Henan Releases Program for Alumina and Aluminum Cuts in Winter Heating Season 

Published: Sep 11, 2017 18:53
Henan Province has released Industrial Enterprise Off-Peak Production Implementation Program in Autumn and Winter 2017-2018 (draft for comments).

SHANGHAI, Sept. 11 (SMM) – Henan Province has released Industrial Enterprise Off-Peak Production Implementation Program in Autumn and Winter 2017-2018 (draft for comments).

China Alumina Output Jumps in August, Despite Ore Shortage, SMM Reports

According to the program, local 13 aluminum smelters shall cut capacity by over 30% based on the number of electrolytic cells during Nov. 15, 2017-Mar. 15, 2018. Meanwhile, local 11 alumina producers shall slash capacity by over 30% based on the number of production lines. Regulators will conduct on-site checks to find whether capacity is cut in compliance with regulations. 

Breaking News: Henan to Suspend Construction and Expansion of Small Bauxite and Iron Ore Mines

The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.
 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Guinea Exports 20.26M Tons of Bauxite, 46,764 Tons of Alumina in Jan 2026; SMB Leads with 6.57M Tons
2 hours ago
Guinea Exports 20.26M Tons of Bauxite, 46,764 Tons of Alumina in Jan 2026; SMB Leads with 6.57M Tons
Read More
Guinea Exports 20.26M Tons of Bauxite, 46,764 Tons of Alumina in Jan 2026; SMB Leads with 6.57M Tons
Guinea Exports 20.26M Tons of Bauxite, 46,764 Tons of Alumina in Jan 2026; SMB Leads with 6.57M Tons
[SMM Aluminum Express News] Guinea Bauxite & Alumina Exports in January 2026. Ministry of Mines and Geology reports: Total bauxite 20.26 million tons; alumina 46,764 tons. Bauxite Highlights (top contributors): 1. SMB: 6.57 Mt (32 vessels) – leading exporter 2. Chalco: 2.64 Mt (14 vessels) 3. CBG: 1.64 Mt (28 vessels) 4. Zhicheng Guinee Mining/GBT: 0.94 Mt (5 vessels) 5. CDM China: 0.94 Mt (5 vessels) Other key volumes: 6. Cobad: 0.82 Mt 7. AMC: 0.79 Mt 8. BAM: 0.63 Mt 9. KBM: 0.58 Mt Alumina: 1. Friguia: 46,764 tons (2 vessels) – sole reported exporter
2 hours ago
SHFE Cast Aluminum Alloy Warrants Down by 1,114 mt to 62,228 mt on March 4
3 hours ago
SHFE Cast Aluminum Alloy Warrants Down by 1,114 mt to 62,228 mt on March 4
Read More
SHFE Cast Aluminum Alloy Warrants Down by 1,114 mt to 62,228 mt on March 4
SHFE Cast Aluminum Alloy Warrants Down by 1,114 mt to 62,228 mt on March 4
[SMM Flash] SHFE data showed that on March 4, the total registered volume of cast aluminum alloy warrants was 62,228 mt, down 1,114 mt from the previous trading day. Among them, the total registered volume in Shanghai was 5,949 mt, down 121 mt from the previous trading day; Guangdong was 20,908 mt, down 181 mt; Jiangsu was 7,930 mt, down 150 mt; Zhejiang was 20,740 mt, down 422 mt; Chongqing was 4,384 mt, down 150 mt; and Sichuan was 1,203 mt, down 90 mt.
3 hours ago
Danantara, INA, and Chandra Asri Sign Agreement to Fund $800M CA-EDC Plant in Cilegon
3 hours ago
Danantara, INA, and Chandra Asri Sign Agreement to Fund $800M CA-EDC Plant in Cilegon
Read More
Danantara, INA, and Chandra Asri Sign Agreement to Fund $800M CA-EDC Plant in Cilegon
Danantara, INA, and Chandra Asri Sign Agreement to Fund $800M CA-EDC Plant in Cilegon
[SMM Aluminum Express News] Danantara Indonesia, INA, and Chandra Asri Group signed a Conditional Share Subscription Agreement (CSSA) to fund the Chlor Alkali & Ethylene Dichloride (CA-EDC) plant in Cilegon, Banten. INA Acting CEO Eddy Porwanto Poo said the investment supports national priorities, partnering with Southeast Asia’s leading petrochemical player to expand strategic raw materials, advance downstream industries, boost domestic value creation, and strengthen industrial resilience. The USD 800 million National Strategic Project (PSN) will increase local production of Caustic Soda and EDC, cut import reliance, and enhance supply resilience. Danantara and INA will jointly invest USD 200 million, with operations starting in 2027.
3 hours ago
Henan Releases Program for Alumina and Aluminum Cuts in Winter Heating Season  - Shanghai Metals Market (SMM)