SHANGHAI, Sept. 22 (SMM) – Shougang Hierro Peru will put the $1.5 billion worth of iron mine brownfield project into production in H2 2018, which is located in Marcona.
It will increase ore processing capacity at the mine to 20 million tonne per annum.
Yonggang Suspends Wire Rod Plant for Maintenance
The iron mine has 2.18 billion tonnes of proven iron reserves, grading 55%. Besides, it also contains copper and zinc.
The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.
For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.
For queries, please contact William Gu at williamgu@smm.cn
For more information on how to access our research reports, please email service.en@smm.cn