Macro Roundup (May 7)

Published: May 7, 2018 09:11
A roundup of global macroeconomic news last weekend and what is expected today.

SHANGHAI, May 7 (SMM) – This is a roundup of global macroeconomic news last weekend and what is expected today.

Last weekend

The US dollar index surged and hit a four-month high at 92.90 last Friday, given the upbeat economic outlook, despite the nonfarm payrolls came out below expectation.

Most base metals rose as the US-China trade negotiations made some progress. LME aluminium jumped 2.6% and hit a two-week high. LME zinc gained 1.9%, rebound from a nine-month low with the recovery of risk appetite. LME lead closed 1.9% higher with nickel slightly up, but copper and tin dipped. SHFE metals also rose across the board except for tin following the strong performance of their LME peers.

China’s Caixin services purchasing managers’ index (PMI) climbed to 52.9 in April from March’s four-month low of 52.3 as new business and employment grew at a faster rate. The 50-mark separates growth from contraction. The composite PMI covering both the manufacturing and services sectors also rose to 52.3 in April from the previous month’s 51.8, indicating a relatively stable economic growth.

The retail sales in the eurozone grew 0.1% month on month in March, much slower than the expected 0.5% and the previous month’s 0.3% after revision. Its year-on-year growth stood at 0.8%, also lower than the expected 1.9% and the previous 1.8%. A declining demand for non-food items mainly contributed to the sharp slowdown in retail sales growth in March, particularly in clothing and pharmaceutical goods.

The US nonfarm payrolls increased by 164,000 in April, missing the expectations of 192,000.

The unemployment rate fell to 3.9% in April, an 18-year low, compared to the expected 4% and March’s 4.1%. This rate is not far from the Federal Reserve Board's forecast of 3.8% by the end of this year.

The closely-watched average hourly earnings rose 0.1% month on month in April, lower than the expected 0.2% and March’s 0.3% after downward revision. This equates to a year-on-year growth of 2.6%, lower than the expected 2.7% and in line with the previous rate after being downwardly revised from 2.7%.

The number of active US rigs for oil grew 9 units to 834 units over the week ended May 4. This marked five consecutive weeks of gains. Natural gas rigs increased 1 unit to 196 units, according to data from Baker Hughes.

Day ahead

Key factors to watch today include China’s foreign exchange reserves in April and the eurozone’s Sentix investor confidence index in May.

The US dollar is likely to remain rangebound at highs today with upbeat economic outlook.

 


For editorial queries, please contact Daisy Tseng at daisy@smm.cn 
For more information on how to access our research reports, please email service.en@smm.cn

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
14 hours ago
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
Read More
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
14 hours ago
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
17 hours ago
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
Read More
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
[SMM Flash] Greenland Mines has completed a 104.8-tonne bulk-sampling programme across seven sites at its Skaergaard palladium-platinum-gold project in East Greenland. The samples are being prepared for large-scale and pilot-scale metallurgical testwork at GTK Mintec in Finland, while the company continues engineering, processing, infrastructure and waste-management studies aimed at advancing the project's technical evaluation. Skaergaard's S-K 1300 resource currently comprises approximately 15.0 million oz PdEq Indicated and 17.49 million oz PdEq Inferred, according to Greenland Mines. The bulk-testing programme represents an important step in evaluating processing and recovery options for one of the larger undeveloped palladium-platinum-gold systems outside the major South African, Zimbabwean and Russian supply regions. However, the reported Mineral Resources are not Mineral Reserves and the latest programme does not constitute a development or commercial production decision.
17 hours ago
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
18 hours ago
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
Read More
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
[SMM Flash] Two Rivers, the South African PGM joint venture between African Rainbow Minerals and Impala Platinum, is advancing technical validation work for its Merensky project on the eastern limb of the Bushveld Complex. Early-works capital was approved during FY2026 to complete studies required to determine the project's way forward. The Merensky concentrator was commissioned during the six months to December 2024 but was subsequently placed on care and maintenance amid challenging PGM market conditions. The project has a stated capital cost of approximately R7.3 billion and is designed to produce around 182,000 6E PGM oz/year at steady state, alongside approximately 1,600 tonnes/year of nickel and 1,300 tonnes/year of copper. A restart could therefore provide meaningful incremental PGM supply from an existing South African operation. However, the project remains under technical validation and no restart date or final decision to resume production has been announced.
18 hours ago