North China City Introduced Stagger Production Plan

Published: Oct 12, 2017 11:24
The key controlling and regulating time is from Nov.15th, 2017 to March 15th, 2018, lasting 4 months. That of coking industry is from Oct.1st, 2017 to March 31st, 2018, lasting 6 months.

SHANGHAI, Oct. 12 (SMM)-The key controlling and regulating time is from Nov.15th, 2017 to March 15th, 2018, lasting 4 months. That of coking industry is from Oct.1st, 2017 to March 31st, 2018, lasting 6 months. Thereinto, the 1# blast furnace of Yongfeng Zibo and 1# pelletizing production line of Zibo Tieying Steel should limit their production by 50% and the enterprises should make the detailed plan for consecutive 60 days suspension during hearing season. 1# and 2# blast furnaces of Qilin Boshan Steel and Longsheng Steel should limit by 50%, calculating by furnace capacity. During the heating season, those enterprises can only launch one blast furnace.


The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.
For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Feihushan Lead-Zinc Mine Project Advances in Heilongjiang, Aims for 300,000 mt Annual Ore Capacity
Apr 23, 2026 19:50
Feihushan Lead-Zinc Mine Project Advances in Heilongjiang, Aims for 300,000 mt Annual Ore Capacity
Read More
Feihushan Lead-Zinc Mine Project Advances in Heilongjiang, Aims for 300,000 mt Annual Ore Capacity
Feihushan Lead-Zinc Mine Project Advances in Heilongjiang, Aims for 300,000 mt Annual Ore Capacity
[Lead-Zinc Ore Market Dynamics] A project advancement meeting for the Feihushan lead-zinc mine was held this week in Huzhong District, Heilongjiang, chaired by Guan Jingjun, Deputy Secretary of the District Party Committee and District Governor. The total investment for the Feihushan lead-zinc polymetallic mine development project is expected to be 396.7111 million yuan, with all required funds to be self-raised by the enterprise. Upon completion, the project will have an annual capacity of 300,000 mt of raw ore (including 200,000 mt of lead-zinc ore and 100,000 mt of iron ore). The mineral processing products will be lead concentrates, zinc concentrates, and iron ore concentrates, with a service life of 14 years (excluding a 4-year construction period).
Apr 23, 2026 19:50
Yingkou FTZ to Approve 5,000 mt/year Waste Lead-Acid Battery Collection Project
Apr 23, 2026 19:27
Yingkou FTZ to Approve 5,000 mt/year Waste Lead-Acid Battery Collection Project
Read More
Yingkou FTZ to Approve 5,000 mt/year Waste Lead-Acid Battery Collection Project
Yingkou FTZ to Approve 5,000 mt/year Waste Lead-Acid Battery Collection Project
[Waste Lead-Acid Battery Market Dynamics] It was reported that the website of the Yingkou Area of the China (Liaoning) Pilot Free Trade Zone recently published the "Public Notice of the Management Committee of the Yingkou Area of the China (Liaoning) Pilot Free Trade Zone on the Acceptance of the Environmental Impact Assessment Report for the Waste Lead-Acid Battery Collection (5,000 mt/year) Project of Fenghuan (Yingkou) Environmental Technology Co., Ltd." Upon completion, the project will have a waste lead-acid battery turnover capacity of 5,000 mt/a and a maximum storage capacity of 100 mt.
Apr 23, 2026 19:27
Bank of Jiujiang Hefei Branch Approves 280M Yuan Credit Line for Anhui Lukong Environmental Protection
Apr 17, 2026 18:05
Bank of Jiujiang Hefei Branch Approves 280M Yuan Credit Line for Anhui Lukong Environmental Protection
Read More
Bank of Jiujiang Hefei Branch Approves 280M Yuan Credit Line for Anhui Lukong Environmental Protection
Bank of Jiujiang Hefei Branch Approves 280M Yuan Credit Line for Anhui Lukong Environmental Protection
[Secondary Lead Market Update] It was reported that recently, the Hefei Branch of Bank of Jiujiang, in response to the characteristics of the secondary lead industry — "capital-intensive raw material procurement and urgent production turnover needs" — assembled a professional team and customized a comprehensive financial service plan, ultimately approving a credit line of 280 million yuan for Anhui Lukong Environmental Protection Co., Ltd.
Apr 17, 2026 18:05
North China City Introduced Stagger Production Plan - Shanghai Metals Market (SMM)