SHANGHAI, Dec.6 (SMM)-Today a battery material plant of Aleees began construction in Guian New District, Guizhou Province. The plant is planned to reach annual capacity of 60,000 tons in 2020, which is expected to be the world’s largest production base of new-energy battery materials.
The article is edited by SMM and is provided for information purpose only. It does not mean SMM agrees with its views and SMM assumes no liability for accuracy of information contained or quoted in the article.
![[SMM Analysis] Futures Lack Momentum to Rise Further, Pre-Holiday Demand Stalls, and Stainless Steel Social Inventory Accumulation Intensifies](https://imgqn.smm.cn/usercenter/HBsPu20251217171723.jpeg)

![Accelerated Improvement of the Magnesium Industry Standard System, Multiple Key Standards Intensively Released and Implemented [SMM Survey]](https://imgqn.smm.cn/usercenter/tfLay20251217171725.jpg)
