SMM Evening Comments (Apr 23)

Published: Apr 23, 2018 18:30
SMM Evening Comments

SHANGHAI, Apr 23 (SMM) – Nonferrous metals saw mixed trading on Monday April 23. SHFE lead rose over 1% and copper gained close to 1%. Zinc and aluminium edged up slightly. Nickel and tin dipped.

The ferrous complex performed strongly across the board. Coke led with a gain of 3.87%, hot-rolled coil, coking coal and iron ore climbed over 2%. Rebar rose close to 2%.

Copper: As investors added their longs, the SHFE 1806 contract rose to a high of 52,050 yuan/mt today. It mostly traded above the day's moving averages. Technically, the contract stood between the 40- and 60- day moving averages with pressure at 52,000 yuan/mt. Support was seen at the five- and 10-day moving averages. It is likely to stand above 51,500 yuan/mt and test pressure above.

Aluminium: SHFE aluminium 1806 contract rose to a high of 15,055 yuan/mt at noon as trade conflicts eased during the weekend. We see the contract hover at high levels if no new development emerges from the US sanctions on Russia.

Zinc: The SHFE 1806 contract inched up with less brisk trades today. Despite shrinking inventories across major markets, most participants adopted a wait-and-watch stance due to a possible surge of supply in the near term. The contract is likely to hover at 24,500 yuan/mt if no guiding factor emerges.

Nickel: After it tested resistance from the five-day moving average today, the SHFE 1807 contract fell and hovered at 104,800 yuan/mt. We see support at the 10-day moving average tonight. Investors should take more cues from the US Markit Manufacturing Purchasing Managers Index (PMI) in April and pending home sales in March.

Lead: The SHFE 1806 contract led a gain across nonferrous metal today. It consolidated along the 18,420 yuan/mt level after it reached a high of 18,470 yuan/mt. We see support at the five- and 10-day moving averages and strong pressure at the 18,500 yuan/mt level. We expect SHFE lead to consolidate tonight.

Tin: While most base metals gained on a stronger ferrous metals performance, the SHFE 1809 contract dipped with pressure from shorts. As the 60- and five-day moving averages saw overlaps for three successive days, we see the contact likely to rebound in the short run.

 


For editorial queries, please contact Daisy Tseng at daisy@smm.cn 
For more information on how to access our research reports, please email service.en@smm.cn

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
22 hours ago
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
Read More
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
At 9:58 on September 12, the core smelting furnace of the pyrometallurgy system at Yingkou Jianfa Shenghai Nonferrous Metals & Chemicals Co., Ltd.'s multi-metal recovery project was successfully ignited, officially entering the furnace drying stage and marking a key step toward full-line commissioning and production. Public information shows that the Yingkou Jianfa Shenghai polymetallic complex gold-silver ore comprehensive recovery technology upgrade, relocation, and expansion project uses copper concentrates as its main raw material, with an overall planned capacity of 600,000 mt/year of copper cathode to be built in two phases, with capacity of 300,000 mt/year in each phase. Phase I is designed to produce 300,000 mt/year of copper cathode and 1.18 million mt/year of sulphuric acid, along with supporting systems for smelting, converting, anode refining, electrolysis, slag beneficiation, and precious metal recovery. After this ignition, the project will carry out standardized furnace drying and hot-state integrated trial runs across the entire system to verify equipment, instruments, interlocks, and automatic control systems. The project has not yet formally started raw material feeding and production; after furnace drying and system commissioning are completed, it will further advance the commissioning of Phase I's 300,000 mt/year copper cathode capacity. If the project is successfully brought into production, it is expected to increase copper smelting capacity in North China and further boost domestic demand for copper concentrate raw materials.
22 hours ago
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Sep 12, 2026 01:13
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Read More
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Alchemy Resources announced on September 11 that reverse-circulation drilling has commenced across its Yellow Mountain and Overflow projects in New South Wales, Australia, with up to 15 holes planned during the latest exploration campaign.​ At the 80%-owned Yellow Mountain project, drilling will test extensions to previously identified copper-gold and polymetallic mineralisation, as well as two previously undrilled geophysical targets.​ Previous drilling at Yellow Mountain returned an intersection of 113 metres grading 1.17% copper equivalent, comprising 0.33% copper, 0.37 g/t gold, 24.3 g/t silver, 0.86% lead and 1.23% zinc. The latest drilling campaign is designed to test whether the known mineralised system extends into newly identified target areas.​ The program will also include drilling at the Overflow project, where Alchemy is targeting extensions to existing mineralisation along strike and at depth. Overflow currently hosts an inferred mineral resource of approximately 342,000 ounces of gold equivalent and contains gold, silver, copper, lead and zinc mineralisation.​ The commencement of drilling provides a near-term test of the scale and continuity of mineralisation at Yellow Mountain. The previously reported broad copper-gold-polymetallic intersection indicates potential for a sizeable mineralised system, while the newly defined geophysical targets provide additional exploration upside. Drilling results will be important in determining whether the mineralised footprint can be materially expanded.
Sep 12, 2026 01:13
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Sep 12, 2026 01:10
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Read More
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Freeport-McMoRan Chief Executive Officer Kathleen Quirk has indicated that the company expects to move forward with the proposed expansion of its Bagdad copper mine in Arizona, marking a stronger commitment to the project ahead of a formal investment decision. Speaking at the Jefferies Global Industrials Conference on September 10, Quirk said the project still requires input from Freeport's board but that she expects the company will proceed. She described the expansion as a roughly three-year construction project and noted that no major permitting hurdles are expected. Freeport's latest project estimates put capital expenditure for the Bagdad expansion at approximately US$4.5 billion, around 30% above the previous US$3.5 billion estimate, reflecting cost escalation, scope changes and additional engineering. The project would more than double concentrator capacity at Bagdad and is expected to add approximately 200–250 million lb, or around 91,000–113,000 tonnes, of copper production annually, alongside an additional 10–12 million lb of molybdenum. Bagdad currently has a reserve life exceeding 80 years. Freeport's Q2 2026 regulatory filing had described the project as being prepared for a potential investment decision during the second half of 2026. The latest comments therefore represent a more positive signal from management on the likelihood of development, although formal board approval has not yet been announced. A decision to proceed with Bagdad would represent one of Freeport's most significant near-term copper growth investments in the US. The potential addition of more than 90,000 tonnes per year of copper would materially increase Freeport's US output, although first production would remain several years away given the expected construction period. Attention will now turn to formal board approval and a final investment decision.
Sep 12, 2026 01:10