapidly climbed to a high of 23,700 yuan/mt before closure as shorts cut their positions again. SHFE zinc traded strongly rangebound and broke the pressure at the five-, 10- and 20-day moving averages during the day. We expect it to consolidate tonight.

Nickel: The market was buoyed by news that Jiangsu province had shut down induction furnaces. Longs bolstered the SHFE 1807 contract to hit a three-year high of 111,660 yuan/mt in the morning but the contract fell in the afternoon as longs cut their positions. We expect it to trade strongly rangebound tonight. Market participants can take more cues tonight from Federal Reserve Chairman Jerome Powell’s statements in a panel discussion in Sweden as well as the University of Michigan's consumer sentiment index for May.

Tin: As longs significantly closed down their positions, the SHFE 1809 contract fell during the day and touched a low of 146,400 yuan/mt before closure. We expect it to trade rangebound in the short term given a weak LME tin and an oversupply in China’s spot market. We see support at the 145,000 yuan/mt level and resistance at the 148,500 yuan/mt level.

Lead: Longs dragged the SHFE 1807 contract down to a low of 19,955 yuan/mt from a high of 20,225 yuan/mt during the day. We expect it to weaken tonight. 


For editorial queries, please contact Daisy Tseng at daisy@smm.cn 
For more information on how to access our research reports, please email service.en@smm.cn

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
Oct 02, 2026 16:31 (GMT+8)
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
Read More
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 have broken ground on a fourth grinding line at the Sierra Gorda copper-molybdenum mine in Chile's Atacama region. The US$725 million expansion runs for three years from January 2027, with completion by late 2029 and full output in H2 2030. Ore processing capacity rises 26%, from 131,000 tonnes per day to 165,000 tpd. Annual copper output is projected to climb from 165,000 tonnes in 2025 to 195,000 tonnes, with 6,000 tonnes of molybdenum, 58,000 ounces of gold and 1.7 million ounces of silver as by-products. The project creates over 900 direct jobs and is funded from operating cash flow and debt. Unit operating costs are expected to fall about 10%.
Oct 02, 2026 16:31 (GMT+8)
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Oct 02, 2026 15:31 (GMT+8)
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Read More
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Resources has provided an update on the Preliminary Feasibility Study (PFS) for its Iberian Belt West polymetallic project in Spain, saying the study is well advanced but remains under final technical review.​ The company said the review process has been expanded to include additional technical and quality-assurance oversight before publication. As a result, Emerita now expects the PFS to be released in the coming weeks rather than within the previously indicated timeframe.​ Iberian Belt West hosts copper, zinc, lead, gold and silver mineralization and is one of Emerita’s principal development-stage assets in Spain. The PFS is expected to provide updated detail on the proposed mine plan, processing configuration, capital requirements, operating costs and project economics.​ Emerita said the additional review work is intended to ensure consistency and completeness across the technical disciplines contributing to the study before it is finalized.​ The company did not announce a revised specific publication date, and no new production, capital or economic figures were disclosed in the latest update.​ The extended review delays the next major technical milestone for Iberian Belt West, but the company continues to indicate that the PFS is nearing completion. For the copper market, the significance of the study will depend on the production profile and project economics ultimately disclosed, particularly the contribution of copper relative to the project’s other payable metals. Attention will therefore remain on the timing of the PFS release and whether the final study materially changes the project’s development outlook.
Oct 02, 2026 15:31 (GMT+8)
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Oct 02, 2026 15:27 (GMT+8)
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Read More
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Minerals has reported additional drill results from its 2026 exploration programme at the Carmacks copper-gold project in Yukon, Canada, with new step-out drilling extending mineralization at Zone 2000S beyond the boundaries of the existing Mineral Resource.​ Drill hole CD-26-058 returned 75.55 metres grading 1.19% copper, 0.97 g/t gold, 10.4 g/t silver and 335 ppm molybdenum, equivalent to 2.18% copper-equivalent. The interval included 48.66 metres grading 1.61% copper, 1.39 g/t gold, 15.1 g/t silver and 475 ppm molybdenum, equivalent to 3.03% CuEq.​ Within the same hole, a higher-grade interval of 14.50 metres returned 2.30% copper, 2.68 g/t gold, 29.5 g/t silver and 1,015 ppm molybdenum, equivalent to 5.08% CuEq.​ A second hole, CD-26-059, intersected 93.99 metres grading 0.96% copper, 0.70 g/t gold, 4.6 g/t silver and 919 ppm molybdenum, equivalent to 1.94% CuEq. This included 63.97 metres at 1.26% copper, 0.96 g/t gold, 6.3 g/t silver and 1,049 ppm molybdenum, equivalent to 2.52% CuEq.​ Cascadia said the latest results continue to expand mineralization at Zone 2000S beyond the limits of the current Mineral Resource and highlight the higher-grade nature of the extension. The reported drill intervals represent drilled thicknesses, with true widths estimated at approximately 60–70%.​ The latest step-out results indicate that copper-gold mineralization at Zone 2000S extends beyond the boundaries of the current Carmacks Mineral Resource. The broad intervals and higher-grade internal zones could support future resource expansion if additional drilling confirms continuity. However, the new intersections have not yet been incorporated into an updated Mineral Resource Estimate, meaning their ultimate impact on project scale and mine planning remains to be determined.
Oct 02, 2026 15:27 (GMT+8)