OPEC, Russia extend oil output cut till end of 2018

Published: Dec 13, 2017 15:06
OPEC members and Russia have decided to extend the crude oil production cut agreement until the end of 2018, surprising market participants.

SHANGHAI, Dec 13 (SMM)-OPEC members and Russia have decided to extend the crude oil production cut agreement until the end of 2018, surprising market participants.

According to OPEC secretary general Mohammad Barkindo, crude oil inventory has declined and that strong economic growth, especially that of China, can continue to support the market. In addition, global oil demand is forecast to stay at 1.5 million barrels per day in 2018, same as this year, Barkindo said at a meeting on Wednesday in Beijing. 

He added that China’s economic growth is estimated to be 6.8% this year and 6.5% next year.


The article is edited by SMM and is provided for information purpose only. It does not mean SMM agrees with its views and SMM assumes no liability for accuracy of information contained or quoted in the article.
 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
3 Dutch Ports (Inc. Rotterdam) Strike Planned for September 4, Cargo Handling and Logistics Face Disruption
4 hours ago
3 Dutch Ports (Inc. Rotterdam) Strike Planned for September 4, Cargo Handling and Logistics Face Disruption
Read More
3 Dutch Ports (Inc. Rotterdam) Strike Planned for September 4, Cargo Handling and Logistics Face Disruption
3 Dutch Ports (Inc. Rotterdam) Strike Planned for September 4, Cargo Handling and Logistics Face Disruption
According to an August 28 advisory from logistics company Beckchoice, Dutch unions FNV and CNV have called on workers in Rotterdam, Amsterdam and Zeeland ports to halt ship-handling activities from 11:15 to 19:00 local time on September 4. The action is part of a campaign against proposed changes and cuts to the Netherlands’ social security system. The planned stoppage could disrupt cargo loading and unloading, towage and related operations, delaying vessel schedules, cargo collections and onward transport. Some disruption could persist beyond the strike period, with the extent depending on worker participation and individual terminal operations.
4 hours ago
Doubling Surge! Copper Foil Semi-Annual Report Reveals Bottom Line, Volume and Price Rise Kick Off High-Level Market [SMM Analysis]
8 hours ago
Doubling Surge! Copper Foil Semi-Annual Report Reveals Bottom Line, Volume and Price Rise Kick Off High-Level Market [SMM Analysis]
Read More
Doubling Surge! Copper Foil Semi-Annual Report Reveals Bottom Line, Volume and Price Rise Kick Off High-Level Market [SMM Analysis]
Doubling Surge! Copper Foil Semi-Annual Report Reveals Bottom Line, Volume and Price Rise Kick Off High-Level Market [SMM Analysis]
The 2026 semi-annual report disclosure season has concluded, with publicly listed firms across China's copper foil industry chain delivering impressive interim results. Driven by sustained growth in ESS installations, rising NEV penetration rates, and accelerated construction of AI computing infrastructure, the industry has emerged from a two-year downturn and entered an upward cycle of rising volumes and prices...
8 hours ago
Xinhai Mining nears completion of 1.5 Mt/y copper flotation plant in Kazakhstan
8 hours ago
Xinhai Mining nears completion of 1.5 Mt/y copper flotation plant in Kazakhstan
Read More
Xinhai Mining nears completion of 1.5 Mt/y copper flotation plant in Kazakhstan
Xinhai Mining nears completion of 1.5 Mt/y copper flotation plant in Kazakhstan
Shandong Xinhai Mining's 1.5 million tonnes per year sulphide-copper flotation plant in Kazakhstan has entered the equipment installation and commissioning phase, with civil works past the halfway mark and all major equipment foundations accepted. Delivered under a full EPC+M+O contract, the plant treats ore averaging 0.86% copper and is designed for a 22% copper concentrate grade at 90% recovery, processing 5,000 tonnes per day over 300 operating days. Work started in October 2025, resumed in April 2026 after winter, and is scheduled for civil completion by end-September and full commissioning by year-end. Onstream, it will recover roughly 11,600 tonnes of copper metal annually.
8 hours ago