Macro Roundup (Apr 4)

Published: Apr 4, 2018 10:11
Macro Roundup

SHANGHAI, Apr 4 (SMM) – This is a roundup of global macroeconomic news last night and what is expected today.

Last night

The US dollar inched up and stood firmly above 90 as US stocks rebounded and as the euro edged down.

SHFE metals fell across the board, except for copper and nickel, with zinc down close to 1%. Most LME metals gained, with nickel up close to 1%. LME copper touched a one-week high at one point and closed higher over 1%.

The final IHS Markit purchasing managers’ index (PMI) for eurozone’s manufacturing sector came in at 56.6, in line with the expectation. However, this marked an eight-month low and suggested a slowdown in the eurozone’s economic growth. Germany’s PMI stood at 58.2, while France’s PMI registered a one-year low of 53.7.

Chief economist at IHS Markit, Chris Williamson, said that there was no cause for concern by the decline in PMI as growth inevitably eased after the surge at the start of the year. “This has been clearly evident in the recent lengthening of supply delivery times. Some of the slowdown has also been attributable to temporary factors such as bad weather,” he added.

Inventories of US crude oil during the week ended March 30 dropped by 3.28 million barrels, according to data from the American Petroleum Institute. Gasoline inventories rose by 1.12 million barrels and refined oil inventories rose by 2.2 million barrels.

Day ahead

China’s Caixin service PMI in March stood at 52.3, lower than the expected 54.5 and the 54.2 in February.

Other key factors to watch today include the eurozone Consumer Price Index (CPI) in March, the US ADP employment data for March, its March’s ISM non-manufacturing PMI, and its weekly crude oil inventories.

The US dollar is likely to dip due to US’ Section 301 tariff on China today, while base metals are expected to trade rangebound with pressure today.

 


For editorial queries, please contact Daisy Tseng at daisy@smm.cn 
For more information on how to access our research reports, please email service.en@smm.cn

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
10 hours ago
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
Read More
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
10 hours ago
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
14 hours ago
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
Read More
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
[SMM Flash] Greenland Mines has completed a 104.8-tonne bulk-sampling programme across seven sites at its Skaergaard palladium-platinum-gold project in East Greenland. The samples are being prepared for large-scale and pilot-scale metallurgical testwork at GTK Mintec in Finland, while the company continues engineering, processing, infrastructure and waste-management studies aimed at advancing the project's technical evaluation. Skaergaard's S-K 1300 resource currently comprises approximately 15.0 million oz PdEq Indicated and 17.49 million oz PdEq Inferred, according to Greenland Mines. The bulk-testing programme represents an important step in evaluating processing and recovery options for one of the larger undeveloped palladium-platinum-gold systems outside the major South African, Zimbabwean and Russian supply regions. However, the reported Mineral Resources are not Mineral Reserves and the latest programme does not constitute a development or commercial production decision.
14 hours ago
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
14 hours ago
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
Read More
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
[SMM Flash] Two Rivers, the South African PGM joint venture between African Rainbow Minerals and Impala Platinum, is advancing technical validation work for its Merensky project on the eastern limb of the Bushveld Complex. Early-works capital was approved during FY2026 to complete studies required to determine the project's way forward. The Merensky concentrator was commissioned during the six months to December 2024 but was subsequently placed on care and maintenance amid challenging PGM market conditions. The project has a stated capital cost of approximately R7.3 billion and is designed to produce around 182,000 6E PGM oz/year at steady state, alongside approximately 1,600 tonnes/year of nickel and 1,300 tonnes/year of copper. A restart could therefore provide meaningful incremental PGM supply from an existing South African operation. However, the project remains under technical validation and no restart date or final decision to resume production has been announced.
14 hours ago
Macro Roundup (Apr 4) - Shanghai Metals Market (SMM)