SHANGHAI, Sept. 9 (SMM) - Handan government decided to suspend all pellet shaft furnaces and sintering machines at local steel plants from September 18 for air quality.
When they will be allowed to restart these facilities is still indeterminate.
Tonghua Iron & Steel Delays Restart Plan on Environmental Protection, SMM Reports
Besides, all local foundry plants and carbon plants are also required to shut down.
Chengde Iron & Steel to Dismantle One Blast Furnace in Late September
Coking production is prolonged over 48 hours.
The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.
For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.
For queries, please contact William Gu at williamgu@smm.cn
For more information on how to access our research reports, please email service.en@smm.cn