SHFE Base Metals Mostly Move High, with SHFE Lead & Zinc Leading Gain (2017-12-04)

Published: Dec 04, 2017 17:21 (GMT+8)
Today most nonferrous metals move high with mixed results. SHFE Lead and Zinc rise over 2%.

SHANGHAI, Dec.4 (SMM)-Today most nonferrous metals move high with mixed results. SHFE Lead and Zinc rise over 2%. SHFE Nickel rises nearly 2%. SHFE Copper rises over 1%. SHFE Tin slight gains. SHFE Aluminium continues to move low after open with 0.38% drop at closure. Ferrous metals move high. Iron ore surges by 4.78%. Hot-rolled coil rises 2.46%. RB steel rises nearly 2%. Coke rises nearly 1%. Coking coal drops 0.79%.

Copper: Today SHFE copper raises its core with a winning streak. Tonight it is estimated to keep moving at high level. See US factory’s orders monthly growth in October.

Nickel: Today SHFE Nickel gains a capital inflow of 122 million. Tonight SHFE Nickel is estimated to keep volatile and reorganize. See US factory’s orders monthly growth in October and final value of monthly growth of durable goods orders except transportation in October.

Tin: Today some kinds of metals perform excellent. SHFE Tin is just so-so. Failing to break upper pressure of moving averages, tonight it is estimated to test maintenance of upward tendency with resistance of 142,500 yuan per ton and support at 140,000 yuan per ton.

Zinc: Today SHFE Zinc keeps stable with a long upper shadow at closure. With great upward impetus, main part still fails to get rid of 20-day and 40-day moving average. In night it is estimated to stand above all averages.

Lead: SHFE Lead closes with a long upper shadow but still lacks upward impetus. With great pressure of upper 40-day and 60-day moving averages, it may wander around 19,000 yuan per ton. Meanwhile it gets some support at below 20-day moving average. Tonight it is estimated to keep volatile.

Aluminium: Maintain views on SHFE Aluminium of volatile downward tendency.


For news cooperation, please contact us by email: gaotian@smm.cn or service.en@smm.cn. 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
SHFE: Approves Jinchuan Group Co., Ltd. to increase the registered production site for “JNMC” brand Grade A copper (permanent cathode-K)
1 hour ago
SHFE: Approves Jinchuan Group Co., Ltd. to increase the registered production site for “JNMC” brand Grade A copper (permanent cathode-K)
Read More
SHFE: Approves Jinchuan Group Co., Ltd. to increase the registered production site for “JNMC” brand Grade A copper (permanent cathode-K)
SHFE: Approves Jinchuan Group Co., Ltd. to increase the registered production site for “JNMC” brand Grade A copper (permanent cathode-K)
1 hour ago
[SMM Announcement] Chinese Market Metal Prices and News Updates Suspended during National Day Holiday (Oct 1-7)
1 hour ago
[SMM Announcement] Chinese Market Metal Prices and News Updates Suspended during National Day Holiday (Oct 1-7)
Read More
[SMM Announcement] Chinese Market Metal Prices and News Updates Suspended during National Day Holiday (Oct 1-7)
[SMM Announcement] Chinese Market Metal Prices and News Updates Suspended during National Day Holiday (Oct 1-7)
1 hour ago
Koryx Copper Completes Haib PFS Drilling, Targets Updated Resource and PFS by Year-End
1 hour ago
Koryx Copper Completes Haib PFS Drilling, Targets Updated Resource and PFS by Year-End
Read More
Koryx Copper Completes Haib PFS Drilling, Targets Updated Resource and PFS by Year-End
Koryx Copper Completes Haib PFS Drilling, Targets Updated Resource and PFS by Year-End
Koryx Copper has completed its infill and expansion drilling programme at the wholly owned Haib Copper Project in southern Namibia, advancing the project toward an updated Mineral Resource Estimate (MRE) and Pre-Feasibility Study (PFS) targeted for publication before the end of 2026.​ The company reported assay results from a further 18 drill holes totalling 7,074 metres. Among the latest results, hole HM199 returned 438 metres grading 0.40% copper equivalent (CuEq), including 224 metres at 0.51% CuEq. Hole HM193 returned 681 metres at 0.34% CuEq, including 22 metres at 0.71% CuEq and 169 metres at 0.40% CuEq.​ Koryx said the results continued to demonstrate wide mineralised intercepts across the Haib deposit, together with higher-grade zones closer to surface in some areas. The company said the results broadly correlate with its existing geological model, while the completed drilling programme will feed into geological modelling and estimation work for the updated resource estimate and PFS.​ Haib is a large disseminated porphyry copper-molybdenum-gold deposit. Koryx currently envisages developing the project as a large-scale open-pit operation using conventional sulphide milling and flotation to produce copper and molybdenum concentrates.​ The latest drilling follows Koryx's March 2026 Mineral Resource Estimate, which reported 744 million mt of Indicated material grading 0.28% copper, containing approximately 2.09 million mt of copper, and 579 million mt of Inferred material grading 0.24% copper, containing approximately 1.39 million mt of copper, using a 0.15% copper cut-off. Koryx said the updated MRE and PFS remain on track for publication before the end of 2026.​ Completion of the PFS drilling programme marks another step in Koryx Copper's advancement of Haib toward a potential large-scale copper development. The latest drilling continues to show broad mineralised intervals, while the upcoming updated resource estimate will provide greater clarity on whether recent infill and expansion drilling has materially changed the project's resource base. Attention will now turn to the updated MRE and PFS expected before year-end, which should provide further detail on the proposed mine configuration, processing strategy, production profile and project economics.
1 hour ago