Report: China’s passenger EV sales up 150% in Apr

Published: May 10, 2018 16:16
Sales of new-energy passenger vehicles in China came in at 73,145 units in April, up 150% year on year and up 31.3% month on month, according to data from China Passenger Car Association.

SHANGHAI, May 10 (SMM) – Sales of new-energy passenger vehicles in China came in at 73,145 units in April, up 150% year on year and up 31.3% month on month, according to data from China Passenger Car Association (CPCA) released on Wednesday May 9.

The jump in April suggested a continuous growing demand, Cui Dongshu, secretary general at CPCA, was quoted as saying in local media reports.

The A00 battery electric vehicles (BEVs), a small-sized vehicle with relatively short driving range, maintained its popularity among buyers in April. Sales of A00 BEVs stood at 29,579 units in April, up 87% on the year and 7% on the month, accounting for 52.4% of overall BEVs sales. April’s figure also brought its January-April sales up to 65% of the overall BEVs sales.

The new subsidy policy for new-energy vehicles (NEVs), effective from mid-June, will cut subsidies for those with relatively short driving range and raise subsidies for those with driving range of above 300 kilometres. This boosted the sales vehicles such as A00 BEVs during the transition period. In addition, A00 BEVs still have its market potential in the future as their costs decline.

Plug-in hybrid electric vehicles (PHEVs) saw strong performance in April with a year-on-year increase of 243%. Sales of PHEVs came in at 16,677 units last month, up 13% month on month. Total sales for the first four months of this year amounted to 54,058 units, up 269% year on year. Some buyers were more keen on PHEVs given the higher prices of BEVs and worries over the driving range.

 


For editorial queries, please contact Daisy Tseng at daisy@smm.cn 
For more information on how to access our research reports, please email service.en@smm.cn

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
54 mins ago
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
Read More
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
54 mins ago
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
4 hours ago
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
Read More
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
[SMM Flash] Greenland Mines has completed a 104.8-tonne bulk-sampling programme across seven sites at its Skaergaard palladium-platinum-gold project in East Greenland. The samples are being prepared for large-scale and pilot-scale metallurgical testwork at GTK Mintec in Finland, while the company continues engineering, processing, infrastructure and waste-management studies aimed at advancing the project's technical evaluation. Skaergaard's S-K 1300 resource currently comprises approximately 15.0 million oz PdEq Indicated and 17.49 million oz PdEq Inferred, according to Greenland Mines. The bulk-testing programme represents an important step in evaluating processing and recovery options for one of the larger undeveloped palladium-platinum-gold systems outside the major South African, Zimbabwean and Russian supply regions. However, the reported Mineral Resources are not Mineral Reserves and the latest programme does not constitute a development or commercial production decision.
4 hours ago
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
4 hours ago
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
Read More
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
[SMM Flash] Two Rivers, the South African PGM joint venture between African Rainbow Minerals and Impala Platinum, is advancing technical validation work for its Merensky project on the eastern limb of the Bushveld Complex. Early-works capital was approved during FY2026 to complete studies required to determine the project's way forward. The Merensky concentrator was commissioned during the six months to December 2024 but was subsequently placed on care and maintenance amid challenging PGM market conditions. The project has a stated capital cost of approximately R7.3 billion and is designed to produce around 182,000 6E PGM oz/year at steady state, alongside approximately 1,600 tonnes/year of nickel and 1,300 tonnes/year of copper. A restart could therefore provide meaningful incremental PGM supply from an existing South African operation. However, the project remains under technical validation and no restart date or final decision to resume production has been announced.
4 hours ago
Report: China’s passenger EV sales up 150% in Apr - Shanghai Metals Market (SMM)